October 1, 2024 |
Final Pre-Excavation Analytical Data Summary and Excavation Plan for Remedial Action RVAAP-063-R-01 for Group 8 Munitions Response Site, June 27, 2024
|
September 27, 2024 |
Final Remedial Design Remedial Action at RVAAP-06 C Block Quarry, September 6, 2024
Final Remedial Design Remedial Action at RVAAP-50 Atlas Scrap Yard, September 4, 2024
Final Uniform Federal Policy - Quality Assurance Project Plan for the CC RVAAP-69 Building 1048 Fire Station Vapor Intrusion Study of Building 1037, June 7, 2024
|
September 6, 2024 |
Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2024, August 20, 2024
Final Removal Action Work Plan at CC RVAAP-70 East Classification Yard, August 14, 2024
Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2023 Sampling Event, July 19, 2024
|
August 1, 2024 |
Final Remedial Investigation Addendum for CC RVAAP-79 DLA Ore Storage Sites, Ore Storage Pond Sub-Area
|
June 28, 2024 |
The Ravenna Army Ammunition Plant and the Ohio Environmental Protection Agency Correspondences for CY2023, January 1, 2023
|
May 1, 2024 |
Final Remedial Investigation Post-Blow-In Place Munitions Constituent Soil Sampling Memo for RVAAP-004-R-01 Open Demolition Area #2, March 4, 2024
|
March 29, 2024 |
Final 2023 Annual Land Use Control Monitoring Report, RVAAP-01 RQL, RVAAP-04 ODA #2, RVAAP-05 WBG, RVAAP-08 through RVAAP-12 Load Lines 1-4 and 12, and RVAAP-51 DAPWR, February 22, 2024
Final Uniform Federal Policy - Quality Assurance Project Plan for Additional Remedial Design Sampling at Multiple Areas of Concern, February 13, 2024
Final Uniform Federal Policy - Quality Assurance Project Plan for Additional Delineation Sampling at RVAAP-34 Sand Creek Disposal Road Landfill, February 13, 2024
|
March 1, 2024 |
Final 2023 Annual Land Use Control Monitoring Report, RVAAP-01 RQL, RVAAP-04 ODA #2, RVAAP-05 WBG, RVAAP-08 through RVAAP-12 Load Lines 1-4 and 12, and RVAAP-51 DAPWR, February 22, 2024
|
January 30, 2024 |
Correspondence - Army National Guard - RVAAP Restoration Program - DFFO Monthly Summary Report - September 2022, October 6, 2022
Correspondence - Army National Guard - RVAAP Restoration Program - DFFO Monthly Summary Report - August 2022, September 7, 2022
Memorandum for Record, Summary of Findings, Magnetometer-Assisted Survey of Sand Creek conducted on 8-12 January 2024 as related to the Time Critical Removal Action for Open Demolition Area #2, January 22, 2024
|
December 22, 2023 |
Final Remedial Investigation Quality Assurance Project Plan, RVAAP-004-R-01 Open Demolition Area #2, Mar. 1, 2023
The Ravenna Army Ammunition Plant and the Ohio Environmental Protection Agency Correspondences for CY2022, January 1, 2022
Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Feb. 26, 2019
|
December 7, 2023 |
Public Meeting: Proposed Plan for RVAAP-03 Open Demolition Area #1, January 19, 2021, Jan. 19, 2021
Public Meeting: Proposed Plan for CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, September 22, 2020, Sept. 22, 2020
Public Meeting: Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry; Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, August 26, 2020, Aug. 26, 2020
Public Meeting Memorandum for RVAAP-063-R-01 Group 8 Munitions Response Site, March 11, 2020, March 11, 2020
Public Meeting: Proposed Plan for Sediment and Surface Water at Six Areas of Concern/Munitions Response Sites, August 29, 2019, Aug. 29, 2019
Public Meeting: Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-19, Landfill North Of Winklepeck Burning Grounds, RVAAP-38, NACA Test Area, and RVAAP-46, Buildings F-15 and F-16, Aug. 15, 2019
Public Meeting: Proposed Plan for Soil, Sediment, and Surface Water at RVAAP Load Lines 1, 2, 3, 4, and 12, June 20, 2019, June 20, 2019
Public Meeting: RVAAP-001-R-01 Ramsdell Quarry Area 2 (South), RVAAP-060-R-01 Block D Igloo, RVAAP-002-R-01 Erie Burning Grounds Munitions Response Sites, March 6, 2019, Apr. 1, 2019
Public Meeting: RVAAP-032-R-01 40MM Firing Range and RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Sites, November 1, 2018, March 26, 2019
Public Meeting: Proposed Plans for RVAAP-12 Load Line 12, RVAAP-40 Load Line 7, RVAAP-42 Load Line 9, RVAAP-29 Upper and Lower Cobbs Ponds and RVAAP-45 Wet Storage Area, June 21, 2018
Public Meeting: CC RVAAP-73 Facility-Wide Coal Storage and CC RVAAP-76 Depot Area, February 28, 2018, Feb. 28, 2018
Public Meeting: RVAAP-050-R-01 Atlas Scrap Yard; RVAAP-061-R-01 Block D Igloo TD; RVAAP-019-R-01 Landfill North of Winklepeck Burning Grounds; RVAAP-001-R-02 Ramsdell Quarry Landfill Area 1 (North) Munitions Response Sites, December 12, 2017 , Dec. 12, 2017
Public Meeting:RVAAP-39 Load Line 5; RVAAP-33 Load Line 6; RVAAP-41 Load Line 8; RVAAP-44 Load Line 11, June 27, 2017, June 27, 2017
Public Meeting: Proposed Plans for Soil, Sediment and Surface Water for RVAAP-43 Load Line 10, CC RVAAP-68 Electric Substations (East, West, No. 3) and RVAAP-51 Dump Along Paris-Windham Road, November 29, 2016, Nov. 29, 2016
|
November 30, 2023 |
Final Action Memorandum Time-Critical Removal Action RVAAP-004-R-01 Open Demolition Area #2, October 30, 2015
Final Action Memorandum for RVAAP-67 Facility-wide Sewers: Load Line 2 Functional Area and CC RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, September 21, 2017
Final Action Memorandum: RVAAP-34 Sand Creek Disposal Road Landfill, September 1, 2019
Final Action Memorandum: RVAAP-28 Suspected Mustard Agent Burial Site at Camp Ravenna Joint Military Training Center, July 27, 2017
Final Action Memorandum for RVAAP-49 Central Burn Pits at Ravenna Army Ammunition Plant, June 20, 2007
Final Action Memorandum for CC RVAAP-70 East Classification Yard Revision 1.0, June 17, 2021
Final Action Memorandum CC RVAAP-78 Quarry Pond Surface Dump, March 5, 2020
Final Action Memorandum for a Removal Action at Paris-Windham Road Dumpsite RVAAP-51, January 6, 2003
Final Action Memorandum for a Removal Action at Sand Creek Dumpsite RVAAP-34, January 6, 2003
|
October 31, 2023 |
Final Uniform Federal Policy Quality Assurance Project Plan for Remedial Action Work Plan for RVAAP-063-R-01 Group 8 Munitions Response Site
FY2023 Ravenna Army Ammunition Plant Army Cleanup Program Installation Action Plan
|
September 29, 2023 |
Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2022 Sampling Event
Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2022
|
August 31, 2023 |
Final Uniform Federal Policy Quality Assurance Project Plan for Remedial Action Work Plan for RVAAP-063-R-01 Group 8 Munitions Response Site
Final Remedial Investigation Addendum for CC RVAAP-79 DLA Ore Storage Sites, Ore Storage Pond Sub-Area
|
July 21, 2023 |
Final Uniform Federal Policy Quality Assurance Project Plan for Remedial Action Work Plan for RVAAP-063-R-01 Group 8 Munitions Response Site
The Ravenna Army Ammunition Plant and the Ohio Environmental Protection Agency Correspondences for CY2021
|
June 29, 2023 |
Final Uniform Federal Policy Quality Assurance Project Plan for Remedial Action RVAAP-060-R-01 Block D Igloo Munitions Response Site
Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Annual Report for 2021
Final Remedial Investigation Report Facility-wide Groundwater Monitoring Program Groundwater Investigation and Reporting Services, Volumes 1 and 2
|
May 31, 2023 |
Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2022 Sampling Event, May 11, 2023
Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Annual Report for 2022, May 3, 2023
Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2023, May 3, 2023
|
May 1, 2023 |
Final Remedial Investigation for CC RVAAP-69 Building 1048 Fire Station, Feb. 14, 2023 |
March 31, 2023 |
Final 2022 Annual Land Use Control Monitoring Report, RVAAP-01 RQL, RVAAP-04 ODA #2, RVAAP-05 WBG, RVAAP-08 through RVAAP-12 Load Lines 1-4 and 12, and RVAAP-51 DAPWR, March 27, 2023
Final Uniform Federal Policy Quality Assurance Project Plan for Remedial Action RVAAP-060-R-01 Block D Igloo Munitions Response Site, Feb. 8, 2023
|
Feb. 27, 2023 |
Final Revised Property Management Plan for the Designated Areas of Concern and Munitions Response Sites, Version 4.1, Feb. 1, 2023
|
Jan. 26, 2023 |
Revised Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, June 10, 2022
Memorandum for Record, Summary of Findings, Magnetometer-Assisted Survey of Sand Creek conducted on 31 May to 4 June 2022 as related to the Time Critical Removal Action for Open Demolition Area #2, June 4, 2022
|
Dec. 28, 2022 |
Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Annual Report for 2021, Sept. 21, 2022
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Version 2.0 , Jul. 27, 2022
|
Nov. 30, 2022 |
Final Feasibility Study Monitoring Well Installation Plan for RVAAP-66 Facility-wide Groundwater, Nov. 17, 2022
Final Remedial Action Completion Report for Soil, Sediment, and Surface Water At Multiple Areas of Concern, Nov. 1, 2022
FY2022 Ravenna Army Ammunition Plant Army Cleanup Program Installation Action Plan, Oct. 1, 2022
Final Third Five-Year Review Report, Aug. 10, 2022
Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2022, April 28, 2022
|
Mar. 29, 2022 |
Revised Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, Jun. 10, 2022
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Mar. 1, 2022
Final 2021 Annual Land Use Control Monitoring Report, RVAAP-01 RQL, RVAAP-04 ODA #2, RVAAP-05 WBG, RVAAP-08 through RVAAP-12 Load Lines 1-4 and 12, and RVAAP-51 DAPWR, Mar. 1, 2022
Final Remedial Investigation Report Facility-wide Groundwater Monitoring Program Groundwater Investigation and Reporting Services, Feb. 11, 2022
Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2021 Sampling Event, Jan. 12, 2022
|
Nov. 30, 2021 |
Final Remedial Action Completion Report for Load Lines 1, 2, 3, 4, and 12 (RVAAP-08 to 12), Oct. 29, 2021
Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Annual Report for 2020, July 21, 2021
|
Oct. 28, 2021 |
Final Record of Decision for RVAAP-03 Open Demolition Area #1, Apr. 19, 2021
Final Record of Decision CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Mar. 25, 2021
|
Sept. 29, 2021 |
FY2021 Ravenna Army Ammunition Plant Army Cleanup Program Installation Action Plan, Sept. 1, 2021 |
Aug. 31, 2021 |
Final Revised Property Management Plan for the Designated Areas of Concern and Munitions Response Sites, Version 4.0, June 1, 2021
Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2021, May 21, 2021
Final Record of Decision for RVAAP-03 Open Demolition Area #1, Apr. 19, 2021
Final Remedial Action Completion Report Non Time-Critical Removal Action for CC RVAAP-78 Quarry Pond Surface Dump, Apr. 13, 2021
Final Record of Decision CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Mar. 25, 2021
|
Aug. 2, 2021 |
Memorandum for Record, Summary of Findings, Magnetometer-Assisted Survey of Sand Creek conducted on 7-13 June 2020 as related to the Time Critical Removal Action for Open Demolition Area #2, June 30, 2021
Final Remedial Action Completion Report for Non Time Critical Removal Action for RVAAP-67 Facility-Wide Sewers and CC RVAAP-75 George Road Sewage Treatment Plant, April 30, 2021
|
June 29, 2021 |
Final Revised Property Management Plan for the Designated Areas of Concern and Munitions Response Sites, Version 4.0, June 1, 2021
|
May 28, 2021 |
Final 2020 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 through RVAAP-11 Load Lines 1 through 4, RVAAP-12 Load Line 12, and RVAAP-51 Dump Along Paris-Windham Road, May 26, 2021
Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2021, May 21, 2021
Final After Action Report Surface Clearance for MEC RVAAP-060R-01 Block D Igloo Munitions Response Site, May 19, 2021
Final Remedial Action Completion Report for Non Time Critical Removal Action for RVAAP-67 Facility-Wide Sewers and CC RVAAP-75 George Road Sewage Treatment Plant, Apr. 30, 2021
Final Remedial Action Completion Report Non Time-Critical Removal Action for CC RVAAP-78 Quarry Pond Surface Dump, Apr. 13, 2021
Final Non Time-Critical Removal Action Work Plan for RVAAP-34 Sand Creek Disposal Road Landfill, Apr. 9, 2021
Final Work Plan Addendum Additional Sampling for CC RVAAP-79 DLA Ore Storage Sites Remedial Investigation, Ore Storage Pond Sub-Area, Mar. 22, 2021
Final Remedial Design for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Mar. 19, 2021
Final Remedial Design for Soil, Sediment and Surface Water at RVAAP-42 Load Line 9, Mar. 17, 2021
|
Apr. 30, 2021 |
Final Record of Decision for RVAAP-03 Open Demolition Area #1, Apr. 19, 2021
Final Non Time-Critical Removal Action Work Plan for RVAAP-34 Sand Creek Disposal Road Landfill, Apr. 9, 2021
Final Remedial Design for Soil, Sediment, and Surface Water at CC RVAAP-76 Depot Area, Mar, 19, 2021
Final Remedial Design for Soil, Sediment, and Surface Water at RVAAP-38 NACA Test Area, Mar. 19, 2021
Final Remedial Design for Soil, Sediment and Surface Water at RVAAP-42 Load Line 9, Mar. 17, 2021
Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2019 Sampling Event, Jan. 24, 2020
|
Mar. 30, 2021 |
Final Record of Decision CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Mar. 25, 2021
Final Work Plan Addendum Additional Sampling for CC RVAAP-79 DLA Ore Storage Sites Remedial Investigation, Ore Storage Pond Sub-Area, Mar. 22, 2021
Final Remedial Design for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Mar. 19, 2021
Final Remedial Design for Soil, Sediment, and Surface Water at RVAAP-38 NACA Test Area, Mar. 19, 2021
Final Remedial Design for Soil, Sediment, and Surface Water at CC RVAAP-76 Depot Are, Mar. 19, 2021
Final Remedial Design for Soil, Sediment and Surface Water at RVAAP-42 Load Line 9, Mar. 17, 2021
Final Facility-wide Groundwater Monitoring Report Program Plan RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2020 Sampling Event, Mar. 10, 2021
Final 2021 Community Relations Plan, Mar. 9, 2021
Final 2019 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 through RVAAP-11 Load Lines 1 through 4, RVAAP-12 Load Line 12, and RVAAP-51 Dump Along Paris - Windham Road, May 20, 2020
|
Feb. 26, 2021 |
Final Engineering Evaluation/Cost Analysis for CC RVAAP-70 East Classification Yard, Jan. 28, 2021
Final Remedial Investigation for CC RVAAP-79 DLA Ore Storage Sites, Volumes One and Two, Oct. 16, 2020
|
Jan. 28, 2021 |
Final Record of Decision for RVAAP-063-R-01 Group 8 Munitions Response Site, Version 1.0, Dec. 31, 2020
FY2020 Ravenna Army Ammunition Plant Army Cleanup Program Installation Action Plan, Sept. 30, 2020
|
Dec. 29, 2020 |
Final Proposed Plan for RVAAP-03 Open Demolition Area #1, Revision 2.0, Dec. 7, 2020
Submission Format Guidelines for the Ravenna Army Ammunition Plant Restoration Program, Version 22, Nov. 17, 2020
|
Nov. 24, 2020 |
Final Proposed Plan for RVAAP-03 Open Demolition Area #1, Revision 1.0, Oct. 29, 2020 |
Oct. 30, 2020 |
Final Remedial Investigation for CC RVAAP-79 DLA Ore Storage Sites, Volumes One and Two, Oct. 16, 2020
Final Record of Decision for RVAAP-063-R-01 Group 8 Munitions Response Site, Version 1.0,Sept. 25, 2020
Final Remedial Design Work Plan for RVAAP Load Lines 1, 2, 3, 4, and 12 (RVAAP-08 to 12), Sept. 21, 2020
Final RVAAP-66 Facility-wide Groundwater Monitoring Program Production Well Abandonment Report Groundwater Investigation and Reporting Services , Aug. 6, 2020
|
Sept. 10, 2020 |
Final Proposed Plan for CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Revision 1.0, Aug. 21, 2020 |
Aug. 31, 2020 |
Final Facility-wide Groundwater Monitoring Program Production Well Abandonment Report Groundwater Investigation and Reporting Services RVAAP-66 Facility-wide Groundwater, Aug. 6, 2020
Final Facility-wide Groundwater Monitoring Program, RVAAP-66 Facility-wide Groundwater Annual Report for 2019, Groundwater Investigation and Reporting Services, June 12, 2020
Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Addendum for 2020, June 12, 2020
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-19 Landfill North of Winklepeck Burning Grounds, Feb. 18, 2020
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-46 Buildings F-15 and F-16, Feb. 12, 2020
Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2019 Sampling Event, Jan. 24, 2020
|
June 29, 2020 |
Final Munitions and Explosives of Concern Verification Study After Action Report for the RVAAP-03 Open Demolition Area #1, June 24, 2020
Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Addendum for 2020, June 12, 2020
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, June 4, 2020
Final Record of Decision for Sediment and Surface Water at Six Areas of Concern/Munitions Response Sites, June 4, 2020
Final 2019 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 through RVAAP-11 Load Lines 1 through 4, RVAAP-12 Load Line 12, and RVAAP-51 Dump Along Paris-Windham Road, May 20, 2020
Final Revised Property Management Plan for the Designated Areas of Concern and Munitions Response Sites, Version 3.0, Apr. 30, 2020
Final Work Plan Non-Time Critical Removal Action for CC RVAAP-78 Quarry Pond Surface Dump, Apr. 28, 2020
|
Apr. 29, 2020 |
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Mar. 25, 2020 |
Mar 31, 2020 |
Final Proposed Plan for CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Mar. 11, 2020
Final Community Relations Plan 2020, Feb. 27, 2020
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-19 Landfill North of Winklepeck Burning Grounds, Feb. 18, 2020
Final Feasibility Study for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, Sept. 23, 2019
|
Feb. 28, 2020 |
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-46 Buildings F-15 and F-16, Feb. 12, 2020
Final Proposed Plan for RVAAP-063-R-01 Group 8 Munitions Response Site, Version 2.0, Jan. 30, 2020
Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2019 Sampling Event, Jan. 24, 2020
|
Jan 30, 2020 |
Final Record of Decision Amendment for Soil, Sediment, and Surface Water at RVAAP Load Lines 1, 2, 3, 4, and 12, Dec. 23, 2019
|
Dec. 23, 2019 |
Final Ravenna Army Ammunition Plant Army Cleanup Program FY2018 Installation Action Plan, Dec. 10, 2019
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-38 NACA Test Area, Dec. 5, 2019
Final Proposed Plan for RVAAP-063-R-01 Group 8 Munitions Response Site, Version 1.0, Dec.4, 2019
|
Nov. 27, 2019 |
Final Time Critical Removal Action Report RVAAP-004-R-01 Open Demolition Area #2, Nov. 25, 2019
Final No Further Action Record of Decision for RVAAP-001-R-01 Ramsdell Quarry Area 2 (South) Munitions Response Site, Version 1.0, Aug. 19, 2019
Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Annual Report for 2018, Aug. 15, 2019
Final Record of Decision for RVAAP-060-R-01 Block D Igloo Munitions Response Site, Version 1.0, Aug. 5, 2019
Final No Further Action Record of Decision for RVAAP-002-R-01 Erie Burning Grounds Munitions Response Site, Version 1.0, July 16, 2019
Revised Final Remedial Investigation for RVAAP-34 Sand Creek Disposal Road Landfill, Feb. 13, 2017
Final No Further Action Record of Decision for RVAAP-034-R-01 Sand Creek Dump Munitions Response Site, Version 1.0, Sept. 29, 2015
Final No Further Action Record of Decision for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Version 1.0, Sept. 29, 2015
Final No Further Action Record of Decision for RVAAP-033-R-01 Firestone Test Facility Munitions Response Site, Aug. 14, 2015
|
Oct. 31, 2019 |
Final Remedial Investigation CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Volumes 1 and 2, Oct. 3, 2019
First and Second Update and Progress Report for the Remedial Investigation at CC RVAAP-69 Building 1048 Fire Station, June 10, 2019
Final No Further Action Record of Decision for RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Site, Version 1.0, June 3, 2019
Final No Further Action Record of Decision for RVAAP-032-R-01 40mm Firing Range Munitions Response Site, Version 1.0, May 10, 2019
Final Proposed Plan for RVAAP-060-R-01 Block D Igloo Munitions Response Site, Version 1.0, Dec. 19, 2018
Final Site Inspection Report for RVAAP-28 Suspected Mustard Agent Burial Site, Version 1.0, Apr. 27, 2015
|
Sept. 26, 2019 |
Final Engineering Evaluation/Cost Analysis: CC RVAAP-78 Quarry Pond Surface Dump at Former Ravenna Army Ammunition Plant, Sept. 19, 2019
Final Work Plan Addendum MEC Verification Study at RVAAP-03 Open Demolition Area #1, Sept. 3, 2019
Final No Further Action Proposed Plan for RVAAP-001-R-01 Ramsdell Quarry Landfill Munitions Response Site Area 2 (South), Version 1.0, Jan. 4, 2019
Final No Further Action Proposed Plan for RVAAP-002-R-01 Erie Burning Grounds Munitions Response Site, Version 1.0, Dec. 19, 2018
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Calendar Year 2008, Jan. 1, 2008
|
Aug. 29, 2019 |
Final No Further Action Record of Decision for RVAAP-001-R-01 Ramsdell Quarry Area 2 (South) Munitions Response Site, Version 1.0, Aug. 19, 2019
Final Background Study for Metals for RVAAP-66 Facility-Wide Groundwater, Aug. 6, 2019
Final Record of Decision for RVAAP-060-R-01 Block D Igloo Munitions Response Site, Version 1.0, Aug. 5, 2019
Final Feasibility Study for RVAAP-063-R-01 Group 8 MRS, Version 1.0, July 19, 2019
Final No Further Action Record of Decision for RVAAP-002-R-01 Erie Burning Grounds Munitions Response Site, Version 1.0, July 16, 2019
Final Proposed Plan for Sediment and Surface Water at Six Areas of Concern and Munitions Response Sites, May 10, 2019
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Calendar Year 2012, Jan. 1, 2012
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Calendar Year 2011, Jan. 1, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Calendar Year 2010, Jan. 1, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Calendar Year 2009, Jan. 1, 2009
Final Sampling and Analysis Plan Addendum No. 3 for the Biological Measurements at RVAAP-05 Winklepeck Burning Grounds, May 6, 2002
Final Groundwater Assessment Plan for RVAAP-01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant, Sept. 7, 2001
Final Report of Closure Activities Building W-221 and X-232 at Ravenna Army Ammunition Plant, June 30, 2000
|
July 31, 2019 |
Final Record of Decision for Wet Sediment and Surface Water at RVAAP-12 Load Line 12, Feb. 22, 2019
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Feb. 22, 2019
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-29 Upper and Lower Cobbs Ponds, Feb. 22, 2019
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-42 Load Line 9, Feb. 22, 2019
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-40 Load Line 7, Feb. 22, 2019
Final Action Memorandum for RVAAP-67 Facility-wide Sewers: Load Line 2 Functional Area and CC RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, Sept. 21, 2017
|
June 27, 2019 |
Final No Further Action Record of Decision for RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Site, Version 1.0, June 3, 2019
Final 2018 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 - 11 Load Lines 1-4, and RVAAP-12 Load Line 12, May 24, 2019
Final Proposed Plan for Sediment and Surface Water at Six Areas of Concern and Munitions Response Sites, May 10, 2019
Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2019, May 3, 2019
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-19 Landfill North of Winklepeck Burning Grounds, Apr. 4, 2019
Final Solid Waste Management Plan, Evaluation, Identification, and Management of Potential Solid Waste Sites, Mar. 26, 2019
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP Load Lines 1,2,3,4, and 12, Oct. 26, 2018
Final Remedial Action Work Plan for RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, July 25, 2008
Final Explosives Safety Submission OE/UXO Locating, Removal and Disposal at RVAAP-03 Open Demolition Area #1 at Ravenna Army Ammunition Plant, Sept 1, 2000
|
May 29, 2019 |
Final No Further Action Record of Decision for RVAAP-032-R-01 40mm Firing Range Munitions Response Site, Version 1.0, May 10, 2019
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-46 Buildings F-15 and F-16, Apr. 1, 2019
Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Feb. 26, 2019
Final Record of Decision CC RVAAP-76 Depot Area, Jan. 8, 2019
Final Record of Decision CC RVAAP-73 Facility-Wide Coal Storage, Nov. 26, 2018
|
Apr. 30, 2019 |
Final Work Plan Non Time-Critical Removal Action for RVAAP-67 Facility-Wide Sewers and CC RVAAP-75 George Road Sewage Treatment Plant, Ravenna Army Ammunition Plant Restoration Program, Apr. 11, 2019
Final Solid Waste Management Plan, Evaluation, Identification, and Management of Potential Solid Waste Sites, Mar. 26, 2019
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-38 NACA Test Area, Mar. 22, 2019
Final 2017 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 -11 Load Lines 1-4 and RVAAP-12 Load Line 12, Feb. 28, 2019
|
Apr. 9, 2019 |
Final 2019 Community Relations Plan, Ravenna Army Ammunition Plant Restoration Program, Portage and Trumbull Counties, Ohio. Mar. 15, 2019
Final 2017 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 -11 Load Lines 1-4 and RVAAP-12 Load Line 12, Feb. 28, 2019
Final Remedial Design for Soil at RVAAP-51 Dump Along Paris-Windham Road, Feb. 27, 2019
Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Feb. 26, 2019
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Feb. 22, 2019
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-42 Load Line 9, Feb. 22, 2019
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-40 Load Line 7, Feb. 22, 2019
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-29 Upper and Lower Cobbs Ponds, Feb. 22, 2019
Final Record of Decision for Wet Sediment and Surface Water at RVAAP-12 Load Line 12, Feb. 22, 2019
Final No Further Action Record of Decision for RVAAP-001-R-02 Ramsdell Quarry Landfill Munitions Response Site Area 1 (North), Version 2.0, Jan. 14, 2019
Final No Further Action Record of Decision for RVAAP-019-R-01 Landfill North of Winklepeck Munitions Response Site, Version 2.0, Jan. 14, 2019
Final Site Inspection Report: CC RVAAP-80 Group 2 Propellant Can Tops, May 10, 2017
Final No Further Action Record of Decision for RVAAP-008-R-01 Load Line #1A Munitions Response Site, Aug. 14, 2015
|
Feb. 28, 2019 |
Final Engineering Evaluation/Cost Analysis: RVAAP-34 Sand Creek Disposal Road Landfill at Camp James A. Garfield Joint Military Training Center, Jan. 14, 2019
Final No Further Action Proposed Plan for RVAAP-001-R-01 Ramsdell Quarry Landfill Munitions Response Site Area 2 (South), Version 1, Jan. 4, 2019
Final Facility-Wide Groundwater Monitoring Addendum for 2018, June 21, 2018
|
Jan.30, 2019 |
Final Engineering Evaluation/Cost Analysis: RVAAP-34 Sand Creek Disposal Road Landfill at Camp James A. Garfield Joint Military Training Center, Jan. 14, 2019
Technical Memorandum for the Abandonment of Groundwater Monitoring Well FWGmw-017 for RVAAP-66 Facility-wide Groundwater Monitoring Program, Dec. 20, 2018
Final No Further Action Proposed Plan for RVAAP-002-R-01 Erie Burning Grounds Munitions Response Site, Version 1.0, Dec. 19, 2018
Final Proposed Plan for RVAAP-060-R-01 Block D Igloo Munitions Response Site, Version 1.0, Dec. 19, 2018
Final Phase II Remedial Investigation Report and Feasibility Study for Soil, Sediment, and Surface Water at RVAAP-38 NACA Test Area, July 16, 2018
|
Dec. 21, 2018 |
Revised Technical Memorandum for the First 2018 Semi-Annual RVAAP-66 Facility-Wide Groundwater June 2018 Sampling Event, Dec. 10, 2018
Final Site Inspection Report for CC RVAAP-70 East Classification Yard, Oct. 31, 2018
|
Nov. 29, 2018 |
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP Load Lines 1,2,3,4, and 12, Oct 26, 2018
|
Oct. 30, 2018 |
Final Site Inspection Addendum for CC RVAAP-78 Quarry Pond Surface Dump, Sept. 28, 2018
Final No Further Action Proposed Plan for RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Site, Sept. 18, 2018
Final No Further Action Proposed Plan for RVAAP-032-R-01 40mm Firing Range Munitions Response Site, Sept. 17, 2018
Final No Further Action Record of Decision for RVAAP-050-R-01 Atlas Scrap Yard Munitions Response Site, Sept. 5, 2018
|
Sept 27, 2018 |
Final No Further Action Proposed Plan for RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Site, Sept. 18, 2018
Final No Further Action Proposed Plan for RVAAP-032-R-01 40mm Firing Range Munitions Response Site, Sept. 17, 2018
Final No Further Action Record of Decision for RVAAP-061-R-01 Block D Igloo - TD Munitions Response Site, Version 1.0, Sept. 14, 2018
Final No Further Action Record of Decision for RVAAP-001-R-02 Ramsdell Quarry Landfill Munitions Response Site Area 1 (North), Version 1.0, Sept. 13, 2018
Final No Further Action Record of Decision for RVAAP-050-R-01 Atlas Scrap Yard Munitions Response Site, Sept. 5, 2018
Final No Further Action Record of Decision for RVAAP-019-R-01 Landfill North of Winklepeck Munitions Response Site, Version 1.0, Sept. 4, 2018
Final Feasibility Study for RVAAP-002-R-01 Erie Burning Grounds MRS, Version 1.0, Aug. 17, 2018
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2017, July 27, 2018
Final FY 2017 Fourth Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, May 21, 2018
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-51 Dump Along Paris-Windham Road, Sept. 15, 2017
|
August 30, 2018 |
Final Feasibility Study for RVAAP-002-R-01 Erie Burning Grounds MRS, Version 1.0, Aug 17, 2018
Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-46 Buildings F-15 and F-16, Apr 5, 2018
Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-19 Landfill North of Winklepeck Burning Grounds, Apr 25, 2018
Final Feasibility Study for RVAAP-060-R-01 Block D Igloo MRS, Version 1.0, Apr 23, 2018
|
July 30, 2018 |
Final Revised Property Management Plan for the Designated Areas of Concern and Munitions Response Sites, Version 2.0, Mar. 30, 2018
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-44 Load Line 11 (signed), Feb, 15, 2018
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-41 Load Line 8 (signed), Jan. 25, 2018
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-33 Load Line 6 (signed), Jan. 25, 2018
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-39 Load Line 5 (signed), Dec. 22, 2017
Final Construction Completion Report FY16 Recycling of Materials at RVAAP-50 Atlas Scrap Yard Area of Concern and Setup of Temporary Storage Facility, Aug. 17, 2017
Final Construction Work Plan for FY16 Recycling of Materials at RVAAP-50 Atlas Scrap Yard Area of Concern and Setup of Temporary Storage Facility, Dec. 20, 2016
|
June 28, 2018 |
Final No Further Action Record of Decision for RVAAP-050-R-01 Atlas Scrap Yard Munitions Response Site, Jun 1, 2018
Final FY 2017 Fourth Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, May 21, 2018
Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-19 Landfill North of Winklepeck Burning Grounds, Apr 25, 2018
Final Feasibility Study for RVAAP-060-R-01 Block D Igloo MRS, Version 1.0, Apr. 23, 2018
Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-46 Buildings F-15 and F-16, Apr 5, 2018
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Semi-Annual Report for April and July 2017 Sampling Events, Mar 23, 2018
Final Remedial Action Completion Report for the Soil Removal Remedy at RVAAP-05 Winklepeck Burning Grounds, Feb 16, 2018
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-44 Load Line 11, Feb. 15, 2018
Final Proposed Plan CC RVAAP-73 Facility-Wide Coal Storage, Feb. 1, 2018
Final Proposed Plan CC RVAAP-76 Depot Area, Feb. 1, 2018
Final Feasibility Study for RVAAP-001-R-01 Ramsdell Quarry Landfill MRS Area 2 (South), Version 1.0, Jan. 17, 2018
Final Feasibility Study for RVAAP-016-R-01 Fuze and Booster Quarry MRS, Version 1.0, Jan.6, 2018
Final Feasibility Study for RVAAP-032-R-01 40mm Firing Range MRS, Version 1.0, Jan. 5, 2018
Final Work Plan Additional Sampling for CC RVAAP-69 Building 1048 Fire Station, CC RVAAP-70 East Classification Yard, and CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Nov 30, 2017
Final Supplemental Remedial Investigation for Sediment and Surface Water at RVAAP-01, RVAAP-04, RVAAP-16, RVAAP-001-R-01, Nov 29, 2017
Final Project Management Plan for the Completion of RI, FS, PP, and ROD Documents, Multiple Areas of Concern, Former Ravenna Army Ammunition Plant Restoration Program, Revision 1, Nov. 10, 2017
Final Sampling and Analysis Plan Addendum for Supplemental Sampling at RVAAP-38 NACA Test Area, Oct. 20, 2017
Final Completion Report for the Sand Creek Culvert Replacement and Rocket Ridge Slope Stabilization at RVAAP-004-R-01 Open Demolition Area #2, Oct 20, 2017
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-51 Dump Along Paris-Windham Road, Sep 15, 2017
Final Visual Assessment Survey Report Evaluation, Identification, and Management of Potential Solid Waste Sites, Aug. 29, 2017
Final Phase III Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-29 Upper and Lower Cobbs Ponds, Aug 10, 2017
Final No Further Action Proposed Plan for RVAAP-019-R-01 Landfill North of Winklepeck Munitions Response Site, Aug 2, 2017
Final No Further Action Proposed Plan for RVAAP-061-R-01 Block D Igloo - TD Munitions Response Site, Jul 31, 2017
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2016, May 22, 2017
|
June 05, 2018 |
Revised Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-40 Load Line 7, Mar. 16, 2018
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Feb. 21, 2018
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-29 Upper and Lower Cobbs Ponds, Jan. 12, 2018
Final Proposed Plan for Wet Sediment and Surface Water at RVAAP-12 Load Line 12, Nov. 9, 2017
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-42 Load Line 9, Mar. 31, 2017
|
Aug. 23, 2017 |
Revised Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard Version 2.0, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Aug. 4, 2017
Final No Further Action Proposed Plan for RVAAP-050-R-01 Atlas Scrap Yard Munitions Response Site, Aug. 3, 2017
Final No Further Action Proposed Plan for RVAAP-019-R-01 Landfill North of Winklepeck Munitions Response Site, Aug. 2, 2017
Final No Further Action Proposed Plan for RVAAP-001-R-02 Ramsdell Quarry Landfill Area 1(North) Munitions Response Site, Aug. 1, 2017
Final No Further Action Proposed Plan for RVAAP-061-R-01 Block D Igloo - TD Munitions Response Site, July 31, 2017
Final FY 2017 Third Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, June 27, 2017
Final Feasibility Study Addendum for Soil, Sediment, and Surface Water at RVAAP Load Lines 1, 2, 3, 4, and 12. Volumes 1 & 2, June 21, 2017
|
July 28, 2017 |
Final Second Five-Year Review Report for Load Lines 1 - 4, Load Line 12, Winklepeck Burning Grounds, and Ramsdell Quarry Landfill, June 30, 2017
Final FY 2017 Third Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, June 27, 2017
Final Remedial Investigation CC RVAAP-73 Facility-Wide Coal Storage, Feb. 17, 2017
|
June 29, 2017 |
Final Record of Decision for Soil, Sediment, and Surface Water at CC RVAAP-68 Electric Substations (East, West, No. 3), Apr. 6, 2017
Historical Solid Waste Management Plan for RVAAP-01 Ramsdell Quarry Landfill and RVAAP-05 Winklepeck Burning Grounds, January 1979, Jan 1, 1979
Historical Landfill Operation for RVAAP-01 Ramsdell Quarry Landfill, August 4, 1978
|
May 30, 2017 |
Final Site Inspection Report: CC RVAAP-80 Group 2 Propellant Can Tops, May 10, 2017
Final Facility-Wide Groundwater Monitoring Addendum for 2017, Apr. 27, 2017
Final FY 2017 Second Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Apr. 12, 2017
Final Record of Decision for Soil, Sediment, and Surface Water at CC RVAAP-68 Electric Substations (East, West, No. 3), Apr. 6, 2017
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-43 Load Line 10, Mar. 10, 2017
RVAAP- 34 Sand Creek Disposal Road Landfill Clean-Up Project Weekly Reports, August - October 2003, Oct. 10, 2003
|
Apr. 28, 2017 |
Final FY 2017 Second Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Apr. 12, 2017
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-42 Load Line 9, Mar. 31, 2017
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-40 Load Line 7, Mar. 22, 2017
Revised Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-33 Load Line 6, Mar. 17, 2017
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-43 Load Line 10, Mar. 10, 2017
Final Phase III Remedial Investigation Report for Wet Sediment and Surface Water at RVAAP-12 Load Line 12, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Feb. 16, 2017
Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Are, Feb. 10, 2017
Ravenna Army Ammunition Plant 23-26 November and 7-11 March 2011, 26-27 April 2011 Field Evaluation of Selected Decommissioned Munitions Storage Igloos, June 1, 2011
Historical Archives - NACA Research Memorandum, Facilities and Methods Used in Full-Scale Airplane Crash-Fire Investigation, Mar. 10, 1952
|
Mar. 29, 2017 |
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-33 Load Line 6, Mar. 17, 2017
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-44 Load Line 11, Mar. 17, 2017
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-41 Load Line 8, Mar. 17, 2017
Final Community Relations Plan 2017, Mar. 16, 2017
Final Engineering Evaluation/Cost Analysis for RVAAP-67 Facility-wide Sewers: Load Line 2 Functional Area and CC RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, Mar. 10, 2017
Final FY 2017 First Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Mar. 6, 2017
Final 2016 Annual Land Use Control Monitoring Report RVAAP-01 Ramsdell Quarry Landfill and RVAAP-05 Winklepeck Burning Grounds, Feb. 15, 2017
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Semi-Annual Report for May 2016 Sampling Event, Jan. 3, 2017
Revised Final Remedial Investigation Work Plan for Groundwater and Environmental Investigation Services for RVAAP-66 Facility-wide Groundwater, Volumes 1, 2, and 3, Dec. 21, 2016
|
Feb. 28, 2017 |
Final Phase III Remedial Investigation Report for Wet Sediment and Surface Water at RVAAP-12 Load Line 12, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Feb. 16, 2017
Final 2016 Annual Land Use Control Monitoring Report RVAAP-01 Ramsdell Quarry Landfill and RVAAP-05 Winklepeck Burning Grounds, Feb. 15, 2017
Revised Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Feb, 13, 2017
Revised Final Remedial Investigation Report for RVAAP-34 Sand Creek Disposal Road Landfill, Feb, 13, 2017
Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Feb. 10, 2017
|
Feb. 13, 2017 |
Final Remedial Investigation Study for Soil, Surface Water, and Sediment at RVAAP-03 Open Demolition Area #1, Jan. 12, 2017 |
Jan. 30, 2017 |
FY2016 Ravenna Army Ammunition Plant, Army Defense Environmental Restoration Program Installation Action Plan, Public, Jan 17, 2017
Final Remedial Investigation/Feasibility Study CC-RVAAP-76 Depot Area, Nov. 22, 2016
Final Interim Removal Action Historical Well Abandonment Completion Report, March 11, 2016
|
Dec. 23, 2016 |
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-39 Load Line 5, Dec. 6, 2016
Final Remedial Investigation Report for RVAAP-34 Sand Creek Disposal Road Landfill, Nov. 29, 2016
Final Remedial Investigation/Feasibility Study CC-RVAAP-76 Depot Area, Nov. 22, 2016
Final Remedial Investigation Work Plan for Sediment and Surface Water at RVAAP-01, RVAAP-04, RVAAP-16, RVAAP-001-R-01, and Inventory of Sediment and Surface Water at Multiple Sites, Aug. 12, 2016
Final Site Inspection CC-RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, Jan 29, 2016
|
Nov. 29, 2016 |
Final FY 2016 Fourth Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Sept. 29, 2016
Final Engineering Evaluation/Cost Analysis RVAAP-28 Suspected Mustard Agent Burial Site at Camp Ravenna Joint Military Training Center, Sept. 19, 2016
Final Phase II Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-44 Load Line 11, Aug. 12, 2016
Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-40 Load Line 7, July 27, 2016
Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP- 41 Load Line 8, July 20, 2016
Final Phase II Remedial Investigation Report and Feasibility Study for Soil, Sediment, and Surface Water at RVAAP-42 Load Line 9, June 16, 2016
Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-39 Load Line 5, June 16, 2016
Final Phase II Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-33 Load Line 6, June 9, 2016
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2015, May 6, 2016
|
Nov. 10, 2016 |
Final Proposed Plan for Soil, Sediment, and Surface Water at CC RVAAP-68 Electric Substations (East, West, No. 3), Sept. 30, 2016
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-51 Dump Along Paris-Windham Road, Sept. 29, 2016
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-43 Load Line 10, Aug. 18, 2016
|
Oct. 28, 2016 |
Final Proposed Plan for Soil, Sediment, and Surface Water at CC RVAAP-68 Electric Substations (East, West, No. 3), Sept. 30, 2016
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-51 Dump Along Paris-Windham Road, Sept. 29. 2016
Final Basis of Design and Work Plan Sand Creek Culvert Replacement at the Open Demolition Area #2 Crossing RVAAP-004-R-01 Open Demolition Area #2 MRS Military Munitions Response, Sept. 16, 2016
|
Sept 28, 2016 |
Final FY 2016 Third Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Aug. 26, 2016
Final Site Inspection Compliance Restoration Site CC RVAAP-78 Quarry Pond Surface Dump, Aug 5, 2016
Final Site Inspection CC-RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, Jan. 29, 2016
|
Aug 26, 2016 |
Final Site Safety and Health Plan Evaluation, Identification, and Management of Solid Waste Disposal Site, Aug. 17, 2016
Final Site Inspection (Phase I Remedial Investigation) Compliance Restoration Site CC RVAAP-78 Quarry Pond Surface Dump, Aug. 5. 2016
Final Remedial Design Supplement Soil Removal Action At RVAAP-05 Winklepeck Burning Grounds, June 30, 2016
Final FY 2016 Second Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Apr. 19, 2016
Final FY 2016 First Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Apr. 4, 2016
Final Work Plan for a Pilot Study and Feasibility Study at RVAAP-50 Atlas Scrap Yard, Feb. 19, 2016
Final Remedial Investigation CC RVAAP-68 Electric Substations (East, West, No. 3), July 31, 2015
Final Property Management Plan for the Designated Areas of Concerns and Munitions Response Sites, Volume One - Version 1.0, Aug. 1, 2012
|
July 28, 2016 |
Final Community Relations Plan 2016 for the Ravenna Army Ammunition Plant Restoration Program, June 29, 2016
Final Work Plan Evaluation, Identification, and Management of Potential Solid Waste Disposal Sites, May 6, 2016
Revised Final Accident Prevention Plan (Addendum) for Site Inspection at Compliance Restoration Site CC RVAAP-80 Group 2 Propellant Can Tops, Jan. 7, 2016
|
June 21, 2016 |
Final Well Abandonment Work Plan for RVAAP-66 Facility-wide Groundwater, May 3, 2016
Final PBA13 Sample and Analysis Plan Addendum for Surface Water and Sediment at Load Lines 1, 2, 3, and 4, Apr. 8, 2016
Final Slope Stabilization Plan for the Rocket Ridge Area in RVAAP-004-R-01 Open Demolition Area #2 MRS, Apr. 7, 2016
Final Remedial Design for the Post-ROD Changes to the Remedy at RVAAP-05 Winklepeck Burning Grounds, Former Ravenna Army Ammunition Plant/Camp Ravenna, Portage and Trumbull Counties, Ohio, Aug. 27, 2015
Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-43 Load Line 10, June 26, 2015
|
May 27, 2016 |
Final Work Plan Time-Critical Removal Action RVAAP-004-R-01 Open Demolition Area #2, Mar. 18, 2016
Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, Former Ravenna Army Ammunition Plant, Ravenna, Ohio, June 26, 2015
|
Apr. 27, 2016 |
Final Site Inspection CC-RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, Jan. 29, 2016
Revised Final Project Work Plan for Site Inspection at Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops, Revision 0, Jan 7, 2016
|
Mar. 30, 2016 |
FY2015 Ravenna Army Ammunition Plant, Army Defense Environmental Restoration Program Installation Action Plan, Public, Mar 22, 2016
Final 2015 Annual Land Use Control Monitoring Report RVAAP-01 Ramsdell Quarry Landfill and RVAAP-05 Winklepeck Burning Grounds, Jan 27, 2016
Final Sampling and Analysis Plan Addendum for the Remedial Investigation of Load Line 6, Sept 19, 2003
Final Sampling and Analysis Plan Addendum for the Remedial Investigation of RVAAP-42 Load Line 9 at Ravenna Army Ammunition Plant, Sept 19, 2003
|
Feb. 25, 2016 |
Final 2015 Annual Land Use Control Monitoring Report RVAAP-01 Ramsdell Quarry Landfill and RVAAP-05 Winklepeck Burning Grounds, Jan 27, 2016
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the July 2015 Sampling Event, Jan 13, 2016
Final No Further Action Record of Decision for RVAAP-034-R-01 Sand Creek Dump Munitions Response Site, Version 1.0, Sept 29, 2015
Final No Further Action Record of Decision for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Version 1.0, Sept 29, 2015
Final No Further Action Record of Decision for RVAAP-033-R-01 Firestone Test Facility Munitions Response Site, Aug 14, 2015
Final No Further Action Record of Decision for RVAAP-008-R-01 Load Line #1A Munitions Response Site, Aug 14, 2015
|
Jan. 27, 2016 |
Final FY 2015 Fourth Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Dec.18, 2015
Final Site Characterization and Focused Feasibility Study for the RVAAP- 51 Dump Along Paris-Windham Road, Revision 1, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Dec. 15, 2015
Revised Final Work Plan Munitions Response for Demolition of Load Lines 5, 7, and Building 1039, Transite Removal at Building T-1604, Removal of Most Remaining Concrete and Miscellaneous Debris at Load Lines 6, 9, and 11, Nov. 21, 2006
|
Dec. 17, 2015 |
Submission Format Guidelines for the Ravenna Army Ammunition Plant, Version 21, Dec. 11, 2015
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the March 2015 Sampling Event, Volumes 1 and 2, Sept. 21, 2015
|
Nov. 23, 2015 |
Final FY 2015 Third Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Oct. 30, 2015
Final Action Memorandum Time-Critical Removal Action RVAAP-004-R-01 Open Demolition Area #2, Oct 30, 2015
|
Oct. 28, 2015 |
Final FY2013/2015 Annual Sand Creek Stream Monitoring within RVAAP-004-R-01 Open Demolition Area #2 MRS for the Rocket Ridge Project Letter Reports, Oct. 7, 2015
Final Remedial Investigation Report for RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Site, Version 1.0, June 5, 2015
Final Work Plan for Process Equipment Disassembly, Decontamination and Disposal at RVAAP- 09 Load Line 2 and RVAAP- 10 Load Line 3 at Ravenna Army Ammunition Plant, Aug. 1, 2002
|
Sept. 28, 2015 |
Final Remedial Investigation Report for RVAAP-001-R-01 Ramsdell Quarry Landfill Munitions Response Site, Version 1.0, Jan. 27, 2015
Final Military Munitions Response Program Historical Records Review at Ravenna Army Ammunition Plant (revised), Jan. 22, 2007
|
Aug. 28, 2015 |
Final FY 2015 Second Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds , July 23, 2015
Final Interim Removal Action Work Plan for Historical Well Abandonment Activities, July 21, 2015
Final Site Inspection CC RVAAP-72 Facility-Wide Underground Storage Tanks, July 8, 2015
Final Site Inspection Report CC RVAAP-83 Former Buildings 1031 and 1039, Revision 0, June 15, 2015
Final No Further Action Proposed Plan for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Version 1.0, May 28, 2015
Final No Further Action Proposed Plan for RVAAP-034-R-01 Sand Creek Dump Munitions Response Site, Version 1.0, May 28, 2015
Final Remedial Investigation Report for RVAAP-063-R-01 Group 8 MRS, Version 1.0, May 19, 2015
Final Construction Field Plans for the Remediation of Soils at RVAAP- 08 Load Line 1, RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Nov 15, 2006
Final Project Plans of the Structural Analyses and MEC Support for RVAAP- 08, 09, 10 and 11 Load Lines 1-4 at Ravenna Army Ammunition Plant, Nov 3, 2006
Final Phase III Remedial Investigation Report for the RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Mar. 2, 2005
Final Supplemental Baseline Human Health Risk Assessment for RVAAP- 08 Load Line 1 Alternative Receptors at Ravenna Army Ammunition Plant, July 1, 2004
Final Project Management Plan for the Remediation of Soils at RVAAP- 08, 09,10 and 11 Load Lines 1-4 at Ravenna Army Ammunition Plant, Apr 1, 2004
|
July 29, 2015 |
Final Technical Memorandum Summary of the Findings of Historical Review and Risk Evaluation of the Storage Magazines for the Former Ravenna Army Ammunition Plant, Ravenna Ohio and Appendix A - Supporting Information Paper, June 30, 2015
Final Remedial Action Report for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200, May 14, 2015
Final Remedial Action Report for Soil, Sediment, and Surface Water at RVAAP-48 Anchor Test Area, Apr. 16, 2015
Final Site Inspection for the Military Munitions Response Program at Ravenna Army Ammunition Plant, May 13, 2008
Final Work Plan for the Military Munitions Response Program, Munitions Response Sites Site Inspection at Ravenna Army Ammunition Plant, Sept. 12, 2007
Final Work Plan for Explosive Evaluation of Sewers at Ravenna Army Ammunition Plant, Dec 14, 2006
|
June 30, 2015 |
Final Remedial Action Report for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200, May 14, 2015 |
June 19, 2015 |
Final Remedial Investigation Report for RVAAP-032-R-01 40mm Firing Range Munitions Response Site, Apr 30, 2015
Final Site Inspection Report for RVAAP-28 Suspected Mustard Agent Burial Site, Version 1.0, Apr 27, 2015
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the October 2014 Sampling Event, Mar 30, 2015
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2014, Mar. 20, 2015
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the July 2014 Sampling Event, Mar 13, 2015
Final Remedial Investigation Report for RVAAP-019-R-01 Landfill North of Winklepeck and RVAAP-060-R-01 Block D Igloo Munitions Response Sites, Version 1.0, Mar 4, 2015
|
June 3, 2015 |
Final No Further Action Proposed Plan for RVAAP-034-R-01 Sand Creek Dump Munitions Response Site, Version 1.0, May 28, 2015
Final No Further Action Proposed Plan for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Version 1.0, May 28, 2015
|
May 28, 2015 |
Final No Further Action Proposed Plan for RVAAP-008-R-01 Load Line #1A Munitions Response Site, Version 1.0, May 6, 2015
Final No Further Action Proposed Plan for RVAAP-033-R-01 Firestone Test Facility Munitions Response Site, Version 1.0, May 6, 2015
|
Apr. 22, 2015 |
Final FY 2015 First Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Apr 3, 2015
Final Memorandum for the Record - Recommended Path Forward RVAAP-004-R-01 Open Demolition Area #2 MRS, Mar 26, 2015
Final Explanation of Significant Differences for Post-ROD Changes to the Remedy at RVAAP-05 Winklepeck Burning Grounds, Mar 26, 2015
Final Remedial Investigation Report for RVAAP-034-R-01 Sand Creek Dump MRS, Version 1.0, Mar 24, 2015
Final Remedial Investigation Report for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Mar 10, 2015
Field Change Notice in Support of the Environmental Remediation Services Project at CC RVAAP-69 Building 1048 Fire Station of the Former Ravenna Army Ammunition Plant, Mar 4, 2015
Final Remedial Investigation Report for RVAAP-004-R-01 Open Demolition Area #2 Munitions Response Site, Version 1.0, Volumes 1 and 2, Feb 27, 2015
Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Semiannual Groundwater Monitoring Addendum for 2015, Feb 20, 2015
Final Site Inspection CC RVAAP-71 Barn No. 5 Petroleum Release, Feb 12, 2015
Proposed Background Well Justification Summary for the RVAAP-66 Facility-Wide Groundwater Monitoring Program Remedial Investigation/Feasibility Study Work Plan at the Ravenna Army Ammunition Plant, Oct 10, 2013
Final Site Safety and Health Plan for Asbestos Abatement at RVAAP- 41 Load Line 8 and RVAAP- 43 Load Line 10 at Ravenna Army Ammunition Plant, May 19, 2006
|
Mar. 25, 2015 |
Final Remedial Investigation Report for RVAAP-034-R-01 Sand Creek Dump MRS, Version 1.0, Mar 24, 2015
Final Site Inspection CC-RVAAP-77 Building 1037 Laundry Waste Water Sump, Revision 0, Mar 18, 2015
Final Remedial Investigation Report for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Mar 10, 2015
Final Site Inspection CC RVAAP-71 Barn No. 5 Petroleum Release, Feb 12, 2015
Final Remedial Design for Soil and Dry Sediment at the RVAAP-01 Ramsdell Quarry Landfill, Apr 9, 2014
Final First Installation-Wide Five-Year Review Report for RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 Load Line 1, RVAAP-09 Load Line 2, RVAAP-10 Load Line 3, RVAAP-11 Load Line 4, and RVAAP-12 Load Line 12, Aug 31, 2012
Final Remedial Design for the RVAAP-16 Fuze and Booster Quarry Landfill/Ponds, June 26, 2009
|
Mar. 9, 2015 |
Proposed Background Well Justification Summary for the RVAAP-66 Facility-Wide Groundwater Monitoring Program Remedial Investigation/Feasibility Study Work Plan at the Ravenna Army Ammunition Plant, Oct. 10 2013
Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Additional Well Installation Addendum, Sept. 4, 2013
|
Feb. 26, 2015 |
Engineering Survey Report #6 for Buildings at RVAAP-09 Load Line 2, March 27, 2003
|
Feb. 19, 2015 |
Final Community Relations Plan for the Ravenna Army Ammunition Plant Restoration Program in Portage and Trumbull Counties, Ohio, Feb 4, 2015
Final Remedial Action Report for Soil and Dry Sediment at the RVAAP-01 Ramsdell Quarry Landfill, Jan 30, 2015
FY2014 Ravenna Army Ammunition Plant Installation Action Plan, Public, Jan 21, 2015
Final Project Completion Report for the DLA Storage Area Reclamation-Route 80 Tank Farm and East Ore Yard Culvert Replacement at Ravenna Army Ammunition Plant, Nov 28, 2007
|
Jan 21, 2015 |
Final FY 2014 Annual Report for the Quarterly Land Use Control Inspections at RVAAP-05 Winklepeck Burning Grounds, Jan. 8, 2015
Final Removal Action Report for Environmental Remediation Services at Ravenna Army Ammunition Plant (RVAAP), Dec. 22, 2014
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the May 2014 Sampling Event, Dec 4, 2014
Final Remedial Investigation Report for RVAAP-002-R-01 Erie Burning Grounds Munitions Response Site, Version 1.0, Aug. 27, 2014
Final Remedial Investigation Report for RVAAP-033-R-01 Firestone Test Facility MRS, Version 1.0, Aug. 26, 2014
Final Remedial Investigation Report for RVAAP-050-R-01 Atlas Scrap Yard MRS, Version 2.0, Aug. 25, 2014
|
Dec 22, 2014 |
Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of RVAAP-08 Load Line 1 Initial Groundwater Monitoring, Aug. 12, 1999
Final Closure Activities Work Plan for RVAAP-07 Building 1601 Hazardous Waste Storage, Revision 2 at Ravenna Army Ammunition Plant Aug. 19, 1998
|
Nov. 24, 2014 |
Historical Archives - Specifications Index For Ravenna Ordnance Plant, CY1940-1942, Dec. 3, 1940
|
Oct. 23, 2014 |
Final (Revised) Phase I Remedial Investigation May 2004 Follow-On Groundwater Sampling at RVAAP- 01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant, Mar. 17, 2005
Hazardous and Medical Waste Study No. 37-EF-5360-97 Relative Risk Site Evaluation, Ravenna Army Ammunition Plant, Ravenna, Ohio, 28 October - 1 November 1996, Volume 2, Oct. 28, 1996
Hazardous and Medical Waste Study No. 37-EF-5360-97 Relative Risk Site Evaluation, Ravenna Army Ammunition Plant, Ravenna, Ohio, 28 October - 1 November 1996, Volume 1, Oct. 28, 1996
|
Oct. 14, 2014 |
Final FY 2014 Fourth Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Oct. 10, 2014
Final FY 2014 Third Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Oct. 8, 2014
Final Site Characterization and Focused Feasibility Study for the RVAAP- 51 Dump Along Paris-Windham Road, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Sept. 22, 2014
Final Remedial Investigation for RVAAP-008-R-01 Load Line #1A MRS, Version 2.0, Aug. 28, 2014
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the January 2014 Sampling Event, Aug. 5, 2014
Final Work Plan for the Geophysical Investigation of the RVAAP-28 Suspected Mustard Agent Burial Site, Nov, 15, 2007
Final Accident Prevention Plan Disposal of Contaminated Soil at RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Sept. 29, 2006
Final Work Plan for the Disposal of Contaminated Soil at RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Sept. 29, 2006
Final Geotechnical Laboratory Results for the Phase II Remedial Investigations for RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 at Ravenna Army Ammunition Plant, Apr. 17, 2003
|
Sept. 25, 2014 |
Final Remedial Design for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200 and RVAAP-48 Anchor Test Area, Aug. 22, 2014
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200, Mar 18, 2014
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-48 Anchor Test Area, Mar 18, 2014
Final Facility-wide Groundwater Monitoring Program Report on the October 2012 Sampling Event, May 23, 2013
Final Facility-Wide Groundwater Monitoring Program Report on the July 2012 Sampling Event, Volumes 1 - 2, May 23, 2013
|
Aug 22, 2014 |
Final Community Relations Plan for the Ravenna Army Ammunition Plant Restoration Program in Portage and Trumbull Counties, Ohio, Aug 1, 2014
Final Administrative Closure for the 90 Day Hazardous Waste Storage Area At Building CB-13b in RVAAP- 08 Load Line 1 at Ravenna Army Ammunition Plant, Nov 11, 2002
Final Work Plan and Sampling and Analysis Plan Addenda for the Phase II Remedial Investigation of RVAAP- 04 Open Demolition Area #2 at Ravenna Army Ammunition Plant, June 26, 2002
Final Installation Action Plan Ravenna Army Ammunition Plant - FY 2001, Jan 8, 2001
Final Sampling and Analysis Plan Addendum No. 2 and the Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of RVAAP-08 Load Line 1 at Ravenna Army Ammunition Plant, Sep 6, 2000
Final Report of Closure Activities Open Burning Ground Facility at Ravenna Army Ammunition Plant , Feb 8, 1999
Final Closure Activities Work Plan Open Burning Ground Facility, Revision 2, Ravenna Army Ammunition Plant, Aug 20, 1998
Final Revised Closure Plan for the Open Burning Ground (OBG) Hazardous Waste Treatment Unit at Ravenna Army Ammunition Plant, Oct. 31, 1997
Revised Installation Restoration Program Management Plan, FY96, Dec. 6, 1996
|
July 24, 2014 |
Final FY 2014 Second Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, July 22, 2014
Final FY 2014 First Quarter Land Use Control Inspection, RVAAP-05 Winklepeck Burning Grounds, July 18, 2014
Final FY 2013 Annual Report for the Quarterly Land Use Control Inspections at RVAAP-05 Winklepeck Burning Grounds, July 16, 2014
Final Storm Water Pollution Prevention Plan for the Remediation of Sub-Slab Soils at RVAAP- 08 Load Line 1, RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, Mar. 16, 2010
Final Propellant Removal Summary Report for MEC Support for RVAAP- 08 Load Line 1, Jan 24, 2008
Letter Report for the Sampling of Potential Disposal Areas at RVAAP-08 Load Line 1 and RVAAP-09 Load Line 2, Jan 14, 2000
|
June 10, 2014 |
Final Construction Completion Report for Closure for Clean Hard-Fill Sites RVAAP-08 Site CB-23 and Site CB-22 on Load Line 1 and George Rd., Feb 15, 2014
|
May 7, 2014 |
Final Remedial Design for Soil and Dry Sediment at the RVAAP-01 Ramsdell Quarry Landfill, Apr. 9, 2014
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200, Mar. 18, 2014
Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-48 Anchor Test Area, Mar. 18, 2014
Final Remedial Investigation Report for RVAAP-050-R-01 Atlas Scrap Yard MRS, Version 1.0, Mar. 12, 2014
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2013, Mar. 6, 2014
Final Project Work Plan for Site Inspection at Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops, Revision 1, Mar. 6, 2014
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the August 2013 Sampling Event, Mar. 5, 2014
Final Characterization Sampling Report of Surface and Subsurface Incremental Sampling Methodology at RVAAP-8, 09, 10, 11 and 12 Load Lines 1, 2, 3, 4, and 12, Mar. 29, 2013
|
Apr. 23, 2014 |
Final Remedial Investigation for RVAAP-008-R-01 Load Line #1 MRS, Mar. 12, 2014
|
Mar. 27, 2014 |
Final Technical Memorandum for Land Uses and Facility-Wide Cleanup Goals, Feb. 4, 2014 |
Mar. 07, 2014 |
Accident Prevention Plan Addendum for Asbestos Abatement for Military Munitions Response Program Remedial Investigation Environmental Service, July 9, 2013 |
Feb. 25, 2014 |
Final Phase III Remedial Investigation Report of RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Mar. 1, 2005 |
Jan. 23, 2014 |
Final Closure Plan for the RVAAP- 17 Deactivation Furnace Area (DFA) Hazardous Waste Treatment Unit at Ravenna Army Ammunition Plant, Feb. 23, 2001
Health Risk Assessment No. 39-26-L138-91 for the Deactivation Furnace RCRA Closure Activity, Ravenna Army Ammunition Plant, Ravenna, Ohio, September 26, 1991
Environmental Assessment for Closure of RVAAP-17 Deactivation Furnace at Ravenna Army Ammunition Plant, Apr. 19, 1990
|
Dec. 16, 2013 |
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2012, Revision 1.0, Oct. 31, 2013 |
Nov. 6, 2013 |
FY2013 Ravenna Army Ammunition Plant Installation Action Plan, Public, Nov. 5, 2013 |
Oct. 22, 2013 |
Final Facility-Wide Groundwater Monitoring RVAAP-66 Facility-Wide Groundwater Program Report on the January 2013 Sampling Event, Volumes 1 and 2, Sept 24, 2013 |
Sept. 30, 2013 |
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Quality Assurance Surveillance Plan, Apr. 19, 2012 |
Sept. 16, 2013 |
Final Technical Memorandum for Land Uses and Facility-Wide Cleanup Goals, Sept. 6, 2013
|
Aug. 26, 2013 |
Final Risk Assessment Assumptions Document (RAAD) Addendum to the Work Plan for the Additional Evaluation of the RVAAP-05 Winklepeck Burning Grounds, July 24, 2013
Final Site Inspection and Remedial Investigation Work Plan Addendum at Compliance Restoration Sites CC RVAAP-71 Barn No. 5 Petroleum Release and CC RVAAP-83 Former Buildings 1031 and 1039, Revision 1, June 7, 2013
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-48 Anchor Test Area, May 28, 2013
Final Proposed Plan for Soil, Sediment and Surface Water at RVAAP-13 Building 1200, Apr. 9, 2013
Community Relations Plan for the Ravenna Army Ammunition Plant, Sept 1, 2003
|
June 18, 2013 |
Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-48 Anchor Test Area, May 28, 2013
Final Record of Decision Amendment for Soil and Dry Sediment for the RVAAP-01 Ramsdell Quarry Landfill, May 24, 2013
Final Project Work Plan for Site Inspection at Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops, May 15, 2013
|
May 8, 2013 |
Final Former Water Production Wells and Oil and Gas Wells Survey at Ravenna Army Ammunition Plant and Camp Ravenna, Apr. 17, 2013
Final Project Management Plan for Site Inspection at Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops, Apr. 17, 2013
Final Accident Prevention Plan for Site Inspection at Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops. Apr. 17, 2013
|
Mar. 29, 2013 |
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Monitoring Well Installation Report, Dec 18, 2012 |
Mar. 21, 2013 |
FY2012 Ravenna Army Ammunition Plant Installation Action Plan, Public, Feb. 5, 2013
|
Feb. 28, 2013 |
Final Results of Groundwater Sampling for Major Cations and Anions, Trace Elements, Nutrients, Organic Chemicals, and Isotopes of Hydrogen and Oxygen at RVAAP-66 Facility-Wide Groundwater, April 2011, Jan. 4, 2013
|
Dec 21, 2012 |
Final Work Plan for Additional Evaluation of the RVAAP-05 Winklepeck Burning Grounds, Oct. 29, 2012
|
Nov 29, 2012 |
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the April 2012 Sampling Event, Oct. 24, 2012
Final Site Inspections and Remedial Investigations Work Plan at Compliance Restoration Sites, Oct 3, 2012
Final Property Management Plan for the Designated Areas of Concerns and Munitions Response Sites, Volume One - Version 1.0, Aug. 1, 2012
Final Facility Wide Groundwater Monitoring Program Annual Report for 2006 at Ravenna Army Ammunition Plant, May 31, 2007
Final Facility Wide Groundwater Monitoring Program Report on the July 2006 Sampling Event at Ravenna Army Ammunition Plant - Main Report and Appendices A-C, Mar. 9, 2007
Final Facility Wide Groundwater Monitoring Program Report on the March 2006 Sampling Event at Ravenna Army Ammunition Plant, Aug. 31, 2006
|
Oct 22, 2012 |
Operations and Maintenance Removal of the Sand Creek Barrier RVAAP-004-R-01 Open Demolition Area #2 MRS, August 22, 2012
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #12, August 21, 2012
Final Environmental Baseline Summary Report, Ravenna Training and Logistics Site, Portage and Trumbull Counties, Ohio, Feb 1, 2000
|
Sept 28, 2012 |
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the January 2012 Sampling Event, July 18, 2012
|
Sept 27, 2012 |
Final Facility-Wide Groundwater Monitoring Program Report of the July 2007 Sampling Event at Ravenna Army Ammunition Plant, Volume 1and 2, Mar. 27, 2008 |
Aug 30, 2012 |
Final Removal Action Report for the 2nd Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, Version 1.0, Volumes 1 & 2, July 31, 2012
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #11, July 24, 2012
Final Project Completion Report for Disposal of Drums from RVAAP-004-R-01 Open Demolition Area #2 MRS Containing White Phosphorus, Apr. 27, 2012
|
Aug 02, 2012 |
Final Results for Intitial Assessment of CC-RVAAP-79 DLA Group 2 Ammunition Storage Area, Apr 19, 2012 |
June 29, 2012 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #10, June 14, 2012
Revised Final Modified Proposed Plan for Soil and Dry Sediment at RVAAP-01 Ramsdell Quarry Landfill, June 6, 2012
Operations and Maintenance Quarterly Effectiveness Evaluation Report #3 for the Sand Creek Barrier, May 30, 2012
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #9, May 30, 2012
Final Facility-Wide Groundwater Monitoring Program Report on the October 2011 Sampling Event, Volumes 1 & 2, May 10, 2012
Final Historical Records Review Report for CC-RVAAP-71 Barn No. 5 Petroleum Release and CC-RVAAP-83 Former Buildings 1031 and 1039, 2011 PBA Environmental Investigation and Remediation at 14 Compliance Restoration Sites, Revision 0, May 9, 2012
NPDES General NPDES Permit No. OHR000004 and Facility Permit No. 3GR00112*DG for Stormwater, CY2011, Dec. 15, 2011
NPDES General NPDES Permit No. OHR000004 and Facility Permit No. 3GR00112*DG for Stormwater, CY2006, July 13, 2012
|
May 30, 2012 |
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 7, July 1943
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 6, June 1943
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 5, May 1943
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 4, April 1943
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 3, March 1943
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 11, November 1942
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 10, October 1942 (Volume, Number, and Date were Misprinted)
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 9, September 1942
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 8, August 1942
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 7, July 1942
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 6, June 1942
|
May 29, 2012 |
Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Accident Prevention Plan, Ravenna Army Ammunition Plant, May 14, 2012
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #8, April 26, 2012
Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1971, Jan. 1, 1971
Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1970, Jan. 1, 1970
Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1969, Jan. 15,1969
Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1963, Jan. 1, 1963
Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1962, Jan. 2, 1962
Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1961, Jan. 1, 1961
Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1960, Jan. 1, 1960
Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1959, Jan. 1, 1959
Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1958, March 1, 1958
Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1957, Feb. 1, 1957
Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1956, Jan. 1, 1956
Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1955, Feb. 1,1955
Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1954, Jan. 1, 1954
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 4, April 1942
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 3, March 1942
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 1, January 1942
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 1, Number 6, December 1941
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 1, Number 5, November 1941
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 1, Number 4, October 1941
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 1, Number 3, September 1941
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 1, Number 2, August 1941
|
Apr. 30, 2012 |
Final Modified Proposed Plan for Soil and Dry Sediment at RVAAP-01 Ramsdell Quarry Landfill, Apr 10, 2012.
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #7, March 29, 2012.
Final (Revised) Position Paper for the Application and Use of Facility-Wide Human Health Cleanup Goals at the Ravenna Army Ammunition Plant, Feb. 23, 2012
Final Project Management Plan for 2011 PBA Environmental Investigation and Remediation at 14 Compliance Restoration Sites, Jan 27, 2012.
|
Apr. 02, 2012 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #6, February 27, 2012
Operations and Maintenance Quarterly Effectiveness Evaluation Report #1 for the Sand Creek Barrier, February 23, 2012, Feb. 23, 2012
Operations and Maintenance Quarterly Effectiveness Evaluation Report #2 for the Sand Creek Barrier, February 27, 2012, Feb. 23, 2012
Final Facility-Wide Groundwater Monitoring Program Annual Report for 2011, Ravenna Army Ammunition Plant, Ravenna, Ohio, Feb. 23, 2012
Final Historical Records Review Report for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), Revision 0, Dec. 22, 2011
Final Facility-Wide Groundwater Monitoring Program Annual Report for 2007, Mar. 24, 2008
Final Supplemental Human Health Risk Assessment for Revised Range Maintenance Soldier at the Former RVAAP-05 Winklepeck Burning Grounds, May 5, 2006
|
Mar. 30, 2012 |
Submission Format Guidelines for the Ravenna Army Ammunition Plant, Version 20, Mar. 23, 2012
Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200, Mar. 22, 2012
Final Facility-Wide Groundwater Monitoring Program Report on the July 2011 Sampling Event, Volumes 1 & 2, Feb 22, 2012
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Addendum, Jan 6, 2012
|
Feb. 28, 2012 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #5, January 31, 2012
Final Investigation Report for the Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops and Other Environmental Services, Jan. 27, 2012
United States Environmental Protection Agency Soil Screening Guidance: User's Guide, Second Edition, July 1996
Final Ohio Environmental Protection Agency Technical Guidance Manual for Hydrogeologic Investigations and Ground Water Monitoring, February 1995 (Updated 2012), Feb. 1, 1995
Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1953, Jan. 7, 1953
Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1952, Jan 4, 1952
Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1951, Aug. 3, 1951
Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1946, July 19, 1946
|
Jan. 30, 2012 |
Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Semiannual Monitoring Addendum, Ravenna Army Ammunition Plant, Ravenna, Ohio, Jan 23, 2012
Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at the RVAAP- 48 Anchor Test Area, Ravenna Army Ammunition Plant, Ravenna, Ohio, Jan. 18, 2012
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Addendum, Jan. 06, 2012
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #4, December 19, 2011
Initial Planning for Facility-Wide Surface Water Monitoring for the Ravenna Army Ammunition Plant, Aug. 1, 2002
|
Dec. 29, 2011 |
Final Work Plan Addendum for Military Munitions Response Program Remedial Investigation Environmental Services, Version 1.0, Dec. 7, 2011
Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Project Management Plan, Nov. 17, 2011
|
Nov. 30, 2011 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #3, November 3, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #2, October 25, 2011
Final Work Plan Addendum for 2010 Preliminary Assessment Compliance Restoration Sites CC-RVAAP-78 Quarry Pond Surface Dump, Oct. 24, 2011
|
Oct 24, 2011 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #1-High water event, September 28, 2011
Operations and Maintenance Quarterly Effectiveness Evaluation Report #4 for the Sand Creek Barrier, September 27, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #14, September 14, 2011
|
Sept 30, 2011 |
Final Facility-Wide Groundwater Monitoring Program Report on the April 2011 Sampling Event, Volumes 1 & 2, Sept 7, 2011
Final Engineering Evaluation for Soil and Dry Sediment at RVAAP-01 Ramsdell Quarry Landfill, Sept 2, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #13, August 30, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #12, July 27, 2011
FY2011 Ravenna Army Ammunition Plant Installation Action Plan, Public, June 28, 2011
|
Aug 31, 2011 |
Operations and Maintenance Quarterly Effectiveness Evaluation Report #3 for the Sand Creek Barrier, August 3, 2011
Final Facility-Wide Groundwater Monitoring Program Report on the January 2011 Sampling Event, Volumes 1-3, July 15, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #11, June 21, 2011
Final Work Plan for the Geochemical Evaluation of Metals in Groundwater at Ravenna Army Ammunition Plant, Mar. 25, 2010
|
July 26, 2011 |
Final Geochemical Evaluation of Metals in Groundwater at Ravenna Army Ammunition Plant, June 22, 2011
|
June 30, 2011 |
Final Data Quality Objectives Report for RVAAP- 05 Winklepeck Burning Grounds, Version 1.0, June 8, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #10, June 2, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #9, May 24, 2011
|
May 26, 2011 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #8, April 26, 2011
|
Apr. 28, 2011 |
Final Historical Records Review Report for 2010 Preliminary Assessment Compliance Restoration Sites CC-RVAAP-78 Quarry Pond Surface Dump and CC-RVAAP-80 Group 2 Propellant Can Tops, Apr. 14 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #7, March 23, 2011
Operations and Maintenance Quarterly Effectiveness Evaluation Report #2 for the Sand Creek Barrier, March 23, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #6, March 9, 2011
|
Mar. 31, 2011 |
Final Facility-Wide Groundwater Monitoring Program Report on the October 2010 Sampling Event, Volume 1, Mar. 16, 2011
Final Facility-Wide Groundwater Monitoring Program Annual Report for 2010, Mar. 11, 2011
Final Remediation Completion Report Sub-Slab Soils at RVAAP- 08 Load Line 1, Mar. 10, 2011
Final Sampling Report of Surface and Subsurface Incremental Sampling Methodology at Load Lines 1, 2, 3, and 4 (RVAAP-08, 09, 10 and 11), Volumes 1 & 2, Mar. 5, 2011
Final Waste Management Plan for RVAAP-004-R-01 Open Demolition Area #2 MRS for the White Phosphorus Disposal at the Rocket Ridge Area, Volume 1, Mar. 2, 2011
Final Work Plan for the Military Munitions Response Program Remedial Investigations Environmental Services, Mar. 1, 2011
Final Project Work Plan For the Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops and other Environmental Services, Feb, 25, 2011
Final Facility-Wide Safety and Health Plan for Environmental Investigations at the Ravenna Army Ammunition Plant, 2011, Feb. 24, 2011
Final Facility-Wide Sampling and Analysis Plan for Environmental Investigations at the Ravenna Army Ammunition Plant, 2011, Feb. 24, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #5, February 17, 2011
|
Feb. 28, 2011 |
Final Facility-Wide Groundwater Monitoring Plan Report of the July 2010 Sampling Event, Volumes 1 - 3, Jan. 28, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #4, January 20, 2011
|
Feb. 18, 2011 |
Final of the Sampling and Screening Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Lines 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Sept 15, 2009 |
Jan. 31, 2011 |
Final Status Survey Report for the Ravenna Army Ammunition Plant Former West Tank Farm Area, Dec. 16, 2004
Final Report Ravenna Army Ammunition Plant, Former West Tank Farm Area, Monazite Sand Removal Project Phase IV, Project No. USA 00-005, Revision 0, Oct. 26, 2004
Amended Final Status Survey Plan, Ravenna Army Ammunition Plant, Former West Tank Farm Area, Monazite Sand Removal Project, Phase IV, Revision 1, Oct 29, 2003
|
Jan. 28, 2011 |
Final Digital Geophysical Mapping Report for the RVAAP-34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, and RVAAP- 28 Mustard Agent Burial Site, Version 1.0, Jan. 11, 2011
Operations and Maintenance Quarterly Effectiveness Evaluation Report #1 for the Sand Creek Barrier, January 10, 2011
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #3, December 16, 2010
|
Dec. 20, 2010 |
Final Project Management Plan for the Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops and Other Environmental Services, Dec. 17, 2010
Final Remediation Completion Report Sub-Slab Soils at RVAAP-09 Load Line 2, RVAAP- 10 Load Line 3 and RVAAP- 11 Load Line 4, Dec. 17, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #2, November 23, 2010
Final Project Management Plan Performance-Based Contract for Six Environmental Areas of Concern at Ravenna Army Ammunition Plant, July 14, 2005
|
Dec. 08, 2010 |
Final Sampling and Analysis Plan Addendum for the Interim Removal Action of RVAAP- 44 Load Line 11 at Ravenna Army Ammunition Plant, Jan. 2, 2001
Final Reassessment of the Ravenna Army Ammunition Plan, Report No. 132R, Dec. 1, 1982
Final Installation Assessment for Ravenna Army Ammunition Plant, Report No. 132, Nov. 1, 1978
|
Nov. 30, 2010 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #1, October 14, 2010
Final Site Safety and Health Plan Addendum for 2010 Phase I Remedial Investigation Services Compliance Restoration Sites CC-RVAAP-78 and CC-RVAAP-80, Sept. 30, 2010
|
Oct. 18, 2010 |
Final Project Management Plan for 2010 Phase I Remedial Investigation Services Compliance Restoration Sites CC-RVAAP-78 and CC-RVAAP-80, Sept. 30, 2010
Final Installation Action Plan Ravenna Army Ammunition Plant - FY 2010, Sept. 24, 2010
Final Waste Management Plan for RVAAP-004-R-01 Open Demolition Area #2 White Phosphorus Disposal at the Rocket Ridge Area, Sept 23, 2010
Final Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 08 Load Line 1 and Other Building Locations, Sept 17, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #12, September 15, 2010
Operations and Maintenance Quarterly Effectiveness Evaluation Report #4 for the Sand Creek Barrier, September 15, 2010
Final Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, Sept. 10, 2010
Final Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), Sept 10, 2010
Final Public Involvement Plan Addendum for Military Munitions Response Program Remedial Investigation Environmental Services, Sept. 1, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #11, August 25, 2010
Final Remedial Action Report for the RVAAP-12 Load Line 12, Aug 9, 2010
Final Site Characterization and Focused Feasibility Study Work Plan for the RVAAP- 51 Dump Along Paris-Windham Road at Ravenna Army Ammunition Plant, Aug 8. 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #10, July 28, 2010
Operations and Maintenance Quarterly Effectiveness Evaluation Report #3 for the Sand Creek Barrier, July 28, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #9, June 30, 2010
Revised Final Remedial Design for the RVAAP- 01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant, Jun 17, 2010
|
Sept. 3, 2010 |
Final Work Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Project Management Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010
Final Quality Control Plan for the Revision of the Facility-Wide Environmental Documents, July 27, 2010
Final Facility-wide Groundwater Monitoring Program Report on the January 2010 Sampling Event, July 6, 2010
Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010
|
July 30, 2010 |
Final Facility-Wide Groundwater Monitoring Program Report on the 2009 Metals Sampling Event, Volume 1 - Main Text, Appendices A - C, June 2, 2010
Final Quality Control Plan for the Geochemical Evaluation of Metals in Groundwater, May 26, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #8, May 2010. May 24, 2010
Operations and Maintenance Quarterly Effectiveness Evaluation Report #1 for the Sand Creek Barrier, May 2010, May 24, 2010
Final Monitoring Report for the Deep Bedrock Well Installation in the Basal Sharon Conglomerate, May 21, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #7, April 2010, April 29, 2010
Final Geophysical Prove-out Report for Environmental Services at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, And RVAAP- 28 Mustard Agent Burial Site, Version 1.0, March 25, 2010.
|
June 30, 2010 |
Final Installation Action Plan Ravenna Army Ammunition Plant - FY 2009” September 18, 2009 |
June 2, 2010 |
Final Public Involvement Plan Addendum for the Time Critical Removal Action at the Rocket Ridge Area, May 7, 2010
Final Project Work Plan for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, May 7, 2010
Final Project Management Plan for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, May 7, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #6, March, 2010
|
April 29, 2010 |
Final Facility-Wide Groundwater Monitoring Program Report on the October 2009 Sampling Event, Apr. 19, 2010
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 5, May 1942
Historical Archives - Ravenna Ordnance Center Commissary Building (Bldg. 1038), APCO, Ohio, Post Card
|
March 29, 2010 |
Final Facility-Wide Human Health Cleanup Goals for Ravenna Army Ammunition Plant, Mar. 23, 2010
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 2, February 1943
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 1, January 1943
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 12, December 1942
Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 2, February 1942
Historical Archives - Ravenna Ordnance Plant Manual of Safe Practices, Jan 1941
|
Mar. 15, 2010 |
Final Remedial Action Report for the RVAAP- 16 Fuze and Booster Quarry Landfill/Ponds. Mar. 5, 2010
Final Facility-Wide Groundwater Monitoring Program Annual Report for 2009, Mar 4, 2009
Final Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1, Mar. 1, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #5, February 2010, Feb. 18, 2010
|
Feb. 23, 2010 |
Final Sampling and Analysis Plan Addendum No. 1 for Environmental Service at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, and RVAAP- 28 Mustard Agent Burial Site, Feb. 11, 2010. |
Feb. 12, 2010 |
Operations and Maintenance Quarterly Effectiveness Evaluation Report #1 for the Sand Creek Barrier, January 2010, Feb. 1, 2010
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #4, January 2010
Final Remedial Design for the RVAAP- 01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant, Jan. 25, 2010
Final Facility-Wide Groundwater Monitoring Program Report on the July 2009 Sampling Event, Volume 1, Jan. 25, 2010
Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #3, December 2009
Final Environmental Baseline Survey for the Ravenna Army Ammunition Plant, Sept. 25, 1998
|
Dec. 18, 2009 |
Final Removal Action Report for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, Dec. 17, 2009
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #2, Nov. 24, 2009
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #1, Oct. 29, 2009
|
Dec. 10, 2009 |
Final Multi-Increment Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Dec. 04, 2009
|
Nov. 30, 2009 |
Final Remedial Action Completion Report for RVAAP- 05 Winklepeck Burning Grounds Pads 61/61A, 67, and 70 at Ravenna Army Ammunition Plant, Nov 19, 2009
Final Data Quality Objectives Report for RVAAP- 03 Open Demolition Area #1 at Ravenna Army Ammunition Plant, Oct. 09, 2009
Final Construction Completion Report Time Critical Response Action for the Rocket Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program, Sep. 23, 2008
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) August 2008 – September 2009, Aug. 26, 2008
Final Revised Operations and Maintenance Plan for the Sand Creek Barrier System, the Time Critical Response Action at the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program, Aug. 7, 2008
Final Time Critical Response Action Plan for the Rocket Ridge Area at Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program, Mar. 1, 2008
Final Work Plan for Sand Creek Survey Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program Time Critical Response Action, Oct. 24, 2007
|
Nov. 18, 2009 |
Final Facility-Wide Groundwater Monitoring Program Report on the April 2009 Sampling Event, Volume 1, Appendices A - D, Nov 09, 2009
Final Safety, Health, and Emergency Response Plan for Environmental Services at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, and RVAAP- 28 Mustard Agent Burial Site, Oct. 14, 2009
Final Investigation of the Under Slab Soils Post Slab and Foundation Removal at RVAAP- 39 Load Lines 5, RVAAP- 40 Load Line 7, RVAAP- 41 Load Line 8, and RVAAP- 43 Load Line 10, Jan. 09, 2009
Final Sampling and Analysis Plan and the Site Safety and Health Plan for the Exposed Soil Sampling and Characterization After Slab and Foundation Removals at RVAAP-39 Load Line 5, RVAAP-40 Load Line 7, RVAAP-41 Load Line 8, and RVAAP-43 Load Line 10, Aug. 1, 2007
|
Oct. 06, 2009 |
Remedial Design for RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant, Oct. 1, 2009
Operations and Maintenance Quarterly Effectiveness Evaluation Reports (#4) and Barrier Repairs Time Critical Response Action for the Rocket Ridge Area of RVAAP-004-R-01 Open Demolition Area #2, Sept. 02, 2009
|
Sept. 28, 2009 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, September Trip Report (#12), Sept. 2, 2009
Wetlands and Other Waters Delineation Report Remedial Action Areas at Ramsdell Quarry Landfill, Load Line 12, and Fuze and Booster Quarry Landfill/Ponds at the Ravenna Army Ammunition Plant and Ravenna Training and Logistics Site, Ravenna, Ohio. Dec. 29, 2008
Final Ravenna Army Ammunition Plant's Facility Wide Surface Water Assessment Workplan, Jan. 27, 2003
|
Sept. 17, 2009 |
Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009
Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009
|
Sept. 1, 2009 |
Final Project Completion Report for the Munitions Response for Demolition of Load Lines 5, 7, Building 1039, and Transite Removal at Building T-1604, Volume 1 Main Text and Appendices A-C, Dec 13, 2007 |
Aug 31, 2009 |
Final Work Plan Addendum 1 for the Sampling of Soils Below Floor Slabs and Remediation at RVAAP- 08 Load Line 1 and Other Building Locations at Ravenna Army Ammunition Plant, Aug. 3, 2009
Final of the Facility-Wide Groundwater Monitoring Program Report on the January 2009 Sampling Event, July 31, 2009
Final Sampling and Analysis Plan for the Remedial Investigation of RVAAP- 67 Facility-wide Sewers Addendum No. 1 at Ravenna Army Ammunition Plant, July 31, 2009
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, July Trip Report (#11), July 29, 2009
Addendum to the Final Site Safety and Health Plan, Time Critical Removal Action at the Rocket Ridge Are within RVAAP- 004-R-01 Open Demolition Area #2 MRS at Ravenna Army Ammunition Plant, July 17, 2009
Final Ravenna Army Ammunition Plant Facility Wide Ecological Risk Work Plan, April 21, 2003
|
July 22, 2009 |
Final Data Quality Objectives for the RVAAP- 34 Sand Creek Disposal Road Landfill at Ravenna Army Ammunition Plant, Version 1.0,
Final Geophysical Investigation Plan for RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1 and RVAAP- 28 Mustard Agent Burial Site at Ravenna Army Ammunition Plant, Version 1.0, >
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report sTime Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, June Trip Report (#10), June 24, 2009
|
July 08, 2009 |
Final Public Involvement Plan Addendum for Rocket Ridge at Ravenna Army Ammunition Plant, 6/30/09
Final Project Work Plan for the Time Critical Removal Action (TCRA) at Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2 at Ravenna Army Ammunition Plant. 6/30/09
Final Project Management Plan for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area of RVAAP-04 Open Demolition Area #2 at Ravenna Army Ammunition Plant, 6/30/09
Final Remedial Design for RVAAP- 16 Fuze and Booster Quarry Landfill Ponds at Ravenna Army Ammunition Plant, 6/26/09
Final Position Paper for the Application and Use of Facility-Wide Human Health Cleanup Goals, 6/1/09
Radiation Survey Report No. CESWT-SO-R2-05-98 Monazite AOC at Ravenna Army Ammunition Plant, 5/18/98
|
June 26, 2009 |
Final Facility-Wide Groundwater Monitoring Program Report on the October 2008 Sampling Event at Ravenna Army Ammunition Plant, June 15, 2009
|
June 18, 2009 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report (#3) Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, May Trip Report (#9), May 27, 2009
Final Data Quality Objectives for the RVAAP- 28 Mustard Agent Burial Site at Ravenna Army Ammunition Plant, Version 1.0, May 11, 2009
|
May 7, 2009 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report sTime Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, April Trip Report (#8), Apr 28, 2009
Final Remedial Action Completion Report for the Remediation of Soils and Dry Sediments at RVAAP- 08 Load Line 1, RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, June 30, 2008
Final of the Time Critical Response Action Plan for the Rocket Ridge Area at RVAAP-04 Open Demolition Area #2, Mar. 1, 2008
|
Apr 30, 2009 |
Final Record of Decision for Soil and Dry Sediment at RVAAP- 49 Central Burn Pits at Ravenna Army Ammunition Plant, Apr 21, 2009
Final Sampling and Analysis Plan for Groundwater Sampling at RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant, Addendum 1, Apr 14, 2009
|
Apr 14, 2009 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report sTime Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, March Trip Report (#7), Mar, 25, 2009 |
Mar 31, 2009 |
Final Record of Decision for Soil and Dry Sediment for RVAAP- 01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant. Mar 24, 2009
Final Record of Decision for Soil and Dry Sediment for RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant. Mar 20, 2009
Final Facility-Wide Groundwater Monitoring Program Report on the July 2008 Sampling Event, Volume 1-6, Feb. 12, 2009
Final Revised Operations and Maintenance Plan Sand Creek Barrier System, Time Critical Response Action Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Site-Specific Health and Safety Plan, Aug 7, 2008
Final Revised Operations and Maintenance Plan Sand Creek Barrier System, Time Critical Response Action Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Explosive Site Plan, Aug 7, 2008
Final Revised Operations and Maintenance Plan for the Sand Creek Barrier System, the Time Critical Response Action at the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Military Munitions Response Program, Aug 7, 2008
Final Project Coordination Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3),
Mar 13, 2008
Final Facility-Wide Groundwater Monitoring Program Report on the April 2007 Sampling Event. Nov 27, 2007.
|
Mar. 26, 2009 |
Final Remedial Design/Removal Action Plan for RVAAP- 34 Sand Creek Disposal Road Landfill at Ravenna Army Ammunition Plant 3/21/2004 |
Feb. 19, 2009 |
Final Remedial Action work Plan for RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, July 27, 2008 |
Feb. 9, 2009 |
Final Work Plan for the Removal of Buildings and Concrete Floor Slabs at RVAAP- 08 Load Line 1 and Other Miscellaneous Buildings and Removal and Disposal of Pallets at Ravenna Army Ammunition Plant, Jan 16, 2009
Final Accident Prevention Plan for the Removal of Buildings and Concrete Floor Slabs at RVAAP- 08 Load Line 1 and Other Miscellaneous Buildings and Removal & Disposal of Pallets at Ravenna Army Ammunition Plant, Jan 16, 2009
Final Project completion Report for the Munitions Response for Demolition of Load Lines 5, 7, Building 1039, and Transite Removal at Building T-1604, Removal of Remaining Concrete and Miscellaneous Debris at Load Lines 6, 9 and 11. Dec. 13, 2007
|
Jan, 12, 2009 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, November Trip Report (#4), Nov 19, 2008
Report on the Field Survey of Concrete Monuments at Ravenna Army Arsenal, Jan 6, 1999
|
Jan, 9, 2009 |
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, December Trip Report (#5), Dec. 16, 2008
Final Archives Search Report for Ravenna Army Ammunition Plant, Jun. 1, 2004
|
Jan, 5, 2009 |
Final Sampling and Analysis Plan Addendum No. 1 for the Deep Bedrock Well Installation in the Basal Sharon Conglomerate. 12/19/2008
Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008
Final Removal Action Report for the RVAAP- 49 Central Burn Pits, Dec. 05, 2008
Final Contractor Quality Control Plan for the Remedial Action at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Nov. 17, 2008
Final Facility-Wide Groundwater Monitoring Program Report on the April 2008 Sampling Event, Nov. 10, 2008
Final Facility-Wide Groundwater Monitoring Program Background Calculation Update, Oct 28, 2008
Final Quality Assurance Project Plan Part II Addendum of the MEC Clearance and Munitions Response for RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Oct. 27. 2008
Final Field Sampling and Analysis Plan MEC Clearance and Munitions Response Amendment 1 for RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Oct. 24, 2008
Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, OctoberTrip Report, Oct. 23, 2008
Final Explosives Safety Submission for the Munitions and Explosives of Concern Survey and Munitions Response of RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Revision 3, Amendment 3, Oct. 9, 2008
Final Site Safety and Health Plan Amendment for the Phase II MEC Clearance and Munition Response at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Sept. 04, 2008
Final Project Management Plan for RVAAP- 05 Winklepeck Burning Grounds Remedial Design/Remedial Action, Revision 2, Sept. 4, 2008
Final Phase I Remedial Investigation Report for RVAAP-03 Demolition Area #1 at Ravenna Army Ammunition Plant, Dec, 2001
|
Dec. 5, 2008 |
Proposed Plan for the Soil and Dry Sediment at the RVAAP-49 Central Burn Pits
|
Oct. 29, 2008 |
Final Record of Decision for Soil and Dry Sediment at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Aug. 6, 2008
Documents Summarizing Ammunition Production at Ravenna Arsenal between 1941 - 1974, Jan. 1, 1974
|
Oct. 24, 2008 |
Final Construction Completion Report Time Critical Response Action for the Rocket Area of RVAAP- 04 Open Demolition Area #2 Military Munitions Response Program, Sept. 23, 2008
Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008
Final Facility-Wide Groundwater Monitoring Program Background Calculation Update, Sept, 12, 2008
Final Project Management Plan for RVAAP-05 Winklepeck Burning Grounds Remedial Design/Remedial Action, Revision 2, Sept 4 2008
Final of the Facility-Wide Groundwater Monitoring Program Report of the January 2008 Sampling Event, Main Text and Appendices A-C, Volume 1-3, Aug. 22, 2008
|
August 7, 2008 |
Ravenna Army Ammunition Plant Deliverable Document Format Guidelines, Version 7.0, Aug. 2008
|
August 4, 2008 |
Final Remedial Investigation Report Addendum No. 1 for the RVAAP- 49 Central Burn Pits at Ravenna Army Ammunition Plant, June 2008
|
June 24, 2008 |
Final of the Work Plan for the Sampling of Soils Below Floor Slabs at Load Lines 2-4 and Excavation and Transportation of Contaminated Soils to Load Line 4 (Buildings G-1, G-1A, and G-3), May 29, 2008
Final Report on the Geophysical Investigation of RVAAP-28 the Suspected Mustard Agent Burial Site. May 21, 2008
|
June 12, 2008 |
Final Report on the Geophysical Investigation of RVAAP-28 the Suspected Mustard Agent Burial Site. May 21, 2008
|
June 5, 2008 |
RVAAP Site Tour Agenda - 1968
|
May 15, 2008 |
Final Site Inspection for the Military Munitions Response Program, May 2008
RVAAP’s Facility Wide Human Health Risk Assessor Manual Amendment 1. 01 Dec 2005
|
May 13, 2008 |
Final Report for the Phase I Remedial Investigation at RVAAP-42 Load Line 9, Volume 1-4, Oct 2007
Final Report for the Phase I Remedial Investigation of RVAAP-33 Load Line 6, Volume 1- 4, Aug 2007
|
May 12, 2008 |
Final Facility-Wide Groundwater Monitoring Program Report on the October 2007 Sampling Event, Volume 1 – Main Text and Appendices A-C, Apr 2008
|
May 9, 2008 |
Final Removal Action Work Plan for RVAAP-49 Central Burn Pits, Aug 2007
Final Safety, Health and Emergency Response Plan Addendum for the Remediation of Soils at Load Lines 1, 2, 3, and 4, June 2007
Final Sampling and Analysis Plan Addendum No. 2 for the Phase I Remedial Investigation of Ramsdell Quarry Landfill, June 2006
Final Report on the Additional Groundwater Monitoring Well Installation and Groundwater Sampling at the Suspected RVAAP-28 Mustard Agent Burial Site, May 2006
Final Facility Wide Groundwater Monitoring Program Report on the May 2006 Sampling Event, Oct 2006
Final Facility Wide Groundwater Monitoring Program Report on the April 2005 Sampling Event, Aug 2005
Final Phase I Remedial Investigation December 2004 Follow-On Groundwater Sampling at RVAAP-01 Ramsdell Quarry Landfill, June 2005
Final Site Safety and Health Plan for the Phase II MEC Clearance and Munitions Response at RVAAP-05 Winklepeck Burning Grounds, Mar. 2005
Final Work Plan for Phase II MEC Clearance and Munitions Response at RVAAP-05 Winklepeck Burning Grounds, Mar. 2005
Revised Final Focused Feasibility Study for RVAAP-05 Winklepeck Burning Grounds, Mar, 2005
Final Phase I MEC Density Survey After Action Report at RVAAP-05 Winklepeck Burning Grounds, Mar, 2005
Final Facility Wide Groundwater Monitoring Program Annual Report for 2005
Final Facility Wide Groundwater Monitoring Program Report on the July 2005 Sampling Event-Main Report and Appendices A-C, Nov 2005
Final Work Plan and Sampling and Analysis Addenda for the Groundwater Monitoring Well Installation and Groundwater Sampling at the Suspected RVAAP-28 Mustard Agent Burial Site, Nov 2004
Final Proposed Remedial Goal Options for Soil at RVAAP- 08, 09, 10, and 11 Load Lines 1- 4, Sept. 2004
Final Report for the Assessment of Potential Contamination at the DLA Outdoor Storage Areas, Aug, 2003
Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of RVAAP-12 Load Line 12, Sept, 2000
Final Site Safety and Health Plan Addendum No. 1 for the Phase I Remedial Investigation of Demolition Area #1, Oct 1999
|
May 1, 2008 |
Final Remedial Action Work Plan Remediation of Soils at Load Lines 1- 4 (RVAAP- 08, 09, 10, and 11) 4/5/2007
|
Apr. 4, 2008 |
Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
|
Mar. 06, 2008 |
Final Construction Completion Report, Munitions Response for the Demolition of RVAAP-41 Load Line 8 and RVAAP-43 Load Line 10, Addendum 1 Demolition of Building 1034, Mar. 2008
Final Letter Report Work Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and Excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3) Feb.2008
|
Feb. 12, 2008 |
Final Record of Decision for Soil and Dry Sediment at the RVAAP-02 Erie Burning Grounds, Sept 19, 2007
Final Record of Decision for Soil and Dry Sediment at the RVAAP-04 Open Demolition Area #2, Sept 19, 2007
Final Record of Decision for Soil and Dry Sediment at the RVAAP-16 Fuze and Booster Quarry Landfill/Ponds, Sept 19, 2007
|
Jan. 25, 2008 |
Final Revised Interim Record of Decision for the Remediation of Soils at RVAAP-08, 09, 10, 11 Load Lines 1 – 4, Jan.18, 2007
|
Jan. 16, 2008 |
Installation Action Plan for Ravenna Army Ammunition Plant. FY 2007, January, 2008
|
Sept. 27 , 2007 |
Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
|
Aug. 31, 2007 |
Closure, Completion of Closure for RVAAP-14 Load Line 6 Evaporation Unit. January 1993
Closure, Completion of Partial Closure of RVAAP-07 Building 1601 Hazardous Waste Storage and RVAAP-05 Winklepeck Burning Grounds (OBG). May 1999
Closure, Final Closure Inspection of RVAAP-01 Ramsdell Quarry Landfill. Sept. 1990
Closure, Final Closure Report Approval for Buildings W-221 and X-232. July 2000
Closure, Final Closure Report for RVAAP-37 Pesticide Storage Building T-4452. Sept. 2000
Closure, No Further Action for RVAAP-27 Building 854-PCB Storage. Sept. 1999
Closure, No Further Action, Statement of Basis for the Final Decision for RVAAP-47 Building T-5301 Interim Removal Action. Dec. 2000
|
July 18, 2007 |
Final Stormwater Pollution Prevention Plan Remediation of Soils at RVAAP-08, 09, 10, and 11, Load Lines 1-4. July 12, 2007. Shaw.
|
July 09, 2007 |
Final Facility-wide Groundwater Monitoring Program Report on the January 2007 Sampling Event (Sample Event No. 1). July 9, 2007. SpecPro Inc.
|
June 26, 2007 |
Final Action Memorandum for Central Burn Pits (RVAAP-49, Ravenna Army Ammunition Plant, Ravenna, Ohio. June 2007
|
Apr. 02, 2007 |
Final Proposed Plan for Soil and Dry Sediment at Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007.
Final Proposed Plan for Soil and Dry Sediment at the Ramsdell Quarry Landfill (RVAAP-01) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007
Final Proposed Plan for Soil and Dry Sediment at Load Line 12 (RVAAP-12) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007
Final Facility-Wide Groundwater Monitoring Program Plan For The Ravenna Army Ammunition Plant Ravenna, Ohio. September 2004
|
Mar. 20, 2007 |
Public Presentation for Proposed Plans at Erie Burning Grounds and Open Demolition Area #2, March 13, 2007
|
Feb. 27, 2007 |
Final Proposed Plan for Soil and Dry Sediment at Open Demolition Area #2 (RVAAP- 04) Ravenna Army Ammunition Plant Ravenna, Ohio February 2007
|
Feb. 27, 2007 |
Final Proposed Plan for Soil and Dry Sediment at Erie Burning Grounds (RVAAP-02) Ravenna Army Ammunition Plant Ravenna, Ohio February 2007
|
Jan. 31, 2007 |
Final Engineering Evaluation/Cost Analysis for Central Burn Pits (RVAAP-49) Ravenna Army Ammunition Plant, Ravenna, Ohio, January 2007
|
Jan. 19, 2007 |
Final Focused Feasibility Study for the Remediation of Soils at LLs 1-4, RVAAP May 2005
Final Phase II Remedial Investigation at the Upper and Lower Cobbs Pond (AOC 29) September 2005
Final Report Interim Removal Action at Load Line 11 (AOC-44) March 2004
Final Remedial Investigation at Load Line 11 (AOC-44) September 2005
Final Report for Remedial Design/Removal Action at Paris-Windham Road Dump (AOC-51) at RVAAP March 2004
Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004
|
Nov. 8, 2006 |
Ravanna Army Ammunition Plant Director's Final Findings and Orders
Final Facility-Wide Groundwater Monitoring Program Plan For The Ravenna Army Ammunition Plant Ravenna, Ohio. September 2004
|
Oct. 31, 2006 |
Revised Final Feasibility Study for Ramsdell Quarry Landfill (RVAAP-01), Ravenna Army Ammunition Plant, Ravenna, Ohio, October 2006
|
Sept. 29, 2006 |
Final Addendum to the Phase II Remedial Investigation Report for Erie Burning Grounds (RVAAP-02) Ravenna Army Ammunition Plant Ravenna, Ohio. September 2006
|
Sept. 15, 2006 |
Revised Final Report On The Biological Field-Truthing Effort At Winklepeck Burning Grounds At Ravenna Army Ammunition Plant, Ravenna, Ohio. August 2006
|
Sept. 13, 2006 |
Final Addendum to the Phase II Remedial Investigation Report for Open Demolition Area #2 (RVAAP-04) Ravenna Army Ammunition Plant Ravenna, Ohio. September 2006.
|
July 21, 2006 |
Final Feasibility Study for Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant Ravenna, Ohio July 2006
|
July 17, 2006
|
|
April 7, 2006 |
Final Phase II Remedial Investigation Report for the Open Demolition Area #2 (RVAAP-04) at the Ravenna Army Ammunition Plant Ravenna, Ohio September 2005
|
April 4, 2006 |
Final Facility-Wide Biological and Water Quality Study 2003 Ravenna Army Ammunition Plant November 2005
Final Phase II Remedial Investigation Supplemental Report for Load Line 12 (Rvaap-12) at the Ravenna Army Ammunition Plant, Ravenna, Ohio November 2005
Final Phase I/Phase II Remedial Investigation of the Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant Ravenna, Ohio November 2005
Final Phase I Remedial Investigation Report for Ramsdell Quarry Landfill at the Ravenna Army Ammunition Plant, Ravenna, Ohio September 2005
Final Phase II Remedial Investigation Report for Erie Burning Grounds (Rvaap-02) at the Ravenna Army Ammunition Plant, Ravenna, Ohio September 2005
Final Remedial Investigation Report for the Central Burn Pits (Rvaap-49) at the Ravenna Army Ammunition Plant Ravenna, Ohio September 20, 2005
|
|