October 1, 2024

Final Pre-Excavation Analytical Data Summary and Excavation Plan for Remedial Action RVAAP-063-R-01 for Group 8 Munitions Response Site, June 27, 2024

September 27, 2024

Final Remedial Design Remedial Action at RVAAP-06 C Block Quarry, September 6, 2024

Final Remedial Design Remedial Action at RVAAP-50 Atlas Scrap Yard, September 4, 2024

Final Uniform Federal Policy - Quality Assurance Project Plan for the CC RVAAP-69 Building 1048 Fire Station Vapor Intrusion Study of Building 1037, June 7, 2024

September 6, 2024

Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2024, August 20, 2024

Final Removal Action Work Plan at CC RVAAP-70 East Classification Yard, August 14, 2024

Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2023 Sampling Event, July 19, 2024

August 1, 2024

Final Remedial Investigation Addendum for CC RVAAP-79 DLA Ore Storage Sites, Ore Storage Pond Sub-Area

June 28, 2024

The Ravenna Army Ammunition Plant and the Ohio Environmental Protection Agency Correspondences for CY2023, January 1, 2023 

May 1, 2024

Final Remedial Investigation Post-Blow-In Place Munitions Constituent Soil Sampling Memo for RVAAP-004-R-01 Open Demolition Area #2, March 4, 2024 

March 29, 2024

Final 2023 Annual Land Use Control Monitoring Report, RVAAP-01 RQL, RVAAP-04 ODA #2, RVAAP-05 WBG, RVAAP-08 through RVAAP-12 Load Lines 1-4 and 12, and RVAAP-51 DAPWR, February 22, 2024

Final Uniform Federal Policy - Quality Assurance Project Plan for Additional Remedial Design Sampling at Multiple Areas of Concern, February 13, 2024

Final Uniform Federal Policy - Quality Assurance Project Plan for Additional Delineation Sampling at RVAAP-34 Sand Creek Disposal Road Landfill, February 13, 2024

March 1, 2024

Final 2023 Annual Land Use Control Monitoring Report, RVAAP-01 RQL, RVAAP-04 ODA #2, RVAAP-05 WBG, RVAAP-08 through RVAAP-12 Load Lines 1-4 and 12, and RVAAP-51 DAPWR, February 22, 2024

January 30, 2024

Correspondence - Army National Guard - RVAAP Restoration Program - DFFO Monthly Summary Report - September 2022, October 6, 2022

Correspondence - Army National Guard - RVAAP Restoration Program - DFFO Monthly Summary Report - August 2022, September 7, 2022

Memorandum for Record, Summary of Findings, Magnetometer-Assisted Survey of Sand Creek conducted on 8-12 January 2024 as related to the Time Critical Removal Action for Open Demolition Area #2, January 22, 2024

December 22, 2023

Final Remedial Investigation Quality Assurance Project Plan, RVAAP-004-R-01 Open Demolition Area #2, Mar. 1, 2023

The Ravenna Army Ammunition Plant and the Ohio Environmental Protection Agency Correspondences for CY2022, January 1, 2022

Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Feb. 26, 2019

December 7, 2023

Public Meeting: Proposed Plan for RVAAP-03 Open Demolition Area #1, January 19, 2021, Jan. 19, 2021

Public Meeting: Proposed Plan for CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, September 22, 2020, Sept. 22, 2020

Public Meeting: Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry; Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, August 26, 2020, Aug. 26, 2020

Public Meeting Memorandum for RVAAP-063-R-01 Group 8 Munitions Response Site, March 11, 2020, March 11, 2020

Public Meeting: Proposed Plan for Sediment and Surface Water at Six Areas of Concern/Munitions Response Sites, August 29, 2019, Aug. 29, 2019

Public Meeting: Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-19, Landfill North Of Winklepeck Burning Grounds, RVAAP-38, NACA Test Area, and RVAAP-46, Buildings F-15 and F-16, Aug. 15, 2019

Public Meeting: Proposed Plan for Soil, Sediment, and Surface Water at RVAAP Load Lines 1, 2, 3, 4, and 12, June 20, 2019, June 20, 2019

Public Meeting: RVAAP-001-R-01 Ramsdell Quarry Area 2 (South), RVAAP-060-R-01 Block D Igloo, RVAAP-002-R-01 Erie Burning Grounds Munitions Response Sites, March 6, 2019, Apr. 1, 2019

Public Meeting: RVAAP-032-R-01 40MM Firing Range and RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Sites, November 1, 2018, March 26, 2019

Public Meeting: Proposed Plans for RVAAP-12 Load Line 12, RVAAP-40 Load Line 7, RVAAP-42 Load Line 9, RVAAP-29 Upper and Lower Cobbs Ponds and RVAAP-45 Wet Storage Area, June 21, 2018

Public Meeting: CC RVAAP-73 Facility-Wide Coal Storage and CC RVAAP-76 Depot Area, February 28, 2018, Feb. 28, 2018

Public Meeting: RVAAP-050-R-01 Atlas Scrap Yard; RVAAP-061-R-01 Block D Igloo TD; RVAAP-019-R-01 Landfill North of Winklepeck Burning Grounds; RVAAP-001-R-02 Ramsdell Quarry Landfill Area 1 (North) Munitions Response Sites, December 12, 2017 , Dec. 12, 2017

Public Meeting:RVAAP-39 Load Line 5; RVAAP-33 Load Line 6; RVAAP-41 Load Line 8; RVAAP-44 Load Line 11, June 27, 2017, June 27, 2017

Public Meeting: Proposed Plans for Soil, Sediment and Surface Water for RVAAP-43 Load Line 10, CC RVAAP-68 Electric Substations (East, West, No. 3) and RVAAP-51 Dump Along Paris-Windham Road, November 29, 2016, Nov. 29, 2016

November 30, 2023

Final Action Memorandum Time-Critical Removal Action RVAAP-004-R-01 Open Demolition Area #2, October 30, 2015

Final Action Memorandum for RVAAP-67 Facility-wide Sewers: Load Line 2 Functional Area and CC RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, September 21, 2017 

Final Action Memorandum: RVAAP-34 Sand Creek Disposal Road Landfill, September 1, 2019  

Final Action Memorandum: RVAAP-28 Suspected Mustard Agent Burial Site at Camp Ravenna Joint Military Training Center, July 27, 2017

Final Action Memorandum for RVAAP-49 Central Burn Pits at Ravenna Army Ammunition Plant, June 20, 2007

Final Action Memorandum for CC RVAAP-70 East Classification Yard Revision 1.0, June 17, 2021

Final Action Memorandum CC RVAAP-78 Quarry Pond Surface Dump, March 5, 2020 

Final Action Memorandum for a Removal Action at Paris-Windham Road Dumpsite RVAAP-51, January 6, 2003

Final Action Memorandum for a Removal Action at Sand Creek Dumpsite RVAAP-34, January 6, 2003 

October 31, 2023

Final Uniform Federal Policy Quality Assurance Project Plan for Remedial Action Work Plan for RVAAP-063-R-01 Group 8 Munitions Response Site 

FY2023 Ravenna Army Ammunition Plant Army Cleanup Program Installation Action Plan

September 29, 2023

Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2022 Sampling Event

Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2022

August 31, 2023

Final Uniform Federal Policy Quality Assurance Project Plan for Remedial Action Work Plan for RVAAP-063-R-01 Group 8 Munitions Response Site

Final Remedial Investigation Addendum for CC RVAAP-79 DLA Ore Storage Sites, Ore Storage Pond Sub-Area

July 21, 2023

Final Uniform Federal Policy Quality Assurance Project Plan for Remedial Action Work Plan for RVAAP-063-R-01 Group 8 Munitions Response Site

The Ravenna Army Ammunition Plant and the Ohio Environmental Protection Agency Correspondences for CY2021

June 29, 2023

Final Uniform Federal Policy Quality Assurance Project Plan for Remedial Action RVAAP-060-R-01 Block D Igloo Munitions Response Site

Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Annual Report for 2021

Final Remedial Investigation Report Facility-wide Groundwater Monitoring Program Groundwater Investigation and Reporting Services, Volumes 1 and 2

 

May 31, 2023

Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2022 Sampling Event, May 11, 2023

Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Annual Report for 2022, May 3, 2023

Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2023, May 3, 2023

 

May 1, 2023

Final Remedial Investigation for CC RVAAP-69 Building 1048 Fire Station, Feb. 14, 2023

March 31, 2023

Final 2022 Annual Land Use Control Monitoring Report, RVAAP-01 RQL, RVAAP-04 ODA #2, RVAAP-05 WBG, RVAAP-08 through RVAAP-12 Load Lines 1-4 and 12, and RVAAP-51 DAPWR, March 27, 2023

Final Uniform Federal Policy Quality Assurance Project Plan for Remedial Action RVAAP-060-R-01 Block D Igloo Munitions Response Site, Feb. 8, 2023

Feb. 27, 2023

Final Revised Property Management Plan for the Designated Areas of Concern and Munitions Response Sites, Version 4.1, Feb. 1, 2023

Jan. 26, 2023

Revised Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, June 10, 2022

Memorandum for Record, Summary of Findings, Magnetometer-Assisted Survey of Sand Creek conducted on 31 May to 4 June 2022 as related to the Time Critical Removal Action for Open Demolition Area #2, June 4, 2022

Dec. 28, 2022

Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Annual Report for 2021, Sept. 21, 2022

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Version 2.0 , Jul. 27, 2022

Nov. 30, 2022

Final Feasibility Study Monitoring Well Installation Plan for RVAAP-66 Facility-wide Groundwater, Nov. 17, 2022

Final Remedial Action Completion Report for Soil, Sediment, and Surface Water At Multiple Areas of Concern, Nov. 1, 2022

FY2022 Ravenna Army Ammunition Plant Army Cleanup Program Installation Action Plan, Oct. 1, 2022

Final Third Five-Year Review Report, Aug. 10, 2022

Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2022, April 28, 2022

Mar. 29, 2022

Revised Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, Jun. 10, 2022

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Mar. 1, 2022

Final 2021 Annual Land Use Control Monitoring Report, RVAAP-01 RQL, RVAAP-04 ODA #2, RVAAP-05 WBG, RVAAP-08 through RVAAP-12 Load Lines 1-4 and 12, and RVAAP-51 DAPWR, Mar. 1, 2022

Final Remedial Investigation Report Facility-wide Groundwater Monitoring Program Groundwater Investigation and Reporting Services, Feb. 11, 2022

Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2021 Sampling Event, Jan. 12, 2022

Nov. 30, 2021

Final Remedial Action Completion Report for Load Lines 1, 2, 3, 4, and 12 (RVAAP-08 to 12), Oct. 29, 2021

Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Annual Report for 2020, July 21, 2021

Oct. 28, 2021

Final Record of Decision for RVAAP-03 Open Demolition Area #1, Apr. 19, 2021

Final Record of Decision CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Mar. 25, 2021

Sept. 29, 2021 FY2021 Ravenna Army Ammunition Plant Army Cleanup Program Installation Action Plan, Sept. 1, 2021 
Aug. 31, 2021

Final Revised Property Management Plan for the Designated Areas of Concern and Munitions Response Sites, Version 4.0, June 1, 2021

Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2021, May 21, 2021

Final Record of Decision for RVAAP-03 Open Demolition Area #1, Apr. 19, 2021

Final Remedial Action Completion Report Non Time-Critical Removal Action for CC RVAAP-78 Quarry Pond Surface Dump, Apr. 13, 2021

Final Record of Decision CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Mar. 25, 2021

Aug. 2, 2021

Memorandum for Record, Summary of Findings, Magnetometer-Assisted Survey of Sand Creek conducted on 7-13 June 2020 as related to the Time Critical Removal Action for Open Demolition Area #2, June 30, 2021

Final Remedial Action Completion Report for Non Time Critical Removal Action for RVAAP-67 Facility-Wide Sewers and CC RVAAP-75 George Road Sewage Treatment Plant, April 30, 2021

June 29, 2021 Final Revised Property Management Plan for the Designated Areas of Concern and Munitions Response Sites, Version 4.0, June 1, 2021
May 28, 2021

Final 2020 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 through RVAAP-11 Load Lines 1 through 4, RVAAP-12 Load Line 12, and RVAAP-51 Dump Along Paris-Windham Road, May 26, 2021

Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2021, May 21, 2021

Final After Action Report Surface Clearance for MEC RVAAP-060R-01 Block D Igloo Munitions Response Site, May 19, 2021

Final Remedial Action Completion Report for Non Time Critical Removal Action for RVAAP-67 Facility-Wide Sewers and CC RVAAP-75 George Road Sewage Treatment Plant, Apr. 30, 2021

Final Remedial Action Completion Report Non Time-Critical Removal Action for CC RVAAP-78 Quarry Pond Surface Dump, Apr. 13, 2021

Final Non Time-Critical Removal Action Work Plan for RVAAP-34 Sand Creek Disposal Road Landfill, Apr. 9, 2021

Final Work Plan Addendum Additional Sampling for CC RVAAP-79 DLA Ore Storage Sites Remedial Investigation, Ore Storage Pond Sub-Area, Mar. 22, 2021

Final Remedial Design for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Mar. 19, 2021

Final Remedial Design for Soil, Sediment and Surface Water at RVAAP-42 Load Line 9, Mar. 17, 2021

Apr. 30, 2021

Final Record of Decision for RVAAP-03 Open Demolition Area #1, Apr. 19, 2021

Final Non Time-Critical Removal Action Work Plan for RVAAP-34 Sand Creek Disposal Road Landfill, Apr. 9, 2021

Final Remedial Design for Soil, Sediment, and Surface Water at CC RVAAP-76 Depot Area, Mar, 19, 2021

Final Remedial Design for Soil, Sediment, and Surface Water at RVAAP-38 NACA Test Area, Mar. 19, 2021

Final Remedial Design for Soil, Sediment and Surface Water at RVAAP-42 Load Line 9, Mar. 17, 2021

Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2019 Sampling Event, Jan. 24, 2020

Mar. 30, 2021

Final Record of Decision CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Mar. 25, 2021

Final Work Plan Addendum Additional Sampling for CC RVAAP-79 DLA Ore Storage Sites Remedial Investigation, Ore Storage Pond Sub-Area, Mar. 22, 2021

Final Remedial Design for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Mar. 19, 2021

Final Remedial Design for Soil, Sediment, and Surface Water at RVAAP-38 NACA Test Area, Mar. 19, 2021

Final Remedial Design for Soil, Sediment, and Surface Water at CC RVAAP-76 Depot Are, Mar. 19, 2021

Final Remedial Design for Soil, Sediment and Surface Water at RVAAP-42 Load Line 9, Mar. 17, 2021

Final Facility-wide Groundwater Monitoring Report Program Plan RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2020 Sampling Event, Mar. 10, 2021

Final 2021 Community Relations Plan, Mar. 9, 2021

Final 2019 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 through RVAAP-11 Load Lines 1 through 4, RVAAP-12 Load Line 12, and RVAAP-51 Dump Along Paris - Windham Road, May 20, 2020

Feb. 26, 2021

Final Engineering Evaluation/Cost Analysis for CC RVAAP-70 East Classification Yard, Jan. 28, 2021

Final Remedial Investigation for CC RVAAP-79 DLA Ore Storage Sites, Volumes One and Two, Oct. 16, 2020

Jan. 28, 2021

Final Record of Decision for RVAAP-063-R-01 Group 8 Munitions Response Site, Version 1.0, Dec. 31, 2020

FY2020 Ravenna Army Ammunition Plant Army Cleanup Program Installation Action Plan, Sept. 30, 2020

Dec. 29, 2020

Final Proposed Plan for RVAAP-03 Open Demolition Area #1, Revision 2.0, Dec. 7, 2020

Submission Format Guidelines for the Ravenna Army Ammunition Plant Restoration Program, Version 22, Nov. 17, 2020

Nov. 24, 2020 Final Proposed Plan for RVAAP-03 Open Demolition Area #1, Revision 1.0, Oct. 29, 2020
Oct. 30, 2020

Final Remedial Investigation for CC RVAAP-79 DLA Ore Storage Sites, Volumes One and Two, Oct. 16, 2020

Final Record of Decision for RVAAP-063-R-01 Group 8 Munitions Response Site, Version 1.0,Sept. 25, 2020

Final Remedial Design Work Plan for RVAAP Load Lines 1, 2, 3, 4, and 12 (RVAAP-08 to 12), Sept. 21, 2020

Final RVAAP-66 Facility-wide Groundwater Monitoring Program Production Well Abandonment Report Groundwater Investigation and Reporting Services , Aug. 6, 2020

Sept. 10, 2020 Final Proposed Plan for CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Revision 1.0, Aug. 21, 2020
Aug. 31, 2020

Final Facility-wide Groundwater Monitoring Program Production Well Abandonment Report Groundwater Investigation and Reporting Services RVAAP-66 Facility-wide Groundwater, Aug. 6, 2020

Final Facility-wide Groundwater Monitoring Program, RVAAP-66 Facility-wide Groundwater Annual Report for 2019, Groundwater Investigation and Reporting Services, June 12, 2020

Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Addendum for 2020, June 12, 2020

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-19 Landfill North of Winklepeck Burning Grounds, Feb. 18, 2020

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-46 Buildings F-15 and F-16, Feb. 12, 2020

Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2019 Sampling Event, Jan. 24, 2020

June 29, 2020

Final Munitions and Explosives of Concern Verification Study After Action Report for the RVAAP-03 Open Demolition Area #1, June 24, 2020

Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Addendum for 2020, June 12, 2020

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, June 4, 2020

Final Record of Decision for Sediment and Surface Water at Six Areas of Concern/Munitions Response Sites, June 4, 2020

Final 2019 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 through RVAAP-11 Load Lines 1 through 4, RVAAP-12 Load Line 12, and RVAAP-51 Dump Along Paris-Windham Road, May 20, 2020

Final Revised Property Management Plan for the Designated Areas of Concern and Munitions Response Sites, Version 3.0, Apr. 30, 2020

Final Work Plan Non-Time Critical Removal Action for CC RVAAP-78 Quarry Pond Surface Dump, Apr. 28, 2020

Apr. 29, 2020 Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Mar. 25, 2020
Mar 31, 2020

Final Proposed Plan for CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Mar. 11, 2020

Final Community Relations Plan 2020, Feb. 27, 2020

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-19 Landfill North of Winklepeck Burning Grounds, Feb. 18, 2020

Final Feasibility Study for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, Sept. 23, 2019

Feb. 28, 2020

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-46 Buildings F-15 and F-16, Feb. 12, 2020

Final Proposed Plan for RVAAP-063-R-01 Group 8 Munitions Response Site, Version 2.0, Jan. 30, 2020

Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Semi-Annual Report for Spring 2019 Sampling Event, Jan. 24, 2020

Jan 30, 2020

Final Record of Decision Amendment for Soil, Sediment, and Surface Water at RVAAP Load Lines 1, 2, 3, 4, and 12, Dec. 23, 2019

Dec. 23, 2019

Final Ravenna Army Ammunition Plant Army Cleanup Program FY2018 Installation Action Plan, Dec. 10, 2019

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-38 NACA Test Area, Dec. 5, 2019

Final Proposed Plan for RVAAP-063-R-01 Group 8 Munitions Response Site, Version 1.0, Dec.4, 2019

Nov. 27, 2019

Final Time Critical Removal Action Report RVAAP-004-R-01 Open Demolition Area #2, Nov. 25, 2019

Final No Further Action Record of Decision for RVAAP-001-R-01 Ramsdell Quarry Area 2 (South) Munitions Response Site, Version 1.0, Aug. 19, 2019

Final Facility-wide Groundwater Monitoring Program RVAAP-66 Facility-wide Groundwater Annual Report for 2018, Aug. 15, 2019

Final Record of Decision for RVAAP-060-R-01 Block D Igloo Munitions Response Site, Version 1.0, Aug. 5, 2019

Final No Further Action Record of Decision for RVAAP-002-R-01 Erie Burning Grounds Munitions Response Site, Version 1.0, July 16, 2019

Revised Final Remedial Investigation for RVAAP-34 Sand Creek Disposal Road Landfill, Feb. 13, 2017

Final No Further Action Record of Decision for RVAAP-034-R-01 Sand Creek Dump Munitions Response Site, Version 1.0, Sept. 29, 2015

Final No Further Action Record of Decision for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Version 1.0, Sept. 29, 2015

Final No Further Action Record of Decision for RVAAP-033-R-01 Firestone Test Facility Munitions Response Site, Aug. 14, 2015

Oct. 31, 2019

Final Remedial Investigation CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Volumes 1 and 2, Oct. 3, 2019

First and Second Update and Progress Report for the Remedial Investigation at CC RVAAP-69 Building 1048 Fire Station, June 10, 2019

Final No Further Action Record of Decision for RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Site, Version 1.0, June 3, 2019

Final No Further Action Record of Decision for RVAAP-032-R-01 40mm Firing Range Munitions Response Site, Version 1.0, May 10, 2019

Final Proposed Plan for RVAAP-060-R-01 Block D Igloo Munitions Response Site, Version 1.0, Dec. 19, 2018

Final Site Inspection Report for RVAAP-28 Suspected Mustard Agent Burial Site, Version 1.0, Apr. 27, 2015

Sept. 26, 2019

Final Engineering Evaluation/Cost Analysis: CC RVAAP-78 Quarry Pond Surface Dump at Former Ravenna Army Ammunition Plant, Sept. 19, 2019

Final Work Plan Addendum MEC Verification Study at RVAAP-03 Open Demolition Area #1, Sept. 3, 2019

Final No Further Action Proposed Plan for RVAAP-001-R-01 Ramsdell Quarry Landfill Munitions Response Site Area 2 (South), Version 1.0, Jan. 4, 2019

Final No Further Action Proposed Plan for RVAAP-002-R-01 Erie Burning Grounds Munitions Response Site, Version 1.0, Dec. 19, 2018

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Calendar Year 2008, Jan. 1, 2008

Aug. 29, 2019

Final No Further Action Record of Decision for RVAAP-001-R-01 Ramsdell Quarry Area 2 (South) Munitions Response Site, Version 1.0, Aug. 19, 2019

Final Background Study for Metals for RVAAP-66 Facility-Wide Groundwater, Aug. 6, 2019

Final Record of Decision for RVAAP-060-R-01 Block D Igloo Munitions Response Site, Version 1.0, Aug. 5, 2019

Final Feasibility Study for RVAAP-063-R-01 Group 8 MRS, Version 1.0, July 19, 2019

Final No Further Action Record of Decision for RVAAP-002-R-01 Erie Burning Grounds Munitions Response Site, Version 1.0, July 16, 2019

Final Proposed Plan for Sediment and Surface Water at Six Areas of Concern and Munitions Response Sites, May 10, 2019

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Calendar Year 2012, Jan. 1, 2012

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Calendar Year 2011, Jan. 1, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Calendar Year 2010, Jan. 1, 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Calendar Year 2009, Jan. 1, 2009

Final Sampling and Analysis Plan Addendum No. 3 for the Biological Measurements at RVAAP-05 Winklepeck Burning Grounds, May 6, 2002

Final Groundwater Assessment Plan for RVAAP-01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant, Sept. 7, 2001

Final Report of Closure Activities Building W-221 and X-232 at Ravenna Army Ammunition Plant, June 30, 2000

July 31, 2019

Final Record of Decision for Wet Sediment and Surface Water at RVAAP-12 Load Line 12, Feb. 22, 2019

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Feb. 22, 2019

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-29 Upper and Lower Cobbs Ponds, Feb. 22, 2019

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-42 Load Line 9, Feb. 22, 2019

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-40 Load Line 7, Feb. 22, 2019

Final Action Memorandum for RVAAP-67 Facility-wide Sewers: Load Line 2 Functional Area and CC RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, Sept. 21, 2017

June 27, 2019

Final No Further Action Record of Decision for RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Site, Version 1.0, June 3, 2019

Final 2018 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 - 11 Load Lines 1-4, and RVAAP-12 Load Line 12, May 24, 2019

Final Proposed Plan for Sediment and Surface Water at Six Areas of Concern and Munitions Response Sites, May 10, 2019

Final Facility-wide Groundwater Monitoring Program Plan RVAAP-66 Facility-wide Groundwater Addendum for 2019, May 3, 2019

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-19 Landfill North of Winklepeck Burning Grounds, Apr. 4, 2019

Final Solid Waste Management Plan, Evaluation, Identification, and Management of Potential Solid Waste Sites, Mar. 26, 2019

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP Load Lines 1,2,3,4, and 12, Oct. 26, 2018

Final Remedial Action Work Plan for RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, July 25, 2008

Final Explosives Safety Submission OE/UXO Locating, Removal and Disposal at RVAAP-03 Open Demolition Area #1 at Ravenna Army Ammunition Plant, Sept 1, 2000

May 29, 2019

Final No Further Action Record of Decision for RVAAP-032-R-01 40mm Firing Range Munitions Response Site, Version 1.0, May 10, 2019

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-46 Buildings F-15 and F-16, Apr. 1, 2019

Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Feb. 26, 2019

Final Record of Decision CC RVAAP-76 Depot Area, Jan. 8, 2019

Final Record of Decision CC RVAAP-73 Facility-Wide Coal Storage, Nov. 26, 2018

Apr. 30, 2019

Final Work Plan Non Time-Critical Removal Action for RVAAP-67 Facility-Wide Sewers and CC RVAAP-75 George Road Sewage Treatment Plant, Ravenna Army Ammunition Plant Restoration Program, Apr. 11, 2019

Final Solid Waste Management Plan, Evaluation, Identification, and Management of Potential Solid Waste Sites, Mar. 26, 2019

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-38 NACA Test Area, Mar. 22, 2019

Final 2017 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 -11 Load Lines 1-4 and RVAAP-12 Load Line 12, Feb. 28, 2019

Apr. 9, 2019

Final 2019 Community Relations Plan, Ravenna Army Ammunition Plant Restoration Program, Portage and Trumbull Counties, Ohio. Mar. 15, 2019

Final 2017 Annual Land Use Control Monitoring Report, RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 -11 Load Lines 1-4 and RVAAP-12 Load Line 12, Feb. 28, 2019

Final Remedial Design for Soil at RVAAP-51 Dump Along Paris-Windham Road, Feb. 27, 2019

Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-06 C Block Quarry, Feb. 26, 2019

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Feb. 22, 2019

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-42 Load Line 9, Feb. 22, 2019

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-40 Load Line 7, Feb. 22, 2019

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-29 Upper and Lower Cobbs Ponds, Feb. 22, 2019

Final Record of Decision for Wet Sediment and Surface Water at RVAAP-12 Load Line 12, Feb. 22, 2019

Final No Further Action Record of Decision for RVAAP-001-R-02 Ramsdell Quarry Landfill Munitions Response Site Area 1 (North), Version 2.0, Jan. 14, 2019

Final No Further Action Record of Decision for RVAAP-019-R-01 Landfill North of Winklepeck Munitions Response Site, Version 2.0, Jan. 14, 2019

Final Site Inspection Report: CC RVAAP-80 Group 2 Propellant Can Tops, May 10, 2017

Final No Further Action Record of Decision for RVAAP-008-R-01 Load Line #1A Munitions Response Site, Aug. 14, 2015

Feb. 28, 2019

Final Engineering Evaluation/Cost Analysis: RVAAP-34 Sand Creek Disposal Road Landfill at Camp James A. Garfield Joint Military Training Center, Jan. 14, 2019

Final No Further Action Proposed Plan for RVAAP-001-R-01 Ramsdell Quarry Landfill Munitions Response Site Area 2 (South), Version 1, Jan. 4, 2019

Final Facility-Wide Groundwater Monitoring Addendum for 2018, June 21, 2018

Jan.30, 2019

Final Engineering Evaluation/Cost Analysis: RVAAP-34 Sand Creek Disposal Road Landfill at Camp James A. Garfield Joint Military Training Center, Jan. 14, 2019

Technical Memorandum for the Abandonment of Groundwater Monitoring Well FWGmw-017 for RVAAP-66 Facility-wide Groundwater Monitoring Program, Dec. 20, 2018

Final No Further Action Proposed Plan for RVAAP-002-R-01 Erie Burning Grounds Munitions Response Site, Version 1.0, Dec. 19, 2018

Final Proposed Plan for RVAAP-060-R-01 Block D Igloo Munitions Response Site, Version 1.0, Dec. 19, 2018

Final Phase II Remedial Investigation Report and Feasibility Study for Soil, Sediment, and Surface Water at RVAAP-38 NACA Test Area, July 16, 2018

Dec. 21, 2018

Revised Technical Memorandum for the First 2018 Semi-Annual RVAAP-66 Facility-Wide Groundwater June 2018 Sampling Event, Dec. 10, 2018

Final Site Inspection Report for CC RVAAP-70 East Classification Yard, Oct. 31, 2018

Nov. 29, 2018

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP Load Lines 1,2,3,4, and 12, Oct 26, 2018

Oct. 30, 2018

Final Site Inspection Addendum for CC RVAAP-78 Quarry Pond Surface Dump, Sept. 28, 2018

Final No Further Action Proposed Plan for RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Site, Sept. 18, 2018

Final No Further Action Proposed Plan for RVAAP-032-R-01 40mm Firing Range Munitions Response Site, Sept. 17, 2018

Final No Further Action Record of Decision for RVAAP-050-R-01 Atlas Scrap Yard Munitions Response Site, Sept. 5, 2018

Sept 27, 2018

Final No Further Action Proposed Plan for RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Site, Sept. 18, 2018

Final No Further Action Proposed Plan for RVAAP-032-R-01 40mm Firing Range Munitions Response Site, Sept. 17, 2018

Final No Further Action Record of Decision for RVAAP-061-R-01 Block D Igloo - TD Munitions Response Site, Version 1.0, Sept. 14, 2018

Final No Further Action Record of Decision for RVAAP-001-R-02 Ramsdell Quarry Landfill Munitions Response Site Area 1 (North), Version 1.0, Sept. 13, 2018

Final No Further Action Record of Decision for RVAAP-050-R-01 Atlas Scrap Yard Munitions Response Site, Sept. 5, 2018

Final No Further Action Record of Decision for RVAAP-019-R-01 Landfill North of Winklepeck Munitions Response Site, Version 1.0, Sept. 4, 2018

Final Feasibility Study for RVAAP-002-R-01 Erie Burning Grounds MRS, Version 1.0, Aug. 17, 2018

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2017, July 27, 2018

Final FY 2017 Fourth Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, May 21, 2018

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-51 Dump Along Paris-Windham Road, Sept. 15, 2017

August 30, 2018

Final Feasibility Study for RVAAP-002-R-01 Erie Burning Grounds MRS, Version 1.0, Aug 17, 2018

Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-46 Buildings F-15 and F-16, Apr 5, 2018

Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-19 Landfill North of Winklepeck Burning Grounds, Apr 25, 2018

Final Feasibility Study for RVAAP-060-R-01 Block D Igloo MRS, Version 1.0, Apr 23, 2018

July 30, 2018

Final Revised Property Management Plan for the Designated Areas of Concern and Munitions Response Sites, Version 2.0, Mar. 30, 2018

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-44 Load Line 11 (signed), Feb, 15, 2018

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-41 Load Line 8 (signed), Jan. 25, 2018

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-33 Load Line 6 (signed), Jan. 25, 2018

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-39 Load Line 5 (signed), Dec. 22, 2017

Final Construction Completion Report FY16 Recycling of Materials at RVAAP-50 Atlas Scrap Yard Area of Concern and Setup of Temporary Storage Facility, Aug. 17, 2017

Final Construction Work Plan for FY16 Recycling of Materials at RVAAP-50 Atlas Scrap Yard Area of Concern and Setup of Temporary Storage Facility, Dec. 20, 2016

June 28, 2018

Final No Further Action Record of Decision for RVAAP-050-R-01 Atlas Scrap Yard Munitions Response Site, Jun 1, 2018

Final FY 2017 Fourth Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, May 21, 2018

Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-19 Landfill North of Winklepeck Burning Grounds, Apr 25, 2018

Final Feasibility Study for RVAAP-060-R-01 Block D Igloo MRS, Version 1.0, Apr. 23, 2018

Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-46 Buildings F-15 and F-16, Apr 5, 2018

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Semi-Annual Report for April and July 2017 Sampling Events, Mar 23, 2018

Final Remedial Action Completion Report for the Soil Removal Remedy at RVAAP-05 Winklepeck Burning Grounds, Feb 16, 2018

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-44 Load Line 11, Feb. 15, 2018

Final Proposed Plan CC RVAAP-73 Facility-Wide Coal Storage, Feb. 1, 2018

Final Proposed Plan CC RVAAP-76 Depot Area, Feb. 1, 2018

Final Feasibility Study for RVAAP-001-R-01 Ramsdell Quarry Landfill MRS Area 2 (South), Version 1.0, Jan. 17, 2018

Final Feasibility Study for RVAAP-016-R-01 Fuze and Booster Quarry MRS, Version 1.0, Jan.6, 2018

Final Feasibility Study for RVAAP-032-R-01 40mm Firing Range MRS, Version 1.0, Jan. 5, 2018

Final Work Plan Additional Sampling for CC RVAAP-69 Building 1048 Fire Station, CC RVAAP-70 East Classification Yard, and CC RVAAP-74 Building 1034 Motor Pool Hydraulic Lift, Nov 30, 2017

Final Supplemental Remedial Investigation for Sediment and Surface Water at RVAAP-01, RVAAP-04, RVAAP-16, RVAAP-001-R-01, Nov 29, 2017

Final Project Management Plan for the Completion of RI, FS, PP, and ROD Documents, Multiple Areas of Concern, Former Ravenna Army Ammunition Plant Restoration Program, Revision 1, Nov. 10, 2017

Final Sampling and Analysis Plan Addendum for Supplemental Sampling at RVAAP-38 NACA Test Area, Oct. 20, 2017

Final Completion Report for the Sand Creek Culvert Replacement and Rocket Ridge Slope Stabilization at RVAAP-004-R-01 Open Demolition Area #2, Oct 20, 2017

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-51 Dump Along Paris-Windham Road, Sep 15, 2017

Final Visual Assessment Survey Report Evaluation, Identification, and Management of Potential Solid Waste Sites, Aug. 29, 2017

Final Phase III Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-29 Upper and Lower Cobbs Ponds, Aug 10, 2017

Final No Further Action Proposed Plan for RVAAP-019-R-01 Landfill North of Winklepeck Munitions Response Site, Aug 2, 2017

Final No Further Action Proposed Plan for RVAAP-061-R-01 Block D Igloo - TD Munitions Response Site, Jul 31, 2017

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2016, May 22, 2017

June 05, 2018

Revised Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-40 Load Line 7, Mar. 16, 2018

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Feb. 21, 2018

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-29 Upper and Lower Cobbs Ponds, Jan. 12, 2018

Final Proposed Plan for Wet Sediment and Surface Water at RVAAP-12 Load Line 12, Nov. 9, 2017

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-42 Load Line 9, Mar. 31, 2017 

Aug. 23, 2017

Revised Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard Version 2.0, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Aug. 4, 2017

Final No Further Action Proposed Plan for RVAAP-050-R-01 Atlas Scrap Yard Munitions Response Site, Aug. 3, 2017

Final No Further Action Proposed Plan for RVAAP-019-R-01 Landfill North of Winklepeck Munitions Response Site, Aug. 2, 2017

Final No Further Action Proposed Plan for RVAAP-001-R-02 Ramsdell Quarry Landfill Area 1(North) Munitions Response Site, Aug. 1, 2017

Final No Further Action Proposed Plan for RVAAP-061-R-01 Block D Igloo - TD Munitions Response Site, July 31, 2017

Final FY 2017 Third Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, June 27, 2017

Final Feasibility Study Addendum for Soil, Sediment, and Surface Water at RVAAP Load Lines 1, 2, 3, 4, and 12. Volumes 1 & 2, June 21, 2017

July 28, 2017

Final Second Five-Year Review Report for Load Lines 1 - 4, Load Line 12, Winklepeck Burning Grounds, and Ramsdell Quarry Landfill, June 30, 2017

Final FY 2017 Third Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, June 27, 2017

Final Remedial Investigation CC RVAAP-73 Facility-Wide Coal Storage, Feb. 17, 2017

June 29, 2017

Final Record of Decision for Soil, Sediment, and Surface Water at CC RVAAP-68 Electric Substations (East, West, No. 3), Apr. 6, 2017

Historical Solid Waste Management Plan for RVAAP-01 Ramsdell Quarry Landfill and RVAAP-05 Winklepeck Burning Grounds, January 1979, Jan 1, 1979

Historical Landfill Operation for RVAAP-01 Ramsdell Quarry Landfill, August 4, 1978

May 30, 2017

Final Site Inspection Report: CC RVAAP-80 Group 2 Propellant Can Tops, May 10, 2017

Final Facility-Wide Groundwater Monitoring Addendum for 2017, Apr. 27, 2017

Final FY 2017 Second Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Apr. 12, 2017

Final Record of Decision for Soil, Sediment, and Surface Water at CC RVAAP-68 Electric Substations (East, West, No. 3), Apr. 6, 2017

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-43 Load Line 10, Mar. 10, 2017

RVAAP- 34 Sand Creek Disposal Road Landfill Clean-Up Project Weekly Reports, August - October 2003, Oct. 10, 2003

Apr. 28, 2017

Final FY 2017 Second Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Apr. 12, 2017

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-42 Load Line 9, Mar. 31, 2017

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-40 Load Line 7, Mar. 22, 2017

Revised Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-33 Load Line 6, Mar. 17, 2017

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-43 Load Line 10, Mar. 10, 2017

Final Phase III Remedial Investigation Report for Wet Sediment and Surface Water at RVAAP-12 Load Line 12, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Feb. 16, 2017

Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Are, Feb. 10, 2017

Ravenna Army Ammunition Plant 23-26 November and 7-11 March 2011, 26-27 April 2011 Field Evaluation of Selected Decommissioned Munitions Storage Igloos, June 1, 2011

Historical Archives - NACA Research Memorandum, Facilities and Methods Used in Full-Scale Airplane Crash-Fire Investigation, Mar. 10, 1952

Mar. 29, 2017

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-33 Load Line 6, Mar. 17, 2017

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-44 Load Line 11, Mar. 17, 2017

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-41 Load Line 8, Mar. 17, 2017

Final Community Relations Plan 2017, Mar. 16, 2017

Final Engineering Evaluation/Cost Analysis for RVAAP-67 Facility-wide Sewers: Load Line 2 Functional Area and CC RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, Mar. 10, 2017

Final FY 2017 First Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Mar. 6, 2017 

Final 2016 Annual Land Use Control Monitoring Report RVAAP-01 Ramsdell Quarry Landfill and RVAAP-05 Winklepeck Burning Grounds, Feb. 15, 2017

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Semi-Annual Report for May 2016 Sampling Event, Jan. 3, 2017

Revised Final Remedial Investigation Work Plan for Groundwater and Environmental Investigation Services for RVAAP-66 Facility-wide Groundwater, Volumes 1, 2, and 3, Dec. 21, 2016

Feb. 28, 2017

Final Phase III Remedial Investigation Report for Wet Sediment and Surface Water at RVAAP-12 Load Line 12, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Feb. 16, 2017

Final 2016 Annual Land Use Control Monitoring Report RVAAP-01 Ramsdell Quarry Landfill and RVAAP-05 Winklepeck Burning Grounds, Feb. 15, 2017

Revised Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Feb, 13, 2017

Revised Final Remedial Investigation Report for RVAAP-34 Sand Creek Disposal Road Landfill, Feb, 13, 2017

Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-45 Wet Storage Area, Feb. 10, 2017

Feb. 13, 2017 Final Remedial Investigation Study for Soil, Surface Water, and Sediment at RVAAP-03 Open Demolition Area #1, Jan. 12, 2017 
Jan. 30, 2017

FY2016 Ravenna Army Ammunition Plant, Army Defense Environmental Restoration Program Installation Action Plan, Public, Jan 17, 2017

Final Remedial Investigation/Feasibility Study CC-RVAAP-76 Depot Area, Nov. 22, 2016

Final Interim Removal Action Historical Well Abandonment Completion Report, March 11, 2016

Dec. 23, 2016

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-39 Load Line 5, Dec. 6, 2016

Final Remedial Investigation Report for RVAAP-34 Sand Creek Disposal Road Landfill, Nov. 29, 2016

Final Remedial Investigation/Feasibility Study CC-RVAAP-76 Depot Area, Nov. 22, 2016

Final Remedial Investigation Work Plan for Sediment and Surface Water at RVAAP-01, RVAAP-04, RVAAP-16, RVAAP-001-R-01, and Inventory of Sediment and Surface Water at Multiple Sites, Aug. 12, 2016

Final Site Inspection CC-RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, Jan 29, 2016

Nov. 29, 2016

Final FY 2016 Fourth Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Sept. 29, 2016

Final Engineering Evaluation/Cost Analysis RVAAP-28 Suspected Mustard Agent Burial Site at Camp Ravenna Joint Military Training Center, Sept. 19, 2016

Final Phase II Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-44 Load Line 11, Aug. 12, 2016

Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-40 Load Line 7, July 27, 2016

Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP- 41 Load Line 8, July 20, 2016

Final Phase II Remedial Investigation Report and Feasibility Study for Soil, Sediment, and Surface Water at RVAAP-42 Load Line 9, June 16, 2016

Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-39 Load Line 5, June 16, 2016

Final Phase II Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-33 Load Line 6, June 9, 2016

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2015, May 6, 2016

Nov. 10, 2016

Final Proposed Plan for Soil, Sediment, and Surface Water at CC RVAAP-68 Electric Substations (East, West, No. 3), Sept. 30, 2016 

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-51 Dump Along Paris-Windham Road, Sept. 29, 2016

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-43 Load Line 10, Aug. 18, 2016

Oct. 28, 2016

Final Proposed Plan for Soil, Sediment, and Surface Water at CC RVAAP-68 Electric Substations (East, West, No. 3), Sept. 30, 2016

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-51 Dump Along Paris-Windham Road, Sept. 29. 2016

Final Basis of Design and Work Plan Sand Creek Culvert Replacement at the Open Demolition Area #2 Crossing RVAAP-004-R-01 Open Demolition Area #2 MRS Military Munitions Response, Sept. 16, 2016

Sept 28, 2016

Final FY 2016 Third Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Aug. 26, 2016

Final Site Inspection Compliance Restoration Site CC RVAAP-78 Quarry Pond Surface Dump, Aug 5, 2016

Final Site Inspection CC-RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, Jan. 29, 2016

Aug 26, 2016

Final Site Safety and Health Plan Evaluation, Identification, and Management of Solid Waste Disposal Site, Aug. 17, 2016

Final Site Inspection (Phase I Remedial Investigation) Compliance Restoration Site CC RVAAP-78 Quarry Pond Surface Dump, Aug. 5. 2016

Final Remedial Design Supplement Soil Removal Action At RVAAP-05 Winklepeck Burning Grounds, June 30, 2016

Final FY 2016 Second Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Apr. 19, 2016

Final FY 2016 First Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Apr. 4, 2016

Final Work Plan for a Pilot Study and Feasibility Study at RVAAP-50 Atlas Scrap Yard, Feb. 19, 2016

Final Remedial Investigation CC RVAAP-68 Electric Substations (East, West, No. 3), July 31, 2015

Final Property Management Plan for the Designated Areas of Concerns and Munitions Response Sites, Volume One - Version 1.0, Aug. 1, 2012

July 28, 2016

Final Community Relations Plan 2016 for the Ravenna Army Ammunition Plant Restoration Program, June 29, 2016

Final Work Plan Evaluation, Identification, and Management of Potential Solid Waste Disposal Sites, May 6, 2016

Revised Final Accident Prevention Plan (Addendum) for Site Inspection at Compliance Restoration Site CC RVAAP-80 Group 2 Propellant Can Tops, Jan. 7, 2016

June 21, 2016

Final Well Abandonment Work Plan for RVAAP-66 Facility-wide Groundwater, May 3, 2016

Final PBA13 Sample and Analysis Plan Addendum for Surface Water and Sediment at Load Lines 1, 2, 3, and 4, Apr. 8, 2016

Final Slope Stabilization Plan for the Rocket Ridge Area in RVAAP-004-R-01 Open Demolition Area #2 MRS, Apr. 7, 2016 

Final Remedial Design for the Post-ROD Changes to the Remedy at RVAAP-05 Winklepeck Burning Grounds, Former Ravenna Army Ammunition Plant/Camp Ravenna, Portage and Trumbull Counties, Ohio, Aug. 27, 2015

Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-43 Load Line 10, June 26, 2015

May 27, 2016

Final Work Plan Time-Critical Removal Action RVAAP-004-R-01 Open Demolition Area #2, Mar. 18, 2016

Final Remedial Investigation Report for Soil, Sediment, and Surface Water at RVAAP-50 Atlas Scrap Yard, Former Ravenna Army Ammunition Plant, Ravenna, Ohio, June 26, 2015

Apr. 27, 2016

Final Site Inspection CC-RVAAP-75 George Road Sewage Treatment Plant Mercury Spill, Jan. 29, 2016

Revised Final Project Work Plan for Site Inspection at Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops, Revision 0, Jan 7, 2016

Mar. 30, 2016

FY2015 Ravenna Army Ammunition Plant, Army Defense Environmental Restoration Program Installation Action Plan, Public, Mar 22, 2016

Final 2015 Annual Land Use Control Monitoring Report RVAAP-01 Ramsdell Quarry Landfill and RVAAP-05 Winklepeck Burning Grounds, Jan 27, 2016 

Final Sampling and Analysis Plan Addendum for the Remedial Investigation of Load Line 6, Sept 19, 2003

Final Sampling and Analysis Plan Addendum for the Remedial Investigation of RVAAP-42 Load Line 9 at Ravenna Army Ammunition Plant, Sept 19, 2003

Feb. 25, 2016

Final 2015 Annual Land Use Control Monitoring Report RVAAP-01 Ramsdell Quarry Landfill and RVAAP-05 Winklepeck Burning Grounds, Jan 27, 2016

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the July 2015 Sampling Event, Jan 13, 2016 

Final No Further Action Record of Decision for RVAAP-034-R-01 Sand Creek Dump Munitions Response Site, Version 1.0, Sept 29, 2015

Final No Further Action Record of Decision for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Version 1.0, Sept 29, 2015

Final No Further Action Record of Decision for RVAAP-033-R-01 Firestone Test Facility Munitions Response Site, Aug 14, 2015

Final No Further Action Record of Decision for RVAAP-008-R-01 Load Line #1A Munitions Response Site, Aug 14, 2015

Jan. 27, 2016

Final FY 2015 Fourth Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Dec.18, 2015

Final Site Characterization and Focused Feasibility Study for the RVAAP- 51 Dump Along Paris-Windham Road, Revision 1, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Dec. 15, 2015

Revised Final Work Plan Munitions Response for Demolition of Load Lines 5, 7, and Building 1039, Transite Removal at Building T-1604, Removal of Most Remaining Concrete and Miscellaneous Debris at Load Lines 6, 9, and 11, Nov. 21, 2006

Dec. 17, 2015

Submission Format Guidelines for the Ravenna Army Ammunition Plant, Version 21, Dec. 11, 2015

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the March 2015 Sampling Event, Volumes 1 and 2, Sept. 21, 2015

Nov. 23, 2015

Final FY 2015 Third Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Oct. 30, 2015

Final Action Memorandum Time-Critical Removal Action RVAAP-004-R-01 Open Demolition Area #2, Oct 30, 2015

Oct. 28, 2015

Final FY2013/2015 Annual Sand Creek Stream Monitoring within RVAAP-004-R-01 Open Demolition Area #2 MRS for the Rocket Ridge Project Letter Reports, Oct. 7, 2015 

Final Remedial Investigation Report for RVAAP-016-R-01 Fuze and Booster Quarry Munitions Response Site, Version 1.0, June 5, 2015

Final Work Plan for Process Equipment Disassembly, Decontamination and Disposal at RVAAP- 09 Load Line 2 and RVAAP- 10 Load Line 3 at Ravenna Army Ammunition Plant, Aug. 1, 2002

Sept. 28, 2015

Final Remedial Investigation Report for RVAAP-001-R-01 Ramsdell Quarry Landfill Munitions Response Site, Version 1.0, Jan. 27, 2015

Final Military Munitions Response Program Historical Records Review at Ravenna Army Ammunition Plant (revised), Jan. 22, 2007

Aug. 28, 2015

Final FY 2015 Second Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds , July 23, 2015

Final Interim Removal Action Work Plan for Historical Well Abandonment Activities, July 21, 2015

Final Site Inspection CC RVAAP-72 Facility-Wide Underground Storage Tanks, July 8, 2015

Final Site Inspection Report CC RVAAP-83 Former Buildings 1031 and 1039, Revision 0, June 15, 2015

Final No Further Action Proposed Plan for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Version 1.0, May 28, 2015

Final No Further Action Proposed Plan for RVAAP-034-R-01 Sand Creek Dump Munitions Response Site, Version 1.0, May 28, 2015

Final Remedial Investigation Report for RVAAP-063-R-01 Group 8 MRS, Version 1.0, May 19, 2015

Final Construction Field Plans for the Remediation of Soils at RVAAP- 08 Load Line 1, RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Nov 15, 2006

Final Project Plans of the Structural Analyses and MEC Support for RVAAP- 08, 09, 10 and 11 Load Lines 1-4 at Ravenna Army Ammunition Plant, Nov 3, 2006

Final Phase III Remedial Investigation Report for the RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Mar. 2, 2005

Final Supplemental Baseline Human Health Risk Assessment for RVAAP- 08 Load Line 1 Alternative Receptors at Ravenna Army Ammunition Plant, July 1, 2004

Final Project Management Plan for the Remediation of Soils at RVAAP- 08, 09,10 and 11 Load Lines 1-4 at Ravenna Army Ammunition Plant, Apr 1, 2004

July 29, 2015

Final Technical Memorandum Summary of the Findings of Historical Review and Risk Evaluation of the Storage Magazines for the Former Ravenna Army Ammunition Plant, Ravenna Ohio and Appendix A - Supporting Information Paper, June 30, 2015

Final Remedial Action Report for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200, May 14, 2015

Final Remedial Action Report for Soil, Sediment, and Surface Water at RVAAP-48 Anchor Test Area, Apr. 16, 2015

Final Site Inspection for the Military Munitions Response Program at Ravenna Army Ammunition Plant, May 13, 2008

Final Work Plan for the Military Munitions Response Program, Munitions Response Sites Site Inspection at Ravenna Army Ammunition Plant, Sept. 12, 2007

Final Work Plan for Explosive Evaluation of Sewers at Ravenna Army Ammunition Plant, Dec 14, 2006

June 30, 2015 Final Remedial Action Report for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200, May 14, 2015 
June 19, 2015

Final Remedial Investigation Report for RVAAP-032-R-01 40mm Firing Range Munitions Response Site, Apr 30, 2015

Final Site Inspection Report for RVAAP-28 Suspected Mustard Agent Burial Site, Version 1.0, Apr 27, 2015

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the October 2014 Sampling Event, Mar 30, 2015

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2014, Mar. 20, 2015

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the July 2014 Sampling Event, Mar 13, 2015

Final Remedial Investigation Report for RVAAP-019-R-01 Landfill North of Winklepeck and RVAAP-060-R-01 Block D Igloo Munitions Response Sites, Version 1.0, Mar 4, 2015

June 3, 2015

Final No Further Action Proposed Plan for RVAAP-034-R-01 Sand Creek Dump Munitions Response Site, Version 1.0, May 28, 2015

Final No Further Action Proposed Plan for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Version 1.0, May 28, 2015

May 28, 2015

Final No Further Action Proposed Plan for RVAAP-008-R-01 Load Line #1A Munitions Response Site, Version 1.0, May 6, 2015

Final No Further Action Proposed Plan for RVAAP-033-R-01 Firestone Test Facility Munitions Response Site, Version 1.0, May 6, 2015

Apr. 22, 2015

Final FY 2015 First Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Apr 3, 2015

Final Memorandum for the Record - Recommended Path Forward RVAAP-004-R-01 Open Demolition Area #2 MRS, Mar 26, 2015

Final Explanation of Significant Differences for Post-ROD Changes to the Remedy at RVAAP-05 Winklepeck Burning Grounds, Mar 26, 2015

Final Remedial Investigation Report for RVAAP-034-R-01 Sand Creek Dump MRS, Version 1.0, Mar 24, 2015

Final Remedial Investigation Report for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Mar 10, 2015

Field Change Notice in Support of the Environmental Remediation Services Project at CC RVAAP-69 Building 1048 Fire Station of the Former Ravenna Army Ammunition Plant, Mar 4, 2015

Final Remedial Investigation Report for RVAAP-004-R-01 Open Demolition Area #2 Munitions Response Site, Version 1.0, Volumes 1 and 2, Feb 27, 2015

Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Semiannual Groundwater Monitoring Addendum for 2015, Feb 20, 2015

Final Site Inspection CC RVAAP-71 Barn No. 5 Petroleum Release, Feb 12, 2015

Proposed Background Well Justification Summary for the RVAAP-66 Facility-Wide Groundwater Monitoring Program Remedial Investigation/Feasibility Study Work Plan at the Ravenna Army Ammunition Plant, Oct 10, 2013

Final Site Safety and Health Plan for Asbestos Abatement at RVAAP- 41 Load Line 8 and RVAAP- 43 Load Line 10 at Ravenna Army Ammunition Plant, May 19, 2006

 

Mar. 25, 2015

Final Remedial Investigation Report for RVAAP-034-R-01 Sand Creek Dump MRS, Version 1.0, Mar 24, 2015

Final Site Inspection CC-RVAAP-77 Building 1037 Laundry Waste Water Sump, Revision 0, Mar 18, 2015

Final Remedial Investigation Report for RVAAP-062-R-01 Water Works #4 Dump Munitions Response Site, Mar 10, 2015

Final Site Inspection CC RVAAP-71 Barn No. 5 Petroleum Release, Feb 12, 2015

Final Remedial Design for Soil and Dry Sediment at the RVAAP-01 Ramsdell Quarry Landfill, Apr 9, 2014

Final First Installation-Wide Five-Year Review Report for RVAAP-01 Ramsdell Quarry Landfill, RVAAP-05 Winklepeck Burning Grounds, RVAAP-08 Load Line 1, RVAAP-09 Load Line 2, RVAAP-10 Load Line 3, RVAAP-11 Load Line 4, and RVAAP-12 Load Line 12, Aug 31, 2012

Final Remedial Design for the RVAAP-16 Fuze and Booster Quarry Landfill/Ponds, June 26, 2009

Mar. 9, 2015

Proposed Background Well Justification Summary for the RVAAP-66 Facility-Wide Groundwater Monitoring Program Remedial Investigation/Feasibility Study Work Plan at the Ravenna Army Ammunition Plant, Oct. 10 2013

Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Additional Well Installation Addendum, Sept. 4, 2013

Feb. 26, 2015

Engineering Survey Report #6 for Buildings at RVAAP-09 Load Line 2, March 27, 2003

Feb. 19, 2015

Final Community Relations Plan for the Ravenna Army Ammunition Plant Restoration Program in Portage and Trumbull Counties, Ohio, Feb 4, 2015

Final Remedial Action Report for Soil and Dry Sediment at the RVAAP-01 Ramsdell Quarry Landfill, Jan 30, 2015

FY2014 Ravenna Army Ammunition Plant Installation Action Plan, Public, Jan 21, 2015

Final Project Completion Report for the DLA Storage Area Reclamation-Route 80 Tank Farm and East Ore Yard Culvert Replacement at Ravenna Army Ammunition Plant, Nov 28, 2007

Jan 21, 2015

Final FY 2014 Annual Report for the Quarterly Land Use Control Inspections at RVAAP-05 Winklepeck Burning Grounds, Jan. 8, 2015

Final Removal Action Report for Environmental Remediation Services at Ravenna Army Ammunition Plant (RVAAP), Dec. 22, 2014

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the May 2014 Sampling Event, Dec 4, 2014

Final Remedial Investigation Report for RVAAP-002-R-01 Erie Burning Grounds Munitions Response Site, Version 1.0, Aug. 27, 2014

Final Remedial Investigation Report for RVAAP-033-R-01 Firestone Test Facility MRS, Version 1.0, Aug. 26, 2014

Final Remedial Investigation Report for RVAAP-050-R-01 Atlas Scrap Yard MRS, Version 2.0, Aug. 25, 2014

Dec 22, 2014

Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of RVAAP-08 Load Line 1 Initial Groundwater Monitoring, Aug. 12, 1999

Final Closure Activities Work Plan for RVAAP-07 Building 1601 Hazardous Waste Storage, Revision 2 at Ravenna Army Ammunition Plant Aug. 19, 1998

Nov. 24, 2014

Historical Archives - Specifications Index For Ravenna Ordnance Plant, CY1940-1942, Dec. 3, 1940

Oct. 23, 2014

Final (Revised) Phase I Remedial Investigation May 2004 Follow-On Groundwater Sampling at RVAAP- 01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant, Mar. 17, 2005

Hazardous and Medical Waste Study No. 37-EF-5360-97 Relative Risk Site Evaluation, Ravenna Army Ammunition Plant, Ravenna, Ohio, 28 October - 1 November 1996, Volume 2, Oct. 28, 1996

Hazardous and Medical Waste Study No. 37-EF-5360-97 Relative Risk Site Evaluation, Ravenna Army Ammunition Plant, Ravenna, Ohio, 28 October - 1 November 1996, Volume 1, Oct. 28, 1996

Oct. 14, 2014

Final FY 2014 Fourth Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Oct. 10, 2014

Final FY 2014 Third Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, Oct. 8, 2014

Final Site Characterization and Focused Feasibility Study for the RVAAP- 51 Dump Along Paris-Windham Road, Former Ravenna Army Ammunition Plant, Portage and Trumbull Counties, Ohio, Sept. 22, 2014

Final Remedial Investigation for RVAAP-008-R-01 Load Line #1A MRS, Version 2.0, Aug. 28, 2014

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the January 2014 Sampling Event, Aug. 5, 2014

Final Work Plan for the Geophysical Investigation of the RVAAP-28 Suspected Mustard Agent Burial Site, Nov, 15, 2007

Final Accident Prevention Plan Disposal of Contaminated Soil at RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Sept. 29, 2006

Final Work Plan for the Disposal of Contaminated Soil at RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Sept. 29, 2006

Final Geotechnical Laboratory Results for the Phase II Remedial Investigations for RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 at Ravenna Army Ammunition Plant, Apr. 17, 2003

Sept. 25, 2014

Final Remedial Design for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200 and RVAAP-48 Anchor Test Area, Aug. 22, 2014

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200, Mar 18, 2014

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-48 Anchor Test Area, Mar 18, 2014

Final Facility-wide Groundwater Monitoring Program Report on the October 2012 Sampling Event, May 23, 2013

Final Facility-Wide Groundwater Monitoring Program Report on the July 2012 Sampling Event, Volumes 1 - 2, May 23, 2013

Aug 22, 2014

Final Community Relations Plan for the Ravenna Army Ammunition Plant Restoration Program in Portage and Trumbull Counties, Ohio, Aug 1, 2014

Final Administrative Closure for the 90 Day Hazardous Waste Storage Area At Building CB-13b in RVAAP- 08 Load Line 1 at Ravenna Army Ammunition Plant, Nov 11, 2002

Final Work Plan and Sampling and Analysis Plan Addenda for the Phase II Remedial Investigation of RVAAP- 04 Open Demolition Area #2 at Ravenna Army Ammunition Plant, June 26, 2002

Final Installation Action Plan Ravenna Army Ammunition Plant - FY 2001, Jan 8, 2001

Final Sampling and Analysis Plan Addendum No. 2 and the Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of RVAAP-08 Load Line 1 at Ravenna Army Ammunition Plant, Sep 6, 2000

Final Report of Closure Activities Open Burning Ground Facility at Ravenna Army Ammunition Plant , Feb 8, 1999

Final Closure Activities Work Plan Open Burning Ground Facility, Revision 2, Ravenna Army Ammunition Plant, Aug 20, 1998

Final Revised Closure Plan for the Open Burning Ground (OBG) Hazardous Waste Treatment Unit at Ravenna Army Ammunition Plant, Oct. 31, 1997

Revised Installation Restoration Program Management Plan, FY96, Dec. 6, 1996

July 24, 2014

Final FY 2014 Second Quarter Land Use Control Inspection RVAAP-05 Winklepeck Burning Grounds, July 22, 2014

Final FY 2014 First Quarter Land Use Control Inspection, RVAAP-05 Winklepeck Burning Grounds, July 18, 2014

Final FY 2013 Annual Report for the Quarterly Land Use Control Inspections at RVAAP-05 Winklepeck Burning Grounds, July 16, 2014

Final Storm Water Pollution Prevention Plan for the Remediation of Sub-Slab Soils at RVAAP- 08 Load Line 1, RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, Mar. 16, 2010

Final Propellant Removal Summary Report for MEC Support for RVAAP- 08 Load Line 1, Jan 24, 2008

Letter Report for the Sampling of Potential Disposal Areas at RVAAP-08 Load Line 1 and RVAAP-09 Load Line 2, Jan 14, 2000

June 10, 2014

Final Construction Completion Report for Closure for Clean Hard-Fill Sites RVAAP-08 Site CB-23 and Site CB-22 on Load Line 1 and George Rd., Feb 15, 2014 

May 7, 2014

Final Remedial Design for Soil and Dry Sediment at the RVAAP-01 Ramsdell Quarry Landfill, Apr. 9, 2014

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200, Mar. 18, 2014

Final Record of Decision for Soil, Sediment, and Surface Water at RVAAP-48 Anchor Test Area, Mar. 18, 2014

Final Remedial Investigation Report for RVAAP-050-R-01 Atlas Scrap Yard MRS, Version 1.0, Mar. 12, 2014

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2013, Mar. 6, 2014

Final Project Work Plan for Site Inspection at Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops, Revision 1, Mar. 6, 2014

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the August 2013 Sampling Event, Mar. 5, 2014

Final Characterization Sampling Report of Surface and Subsurface Incremental Sampling Methodology at RVAAP-8, 09, 10, 11 and 12 Load Lines 1, 2, 3, 4, and 12, Mar. 29, 2013

Apr. 23, 2014

Final Remedial Investigation for RVAAP-008-R-01 Load Line #1 MRS, Mar. 12, 2014

Mar. 27, 2014 Final Technical Memorandum for Land Uses and Facility-Wide Cleanup Goals, Feb. 4, 2014 
Mar. 07, 2014 Accident Prevention Plan Addendum for Asbestos Abatement for Military Munitions Response Program Remedial Investigation Environmental Service, July 9, 2013 
Feb. 25, 2014 Final Phase III Remedial Investigation Report of RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Mar. 1, 2005
Jan. 23, 2014

Final Closure Plan for the RVAAP- 17 Deactivation Furnace Area (DFA) Hazardous Waste Treatment Unit at Ravenna Army Ammunition Plant, Feb. 23, 2001

Health Risk Assessment No. 39-26-L138-91 for the Deactivation Furnace RCRA Closure Activity, Ravenna Army Ammunition Plant, Ravenna, Ohio, September 26, 1991 

Environmental Assessment for Closure of RVAAP-17 Deactivation Furnace at Ravenna Army Ammunition Plant, Apr. 19, 1990

Dec. 16, 2013 Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Annual Report for 2012, Revision 1.0, Oct. 31, 2013
Nov. 6, 2013 FY2013 Ravenna Army Ammunition Plant Installation Action Plan, Public, Nov. 5, 2013
Oct. 22, 2013 Final Facility-Wide Groundwater Monitoring RVAAP-66 Facility-Wide Groundwater Program Report on the January 2013 Sampling Event, Volumes 1 and 2, Sept 24, 2013
Sept. 30, 2013 Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Quality Assurance Surveillance Plan, Apr. 19, 2012
Sept. 16, 2013

Final Technical Memorandum for Land Uses and Facility-Wide Cleanup Goals, Sept. 6, 2013

Aug. 26, 2013

Final Risk Assessment Assumptions Document (RAAD) Addendum to the Work Plan for the Additional Evaluation of the RVAAP-05 Winklepeck Burning Grounds, July 24, 2013

Final Site Inspection and Remedial Investigation Work Plan Addendum at Compliance Restoration Sites CC RVAAP-71 Barn No. 5 Petroleum Release and CC RVAAP-83 Former Buildings 1031 and 1039, Revision 1, June 7, 2013

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-48 Anchor Test Area, May 28, 2013

Final Proposed Plan for Soil, Sediment and Surface Water at RVAAP-13 Building 1200, Apr. 9, 2013

Community Relations Plan for the Ravenna Army Ammunition Plant, Sept 1, 2003

June 18, 2013

Final Proposed Plan for Soil, Sediment, and Surface Water at RVAAP-48 Anchor Test Area, May 28, 2013

Final Record of Decision Amendment for Soil and Dry Sediment for the RVAAP-01 Ramsdell Quarry Landfill, May 24, 2013

Final Project Work Plan for Site Inspection at Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops, May 15, 2013

May 8, 2013

Final Former Water Production Wells and Oil and Gas Wells Survey at Ravenna Army Ammunition Plant and Camp Ravenna, Apr. 17, 2013

Final Project Management Plan for Site Inspection at Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops, Apr. 17, 2013

Final Accident Prevention Plan for Site Inspection at Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops. Apr. 17, 2013

Mar. 29, 2013 Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Monitoring Well Installation Report, Dec 18, 2012
Mar. 21, 2013

FY2012 Ravenna Army Ammunition Plant Installation Action Plan, Public, Feb. 5, 2013

Feb. 28, 2013

Final Results of Groundwater Sampling for Major Cations and Anions, Trace Elements, Nutrients, Organic Chemicals, and Isotopes of Hydrogen and Oxygen at RVAAP-66 Facility-Wide Groundwater, April 2011, Jan. 4, 2013

Dec 21, 2012

Final Work Plan for Additional Evaluation of the RVAAP-05 Winklepeck Burning Grounds, Oct. 29, 2012

Nov 29, 2012

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the April 2012 Sampling Event, Oct. 24, 2012

Final Site Inspections and Remedial Investigations Work Plan at Compliance Restoration Sites, Oct 3, 2012

Final Property Management Plan for the Designated Areas of Concerns and Munitions Response Sites, Volume One - Version 1.0, Aug. 1, 2012

Final Facility Wide Groundwater Monitoring Program Annual Report for 2006 at Ravenna Army Ammunition Plant, May 31, 2007

Final Facility Wide Groundwater Monitoring Program Report on the July 2006 Sampling Event at Ravenna Army Ammunition Plant - Main Report and Appendices A-C, Mar. 9, 2007

Final Facility Wide Groundwater Monitoring Program Report on the March 2006 Sampling Event at Ravenna Army Ammunition Plant, Aug. 31, 2006

Oct 22, 2012

Operations and Maintenance Removal of the Sand Creek Barrier RVAAP-004-R-01 Open Demolition Area #2 MRS, August 22, 2012

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #12, August 21, 2012

Final Environmental Baseline Summary Report, Ravenna Training and Logistics Site, Portage and Trumbull Counties, Ohio, Feb 1, 2000

Sept 28, 2012

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Report on the January 2012 Sampling Event, July 18, 2012

Sept 27, 2012 Final Facility-Wide Groundwater Monitoring Program Report of the July 2007 Sampling Event at Ravenna Army Ammunition Plant, Volume 1and 2, Mar. 27, 2008
Aug 30, 2012

Final Removal Action Report for the 2nd Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, Version 1.0, Volumes 1 & 2, July 31, 2012

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #11, July 24, 2012

Final Project Completion Report for Disposal of Drums from RVAAP-004-R-01 Open Demolition Area #2 MRS Containing White Phosphorus, Apr. 27, 2012

Aug 02, 2012 Final Results for Intitial Assessment of CC-RVAAP-79 DLA Group 2 Ammunition Storage Area, Apr 19, 2012
June 29, 2012

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #10, June 14, 2012

Revised Final Modified Proposed Plan for Soil and Dry Sediment at RVAAP-01 Ramsdell Quarry Landfill, June 6, 2012

Operations and Maintenance Quarterly Effectiveness Evaluation Report #3 for the Sand Creek Barrier, May 30, 2012

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #9, May 30, 2012

Final Facility-Wide Groundwater Monitoring Program Report on the October 2011 Sampling Event, Volumes 1 & 2, May 10, 2012

Final Historical Records Review Report for CC-RVAAP-71 Barn No. 5 Petroleum Release and CC-RVAAP-83 Former Buildings 1031 and 1039, 2011 PBA Environmental Investigation and Remediation at 14 Compliance Restoration Sites, Revision 0, May 9, 2012

NPDES General NPDES Permit No. OHR000004 and Facility Permit No. 3GR00112*DG for Stormwater, CY2011, Dec. 15, 2011

NPDES General NPDES Permit No. OHR000004 and Facility Permit No. 3GR00112*DG for Stormwater, CY2006, July 13, 2012

May 30, 2012

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 7, July 1943

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 6, June 1943

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 5, May 1943

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 4, April 1943

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 3, March 1943

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 11, November 1942

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 10, October 1942 (Volume, Number, and Date were Misprinted)

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 9, September 1942

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 8, August 1942

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 7, July 1942

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 6, June 1942

May 29, 2012

Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Accident Prevention Plan, Ravenna Army Ammunition Plant, May 14, 2012

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #8, April 26, 2012

Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1971, Jan. 1, 1971

Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1970, Jan. 1, 1970

Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1969, Jan. 15,1969

Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1963, Jan. 1, 1963

Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1962, Jan. 2, 1962

Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1961, Jan. 1, 1961

Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1960, Jan. 1, 1960

Historical Archives - Ravenna Arsenal News, Ravenna, Ohio, Newsletters for CY 1959, Jan. 1, 1959

Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1958, March 1, 1958

Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1957, Feb. 1, 1957

Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1956, Jan. 1, 1956

Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1955, Feb. 1,1955

Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1954, Jan. 1, 1954

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 4, April 1942

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 3, March 1942

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 1, January 1942

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 1, Number 6, December 1941

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 1, Number 5, November 1941

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 1, Number 4, October 1941

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 1, Number 3, September 1941

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 1, Number 2, August 1941

Apr. 30, 2012

Final Modified Proposed Plan for Soil and Dry Sediment at RVAAP-01 Ramsdell Quarry Landfill, Apr 10, 2012.

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #7, March 29, 2012.

Final (Revised) Position Paper for the Application and Use of Facility-Wide Human Health Cleanup Goals at the Ravenna Army Ammunition Plant, Feb. 23, 2012

Final Project Management Plan for 2011 PBA Environmental Investigation and Remediation at 14 Compliance Restoration Sites, Jan 27, 2012.

Apr. 02, 2012

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #6, February 27, 2012

Operations and Maintenance Quarterly Effectiveness Evaluation Report #1 for the Sand Creek Barrier, February 23, 2012, Feb. 23, 2012

Operations and Maintenance Quarterly Effectiveness Evaluation Report #2 for the Sand Creek Barrier, February 27, 2012, Feb. 23, 2012

Final Facility-Wide Groundwater Monitoring Program Annual Report for 2011, Ravenna Army Ammunition Plant, Ravenna, Ohio, Feb. 23, 2012

Final Historical Records Review Report for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), Revision 0, Dec. 22, 2011

Final Facility-Wide Groundwater Monitoring Program Annual Report for 2007, Mar. 24, 2008

Final Supplemental Human Health Risk Assessment for Revised Range Maintenance Soldier at the Former RVAAP-05 Winklepeck Burning Grounds, May 5, 2006

Mar. 30, 2012

Submission Format Guidelines for the Ravenna Army Ammunition Plant, Version 20, Mar. 23, 2012

Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at RVAAP-13 Building 1200, Mar. 22, 2012

Final Facility-Wide Groundwater Monitoring Program Report on the July 2011 Sampling Event, Volumes 1 & 2, Feb 22, 2012

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Addendum, Jan 6, 2012

Feb. 28, 2012

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #5, January 31, 2012

Final Investigation Report for the Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops and Other Environmental Services, Jan. 27, 2012

United States Environmental Protection Agency Soil Screening Guidance: User's Guide, Second Edition, July 1996

Final Ohio Environmental Protection Agency Technical Guidance Manual for Hydrogeologic Investigations and Ground Water Monitoring, February 1995 (Updated 2012), Feb. 1, 1995

Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1953, Jan. 7, 1953

Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1952, Jan 4, 1952

Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1951, Aug. 3, 1951

Historical Archives - Ravenna Arsenal News, Apco, Ohio, Newsletters for CY 1946, July 19, 1946

Jan. 30, 2012

Final Facility-Wide Groundwater Monitoring Program Plan RVAAP-66 Facility-Wide Groundwater Semiannual Monitoring Addendum, Ravenna Army Ammunition Plant, Ravenna, Ohio, Jan 23, 2012

Final Remedial Investigation/Feasibility Study Report for Soil, Sediment, and Surface Water at the RVAAP- 48 Anchor Test Area, Ravenna Army Ammunition Plant, Ravenna, Ohio, Jan. 18, 2012

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Addendum, Jan. 06, 2012

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #4, December 19, 2011

Initial Planning for Facility-Wide Surface Water Monitoring for the Ravenna Army Ammunition Plant, Aug. 1, 2002

Dec. 29, 2011

Final Work Plan Addendum for Military Munitions Response Program Remedial Investigation Environmental Services, Version 1.0, Dec. 7, 2011

Final Facility-Wide Groundwater Monitoring Program RVAAP-66 Facility-Wide Groundwater Project Management Plan, Nov. 17, 2011

Nov. 30, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #3, November 3, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #2, October 25, 2011

Final Work Plan Addendum for 2010 Preliminary Assessment Compliance Restoration Sites CC-RVAAP-78 Quarry Pond Surface Dump, Oct. 24, 2011

Oct 24, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #1-High water event, September 28, 2011

Operations and Maintenance Quarterly Effectiveness Evaluation Report #4 for the Sand Creek Barrier, September 27, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #14, September 14, 2011

Sept 30, 2011

Final Facility-Wide Groundwater Monitoring Program Report on the April 2011 Sampling Event, Volumes 1 & 2, Sept 7, 2011

Final Engineering Evaluation for Soil and Dry Sediment at RVAAP-01 Ramsdell Quarry Landfill, Sept 2, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #13, August 30, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #12, July 27, 2011

FY2011 Ravenna Army Ammunition Plant Installation Action Plan, Public, June 28, 2011

Aug 31, 2011

Operations and Maintenance Quarterly Effectiveness Evaluation Report #3 for the Sand Creek Barrier, August 3, 2011

Final Facility-Wide Groundwater Monitoring Program Report on the January 2011 Sampling Event, Volumes 1-3, July 15, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #11, June 21, 2011

Final Work Plan for the Geochemical Evaluation of Metals in Groundwater at Ravenna Army Ammunition Plant, Mar. 25, 2010

July 26, 2011 Final Geochemical Evaluation of Metals in Groundwater at Ravenna Army Ammunition Plant, June 22, 2011
June 30, 2011

Final Data Quality Objectives Report for RVAAP- 05 Winklepeck Burning Grounds, Version 1.0, June 8, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #10, June 2, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #9, May 24, 2011

May 26, 2011 Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #8, April 26, 2011
Apr. 28, 2011

Final Historical Records Review Report for 2010 Preliminary Assessment Compliance Restoration Sites CC-RVAAP-78 Quarry Pond Surface Dump and CC-RVAAP-80 Group 2 Propellant Can Tops, Apr. 14 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #7, March 23, 2011

Operations and Maintenance Quarterly Effectiveness Evaluation Report #2 for the Sand Creek Barrier, March 23, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #6, March 9, 2011

Mar. 31, 2011

Final Facility-Wide Groundwater Monitoring Program Report on the October 2010 Sampling Event, Volume 1, Mar. 16, 2011

Final Facility-Wide Groundwater Monitoring Program Annual Report for 2010, Mar. 11, 2011

Final Remediation Completion Report Sub-Slab Soils at RVAAP- 08 Load Line 1, Mar. 10, 2011

Final Sampling Report of Surface and Subsurface Incremental Sampling Methodology at Load Lines 1, 2, 3, and 4 (RVAAP-08, 09, 10 and 11), Volumes 1 & 2, Mar. 5, 2011

Final Waste Management Plan for RVAAP-004-R-01 Open Demolition Area #2 MRS for the White Phosphorus Disposal at the Rocket Ridge Area, Volume 1, Mar. 2, 2011

Final Work Plan for the Military Munitions Response Program Remedial Investigations Environmental Services, Mar. 1, 2011

Final Project Work Plan For the Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops and other Environmental Services, Feb, 25, 2011

Final Facility-Wide Safety and Health Plan for Environmental Investigations at the Ravenna Army Ammunition Plant, 2011, Feb. 24, 2011

Final Facility-Wide Sampling and Analysis Plan for Environmental Investigations at the Ravenna Army Ammunition Plant, 2011, Feb. 24, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #5, February 17, 2011

Feb. 28, 2011

Final Facility-Wide Groundwater Monitoring Plan Report of the July 2010 Sampling Event, Volumes 1 - 3, Jan. 28, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #4, January 20, 2011

Feb. 18, 2011 Final of the Sampling and Screening Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Lines 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Sept 15, 2009
Jan. 31, 2011

Final Status Survey Report for the Ravenna Army Ammunition Plant Former West Tank Farm Area, Dec. 16, 2004

Final Report Ravenna Army Ammunition Plant, Former West Tank Farm Area, Monazite Sand Removal Project Phase IV, Project No. USA 00-005, Revision 0, Oct. 26, 2004

Amended Final Status Survey Plan, Ravenna Army Ammunition Plant, Former West Tank Farm Area, Monazite Sand Removal Project, Phase IV, Revision 1, Oct 29, 2003

Jan. 28, 2011

Final Digital Geophysical Mapping Report for the RVAAP-34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, and RVAAP- 28 Mustard Agent Burial Site, Version 1.0, Jan. 11, 2011

Operations and Maintenance Quarterly Effectiveness Evaluation Report #1 for the Sand Creek Barrier, January 10, 2011

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #3, December 16, 2010

Dec. 20, 2010

Final Project Management Plan for the Compliance Restoration Site CC-RVAAP-80 Group 2 Propellant Can Tops and Other Environmental Services, Dec. 17, 2010

Final Remediation Completion Report Sub-Slab Soils at RVAAP-09 Load Line 2, RVAAP- 10 Load Line 3 and RVAAP- 11 Load Line 4, Dec. 17, 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #2, November 23, 2010

Final Project Management Plan Performance-Based Contract for Six Environmental Areas of Concern at Ravenna Army Ammunition Plant, July 14, 2005

Dec. 08, 2010

Final Sampling and Analysis Plan Addendum for the Interim Removal Action of RVAAP- 44 Load Line 11 at Ravenna Army Ammunition Plant, Jan. 2, 2001

Final Reassessment of the Ravenna Army Ammunition Plan, Report No. 132R, Dec. 1, 1982

Final Installation Assessment for Ravenna Army Ammunition Plant, Report No. 132, Nov. 1, 1978

Nov. 30, 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #1, October 14, 2010

Final Site Safety and Health Plan Addendum for 2010 Phase I Remedial Investigation Services Compliance Restoration Sites CC-RVAAP-78 and CC-RVAAP-80, Sept. 30, 2010

Oct. 18, 2010

Final Project Management Plan for 2010 Phase I Remedial Investigation Services Compliance Restoration Sites CC-RVAAP-78 and CC-RVAAP-80, Sept. 30, 2010

Final Installation Action Plan Ravenna Army Ammunition Plant - FY 2010, Sept. 24, 2010

Final Waste Management Plan for RVAAP-004-R-01 Open Demolition Area #2 White Phosphorus Disposal at the Rocket Ridge Area, Sept 23, 2010

Final Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 08 Load Line 1 and Other Building Locations, Sept 17, 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #12, September 15, 2010

Operations and Maintenance Quarterly Effectiveness Evaluation Report #4 for the Sand Creek Barrier, September 15, 2010

Final Site Safety and Health Plan for the 2010 Phase I Remedial Investigation Service at Compliance Restoration Sites (9 Areas of Concern), Addendum No. 1, Sept. 10, 2010

Final Project Management Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), Sept 10, 2010

Final Public Involvement Plan Addendum for Military Munitions Response Program Remedial Investigation Environmental Services, Sept. 1, 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #11, August 25, 2010

Final Remedial Action Report for the RVAAP-12 Load Line 12, Aug 9, 2010

Final Site Characterization and Focused Feasibility Study Work Plan for the RVAAP- 51 Dump Along Paris-Windham Road at Ravenna Army Ammunition Plant, Aug 8. 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #10, July 28, 2010

Operations and Maintenance Quarterly Effectiveness Evaluation Report #3 for the Sand Creek Barrier, July 28, 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #9, June 30, 2010

Revised Final Remedial Design for the RVAAP- 01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant, Jun 17, 2010

Sept. 3, 2010

Final Work Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010

Final Project Management Plan for Sampling and Closure of Load Lines 1 -4, 12 (RVAAP- 08, 09, 10, 11, 12) and other Areas of Concern, July 30, 2010

Final Quality Control Plan for the Revision of the Facility-Wide Environmental Documents, July 27, 2010

Final Facility-wide Groundwater Monitoring Program Report on the January 2010 Sampling Event, July 6, 2010

Final Quality Control Plan for the 2010 Phase I Remedial Investigation Services at Compliance Restoration Sites (9 Areas of Concern), July 2, 2010

July 30, 2010

Final Facility-Wide Groundwater Monitoring Program Report on the 2009 Metals Sampling Event, Volume 1 - Main Text, Appendices A - C, June 2, 2010

Final Quality Control Plan for the Geochemical Evaluation of Metals in Groundwater, May 26, 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #8, May 2010. May 24, 2010

Operations and Maintenance Quarterly Effectiveness Evaluation Report #1 for the Sand Creek Barrier, May 2010, May 24, 2010

Final Monitoring Report for the Deep Bedrock Well Installation in the Basal Sharon Conglomerate, May 21, 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #7, April 2010, April 29, 2010

Final Geophysical Prove-out Report for Environmental Services at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, And RVAAP- 28 Mustard Agent Burial Site, Version 1.0, March 25, 2010.

June 30, 2010 Final Installation Action Plan Ravenna Army Ammunition Plant - FY 2009”  September 18, 2009
June 2, 2010

Final Public Involvement Plan Addendum for the Time Critical Removal Action at the Rocket Ridge Area, May 7, 2010

Final Project Work Plan for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, May 7, 2010

Final Project Management Plan for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, May 7, 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #6, March, 2010

April 29, 2010

Final Facility-Wide Groundwater Monitoring Program Report on the October 2009 Sampling Event, Apr. 19, 2010

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 5, May 1942

Historical Archives - Ravenna Ordnance Center Commissary Building (Bldg. 1038), APCO, Ohio, Post Card

March 29, 2010

Final Facility-Wide Human Health Cleanup Goals for Ravenna Army Ammunition Plant, Mar. 23, 2010

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 2, February 1943

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 3, Number 1, January 1943

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 12, December 1942

Historical Archives - Official Publication of the Ravenna Ordnance Plant of Ohio, Volume 2, Number 2, February 1942

Historical Archives - Ravenna Ordnance Plant Manual of Safe Practices, Jan 1941

Mar. 15, 2010

Final Remedial Action Report for the RVAAP- 16 Fuze and Booster Quarry Landfill/Ponds. Mar. 5, 2010

Final Facility-Wide Groundwater Monitoring Program Annual Report for 2009, Mar 4, 2009

Final Project Management Plan Performance-Based Acquisition for Six Environmental Areas of Concern, Revision 1, Mar. 1, 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Trip Report #5, February 2010, Feb. 18, 2010

Feb. 23, 2010 Final Sampling and Analysis Plan Addendum No. 1 for Environmental Service at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, and RVAAP- 28 Mustard Agent Burial Site, Feb. 11, 2010.
Feb. 12, 2010

Operations and Maintenance Quarterly Effectiveness Evaluation Report #1 for the Sand Creek Barrier, January 2010, Feb. 1, 2010

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #4, January 2010

Final Remedial Design for the RVAAP- 01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant, Jan. 25, 2010

Final Facility-Wide Groundwater Monitoring Program Report on the July 2009 Sampling Event, Volume 1, Jan. 25, 2010

Final PBA 2008 Supplemental Investigation Sampling and Analysis Plan Addendum No. 1 at Ravenna Army Ammunition Plant, Dec. 23, 2009

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #3, December 2009

Final Environmental Baseline Survey for the Ravenna Army Ammunition Plant, Sept. 25, 1998

Dec. 18, 2009

Final Removal Action Report for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area (RRA) within RVAAP-004-R-01 Open Demolition Area #2 MRS, Dec. 17, 2009

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #2, Nov. 24, 2009

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS), Trip Report #1, Oct. 29, 2009

Dec. 10, 2009

Final Multi-Increment Sampling and Analysis of Soils Below Floor Slabs at RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, Dec. 04, 2009

Nov. 30, 2009

Final Remedial Action Completion Report for RVAAP- 05 Winklepeck Burning Grounds Pads 61/61A, 67, and 70 at Ravenna Army Ammunition Plant, Nov 19, 2009

Final Data Quality Objectives Report for RVAAP- 03 Open Demolition Area #1 at Ravenna Army Ammunition Plant, Oct. 09, 2009

Final Construction Completion Report Time Critical Response Action for the Rocket Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program, Sep. 23, 2008

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) August 2008 – September 2009, Aug. 26, 2008

Final Revised Operations and Maintenance Plan for the Sand Creek Barrier System, the Time Critical Response Action at the Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program, Aug. 7, 2008

Final Time Critical Response Action Plan for the Rocket Ridge Area at Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program, Mar. 1, 2008

Final Work Plan for Sand Creek Survey Rocket Ridge Area of Open Demolition Area #2 (RVAAP-004-R-01 Open Demolition Area #2 MRS) Military Munitions Response Program Time Critical Response Action, Oct. 24, 2007

Nov. 18, 2009

Final Facility-Wide Groundwater Monitoring Program Report on the April 2009 Sampling Event, Volume 1, Appendices A - D, Nov 09, 2009

Final Safety, Health, and Emergency Response Plan for Environmental Services at RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1, and RVAAP- 28 Mustard Agent Burial Site, Oct. 14, 2009

Final Investigation of the Under Slab Soils Post Slab and Foundation Removal at RVAAP- 39 Load Lines 5, RVAAP- 40 Load Line 7, RVAAP- 41 Load Line 8, and RVAAP- 43 Load Line 10, Jan. 09, 2009

Final Sampling and Analysis Plan and the Site Safety and Health Plan for the Exposed Soil Sampling and Characterization After Slab and Foundation Removals at RVAAP-39 Load Line 5, RVAAP-40 Load Line 7, RVAAP-41 Load Line 8, and RVAAP-43 Load Line 10, Aug. 1, 2007

Oct. 06, 2009

Remedial Design for RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant, Oct. 1, 2009

Operations and Maintenance Quarterly Effectiveness Evaluation Reports (#4) and Barrier Repairs Time Critical Response Action for the Rocket Ridge Area of RVAAP-004-R-01 Open Demolition Area #2, Sept. 02, 2009

Sept. 28, 2009

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, September Trip Report (#12), Sept. 2, 2009

Wetlands and Other Waters Delineation Report Remedial Action Areas at Ramsdell Quarry Landfill, Load Line 12, and Fuze and Booster Quarry Landfill/Ponds at the Ravenna Army Ammunition Plant and Ravenna Training and Logistics Site, Ravenna, Ohio. Dec. 29, 2008

Final Ravenna Army Ammunition Plant's Facility Wide Surface Water Assessment Workplan, Jan. 27, 2003

Sept. 17, 2009

Final Project Management Plan for 14 Military Munitions Response Program Areas of Concern at Ravenna Army Ammunition Plant, Sept 14, 2009

Final Work Plan Performance-Based Acquisition for Environmental Investigation and Remediation MEC Avoidance/Removal Services, Sept 09. 2009

Sept. 1, 2009 Final Project Completion Report for the Munitions Response for Demolition of Load Lines 5, 7, Building 1039, and Transite Removal at Building T-1604, Volume 1 Main Text and Appendices A-C, Dec 13, 2007
Aug 31, 2009

Final Work Plan Addendum 1 for the Sampling of Soils Below Floor Slabs and Remediation at RVAAP- 08 Load Line 1 and Other Building Locations at Ravenna Army Ammunition Plant, Aug. 3, 2009

Final of the Facility-Wide Groundwater Monitoring Program Report on the January 2009 Sampling Event, July 31, 2009

Final Sampling and Analysis Plan for the Remedial Investigation of RVAAP- 67 Facility-wide Sewers Addendum No. 1 at Ravenna Army Ammunition Plant, July 31, 2009

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, July Trip Report (#11), July 29, 2009

Addendum to the Final Site Safety and Health Plan, Time Critical Removal Action at the Rocket Ridge Are within RVAAP- 004-R-01 Open Demolition Area #2 MRS at Ravenna Army Ammunition Plant, July 17, 2009

Final Ravenna Army Ammunition Plant Facility Wide Ecological Risk Work Plan, April 21, 2003

July 22, 2009

Final Data Quality Objectives for the RVAAP- 34 Sand Creek Disposal Road Landfill at Ravenna Army Ammunition Plant, Version 1.0,

Final Geophysical Investigation Plan for RVAAP- 34 Sand Creek Disposal Road Landfill, RVAAP- 03 Open Demolition Area #1 and RVAAP- 28 Mustard Agent Burial Site at Ravenna Army Ammunition Plant, Version 1.0, >

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report sTime Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, June Trip Report (#10), June 24, 2009

July 08, 2009

Final Public Involvement Plan Addendum for Rocket Ridge at Ravenna Army Ammunition Plant, 6/30/09

Final Project Work Plan for the Time Critical Removal Action (TCRA) at Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2 at Ravenna Army Ammunition Plant. 6/30/09

Final Project Management Plan for the Time Critical Removal Action (TCRA) at the Rocket Ridge Area of RVAAP-04 Open Demolition Area #2 at Ravenna Army Ammunition Plant, 6/30/09

Final Remedial Design for RVAAP- 16 Fuze and Booster Quarry Landfill Ponds at Ravenna Army Ammunition Plant, 6/26/09

Final Position Paper for the Application and Use of Facility-Wide Human Health Cleanup Goals, 6/1/09

Radiation Survey Report No. CESWT-SO-R2-05-98 Monazite AOC at Ravenna Army Ammunition Plant, 5/18/98

June 26, 2009

Final Facility-Wide Groundwater Monitoring Program Report on the October 2008 Sampling Event at Ravenna Army Ammunition Plant, June 15, 2009

June 18, 2009

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report (#3) Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, May Trip Report (#9), May 27, 2009

Final Data Quality Objectives for the RVAAP- 28 Mustard Agent Burial Site at Ravenna Army Ammunition Plant, Version 1.0, May 11, 2009

May 7, 2009

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report sTime Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, April Trip Report (#8), Apr 28, 2009

Final Remedial Action Completion Report for the Remediation of Soils and Dry Sediments at RVAAP- 08 Load Line 1, RVAAP- 09 Load Line 2, RVAAP- 10 Load Line 3, and RVAAP- 11 Load Line 4 at Ravenna Army Ammunition Plant, June 30, 2008

Final of the Time Critical Response Action Plan for the Rocket Ridge Area at RVAAP-04 Open Demolition Area #2, Mar. 1, 2008

Apr 30, 2009

Final Record of Decision for Soil and Dry Sediment at RVAAP- 49 Central Burn Pits at Ravenna Army Ammunition Plant, Apr 21, 2009

Final Sampling and Analysis Plan for Groundwater Sampling at RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant, Addendum 1, Apr 14, 2009

Apr 14, 2009 Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Report sTime Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, March Trip Report (#7), Mar, 25, 2009
Mar 31, 2009

Final Record of Decision for Soil and Dry Sediment for RVAAP- 01 Ramsdell Quarry Landfill at Ravenna Army Ammunition Plant. Mar 24, 2009

Final Record of Decision for Soil and Dry Sediment for RVAAP- 12 Load Line 12 at Ravenna Army Ammunition Plant. Mar 20, 2009

Final Facility-Wide Groundwater Monitoring Program Report on the July 2008 Sampling Event, Volume 1-6, Feb. 12, 2009

Final Revised Operations and Maintenance Plan Sand Creek Barrier System, Time Critical Response Action Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Site-Specific Health and Safety Plan, Aug 7, 2008

Final Revised Operations and Maintenance Plan Sand Creek Barrier System, Time Critical Response Action Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Explosive Site Plan, Aug 7, 2008

Final Revised Operations and Maintenance Plan for the Sand Creek Barrier System, the Time Critical Response Action at the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, Military Munitions Response Program, Aug 7, 2008

Final Project Coordination Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3),
Mar 13, 2008

Final Facility-Wide Groundwater Monitoring Program Report on the April 2007 Sampling Event. Nov 27, 2007.

Mar. 26, 2009

Final Remedial Design/Removal Action Plan for RVAAP- 34 Sand Creek Disposal Road Landfill at Ravenna Army Ammunition Plant 3/21/2004

Feb. 19, 2009 Final Remedial Action work Plan for RVAAP-05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, July 27, 2008
Feb. 9, 2009

Final Work Plan for the Removal of Buildings and Concrete Floor Slabs at RVAAP- 08 Load Line 1 and Other Miscellaneous Buildings and Removal and Disposal of Pallets at Ravenna Army Ammunition Plant, Jan 16, 2009

Final Accident Prevention Plan for the Removal of Buildings and Concrete Floor Slabs at RVAAP- 08 Load Line 1 and Other Miscellaneous Buildings and Removal & Disposal of Pallets at Ravenna Army Ammunition Plant, Jan 16, 2009

Final Project completion Report for the Munitions Response for Demolition of Load Lines 5, 7, Building 1039, and Transite Removal at Building T-1604, Removal of Remaining Concrete and Miscellaneous Debris at Load Lines 6, 9 and 11. Dec. 13, 2007

Jan, 12, 2009

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, November Trip Report (#4), Nov 19, 2008

Report on the Field Survey of Concrete Monuments at Ravenna Army Arsenal, Jan 6, 1999

Jan, 9, 2009

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, December Trip Report (#5), Dec. 16, 2008

Final Archives Search Report for Ravenna Army Ammunition Plant, Jun. 1, 2004

Jan, 5, 2009

Final Sampling and Analysis Plan Addendum No. 1 for the Deep Bedrock Well Installation in the Basal Sharon Conglomerate. 12/19/2008

Final Project Management Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation. 12/19/2008

Final Removal Action Report for the RVAAP- 49 Central Burn Pits, Dec. 05, 2008

Final Contractor Quality Control Plan for the Remedial Action at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Nov. 17, 2008

Final Facility-Wide Groundwater Monitoring Program Report on the April 2008 Sampling Event, Nov. 10, 2008

Final Facility-Wide Groundwater Monitoring Program Background Calculation Update, Oct 28, 2008

Final Quality Assurance Project Plan Part II Addendum of the MEC Clearance and Munitions Response for RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Oct. 27. 2008

Final Field Sampling and Analysis Plan MEC Clearance and Munitions Response Amendment 1 for RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Oct. 24, 2008

Operations and Maintenance Trip Reports and Quarterly Effectiveness Evaluation Reports Time Critical Response Action for the Rocket Ridge Area of RVAAP- 04 Open Demolition Area #2, OctoberTrip Report, Oct. 23, 2008

Final Explosives Safety Submission for the Munitions and Explosives of Concern Survey and Munitions Response of RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Revision 3, Amendment 3, Oct. 9, 2008

Final Site Safety and Health Plan Amendment for the Phase II MEC Clearance and Munition Response at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Sept. 04, 2008

Final Project Management Plan for RVAAP- 05 Winklepeck Burning Grounds Remedial Design/Remedial Action, Revision 2, Sept. 4, 2008

Final Phase I Remedial Investigation Report for RVAAP-03 Demolition Area #1 at Ravenna Army Ammunition Plant, Dec, 2001

Dec. 5, 2008 Proposed Plan for the Soil and Dry Sediment at the RVAAP-49 Central Burn Pits
Oct. 29, 2008

Final Record of Decision for Soil and Dry Sediment at RVAAP- 05 Winklepeck Burning Grounds at Ravenna Army Ammunition Plant, Aug. 6, 2008

Documents Summarizing Ammunition Production at Ravenna Arsenal between 1941 - 1974, Jan. 1, 1974

Oct. 24, 2008

Final Construction Completion Report Time Critical Response Action for the Rocket Area of RVAAP- 04 Open Demolition Area #2 Military Munitions Response Program, Sept. 23, 2008

Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation at Ravenna Army Ammunition Plant, Sept, 18, 2008

Final Facility-Wide Groundwater Monitoring Program Background Calculation Update, Sept, 12, 2008

Final Project Management Plan for RVAAP-05 Winklepeck Burning Grounds Remedial Design/Remedial Action, Revision 2, Sept 4 2008

Final of the Facility-Wide Groundwater Monitoring Program Report of the January 2008 Sampling Event, Main Text and Appendices A-C, Volume 1-3, Aug. 22, 2008

August 7, 2008

Ravenna Army Ammunition Plant Deliverable Document Format Guidelines, Version 7.0, Aug. 2008

August 4, 2008

Final Remedial Investigation Report Addendum No. 1 for the RVAAP- 49 Central Burn Pits at Ravenna Army Ammunition Plant, June 2008

June 24, 2008

Final of the Work Plan for the Sampling of Soils Below Floor Slabs at Load Lines 2-4 and Excavation and Transportation of Contaminated Soils to Load Line 4 (Buildings G-1, G-1A, and G-3), May 29, 2008

Final Report on the Geophysical Investigation of RVAAP-28 the Suspected Mustard Agent Burial Site. May 21, 2008

June 12, 2008 Final Report on the Geophysical Investigation of RVAAP-28 the Suspected Mustard Agent Burial Site. May 21, 2008
June 5, 2008

RVAAP Site Tour Agenda - 1968

May 15, 2008

Final Site Inspection for the Military Munitions Response Program, May 2008

RVAAP’s Facility Wide Human Health Risk Assessor Manual Amendment 1. 01 Dec 2005

May 13, 2008

Final Report for the Phase I Remedial Investigation at RVAAP-42 Load Line 9, Volume 1-4, Oct 2007

Final Report for the Phase I Remedial Investigation of RVAAP-33 Load Line 6, Volume 1- 4, Aug 2007

May 12, 2008

Final Facility-Wide Groundwater Monitoring Program Report on the October 2007 Sampling Event, Volume 1 – Main Text and Appendices A-C, Apr 2008

May 9, 2008

Final Removal Action Work Plan for RVAAP-49 Central Burn Pits, Aug 2007

Final Safety, Health and Emergency Response Plan Addendum for the Remediation of Soils at Load Lines 1, 2, 3, and 4, June 2007

Final Sampling and Analysis Plan Addendum No. 2 for the Phase I Remedial Investigation of Ramsdell Quarry Landfill, June 2006

Final Report on the Additional Groundwater Monitoring Well Installation and Groundwater Sampling at the Suspected RVAAP-28 Mustard Agent Burial Site, May 2006

Final Facility Wide Groundwater Monitoring Program Report on the May 2006 Sampling Event, Oct 2006

Final Facility Wide Groundwater Monitoring Program Report on the April 2005 Sampling Event, Aug 2005

Final Phase I Remedial Investigation December 2004 Follow-On Groundwater Sampling at RVAAP-01 Ramsdell Quarry Landfill, June 2005

Final Site Safety and Health Plan for the Phase II MEC Clearance and Munitions Response at RVAAP-05 Winklepeck Burning Grounds, Mar. 2005

Final Work Plan for Phase II MEC Clearance and Munitions Response at RVAAP-05 Winklepeck Burning Grounds, Mar. 2005

Revised Final Focused Feasibility Study for RVAAP-05 Winklepeck Burning Grounds, Mar, 2005

Final Phase I MEC Density Survey After Action Report at RVAAP-05 Winklepeck Burning Grounds, Mar, 2005

Final Facility Wide Groundwater Monitoring Program Annual Report for 2005

Final Facility Wide Groundwater Monitoring Program Report on the July 2005 Sampling Event-Main Report and Appendices A-C, Nov 2005

Final Work Plan and Sampling and Analysis Addenda for the Groundwater Monitoring Well Installation and Groundwater Sampling at the Suspected RVAAP-28 Mustard Agent Burial Site, Nov 2004

Final Proposed Remedial Goal Options for Soil at RVAAP- 08, 09, 10, and 11 Load Lines 1- 4, Sept. 2004

Final Report for the Assessment of Potential Contamination at the DLA Outdoor Storage Areas, Aug, 2003

Final Site Safety and Health Plan Addendum No. 1 for the Phase II Remedial Investigation of RVAAP-12 Load Line 12, Sept, 2000

Final Site Safety and Health Plan Addendum No. 1 for the Phase I Remedial Investigation of Demolition Area #1, Oct 1999

May 1, 2008 Final Remedial Action Work Plan Remediation of Soils at Load Lines 1- 4  (RVAAP- 08, 09, 10, and 11) 4/5/2007
Apr. 4, 2008 Final Characterization of 14 AOCs at Ravenna Army Ammunition Plant, March 2007.
Mar. 06, 2008

Final Construction Completion Report, Munitions Response for the Demolition of RVAAP-41 Load Line 8 and RVAAP-43 Load Line 10, Addendum 1 Demolition of Building 1034, Mar. 2008

Final Letter Report Work Plan for the Sampling of Soils Below Floor Slabs at RVAAP- 09, 10, and 11 Load Lines 2, 3, and 4 and Excavation and Transportation of Contaminated Soils to RVAAP- 11 Load Line 4 (Buildings G-1, G-1A and G-3) Feb.2008

Feb. 12, 2008

Final Record of Decision for Soil and Dry Sediment at the RVAAP-02 Erie Burning Grounds, Sept 19, 2007

Final Record of Decision for Soil and Dry Sediment at the RVAAP-04 Open Demolition Area #2, Sept 19, 2007

Final Record of Decision for Soil and Dry Sediment at the RVAAP-16 Fuze and Booster Quarry Landfill/Ponds, Sept 19, 2007

Jan. 25, 2008 Final Revised Interim Record of Decision for the Remediation of Soils at RVAAP-08, 09, 10, 11 Load Lines 1 – 4, Jan.18, 2007
Jan. 16, 2008 Installation Action Plan for Ravenna Army Ammunition Plant. FY 2007, January, 2008
Sept. 27 , 2007 Hazardous and Medical Waste Study No. 37-EF-5360-99 Relative Risk Site Evaluation for Newly Added Sites. October 1998
Aug. 31, 2007

Closure, Completion of Closure for RVAAP-14 Load Line 6 Evaporation Unit. January 1993

Closure, Completion of Partial Closure of RVAAP-07 Building 1601 Hazardous Waste Storage and RVAAP-05 Winklepeck Burning Grounds (OBG). May 1999

Closure, Final Closure Inspection of RVAAP-01 Ramsdell Quarry Landfill. Sept. 1990

Closure, Final Closure Report Approval for Buildings W-221 and X-232. July 2000

Closure, Final Closure Report for RVAAP-37 Pesticide Storage Building T-4452. Sept. 2000

Closure, No Further Action for RVAAP-27 Building 854-PCB Storage. Sept. 1999

Closure, No Further Action, Statement of Basis for the Final Decision for RVAAP-47 Building T-5301 Interim Removal Action. Dec. 2000

July 18, 2007

Final Stormwater Pollution Prevention Plan Remediation of Soils at RVAAP-08, 09, 10, and 11, Load Lines 1-4. July 12, 2007. Shaw.

July 09, 2007

Final Facility-wide Groundwater Monitoring Program Report on the January 2007 Sampling Event (Sample Event No. 1). July 9, 2007. SpecPro Inc.

June 26, 2007

Final Action Memorandum for Central Burn Pits (RVAAP-49, Ravenna Army Ammunition Plant, Ravenna, Ohio. June 2007

Apr. 02, 2007

Final Proposed Plan for Soil and Dry Sediment at Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007.

Final Proposed Plan for Soil and Dry Sediment at the Ramsdell Quarry Landfill (RVAAP-01) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007

Final Proposed Plan for Soil and Dry Sediment at Load Line 12 (RVAAP-12) Ravenna Army Ammunition Plant, Ravenna, Ohio. March 2007

Final Facility-Wide Groundwater Monitoring Program Plan For The Ravenna Army Ammunition Plant Ravenna, Ohio. September 2004

Mar. 20, 2007 Public Presentation for Proposed Plans at Erie Burning Grounds and Open Demolition Area #2, March 13, 2007
Feb. 27, 2007 Final Proposed Plan for Soil and Dry Sediment at Open Demolition Area #2 (RVAAP- 04) Ravenna Army Ammunition Plant Ravenna, Ohio February 2007
Feb. 27, 2007 Final Proposed Plan for Soil and Dry Sediment at Erie Burning Grounds (RVAAP-02) Ravenna Army Ammunition Plant Ravenna, Ohio February 2007
Jan. 31, 2007 Final Engineering Evaluation/Cost Analysis for Central Burn Pits (RVAAP-49) Ravenna Army Ammunition Plant, Ravenna, Ohio, January 2007
Jan. 19, 2007 Final Focused Feasibility Study for the Remediation of Soils at LLs 1-4, RVAAP May 2005

Final Phase II Remedial Investigation at the Upper and Lower Cobbs Pond (AOC 29) September 2005

Final Report Interim Removal Action at Load Line 11 (AOC-44) March 2004

Final Remedial Investigation at Load Line 11 (AOC-44) September 2005

Final Report for Remedial Design/Removal Action at Paris-Windham Road Dump (AOC-51) at RVAAP March 2004

Final Sampling and Analysis Plan Addendum for the Characterization of 14 RVAAP AOCs at RVAAP Oct. 2004

Nov. 8, 2006

Ravanna Army Ammunition Plant Director's Final Findings and Orders

Final Facility-Wide Groundwater Monitoring Program Plan For The Ravenna Army Ammunition Plant Ravenna, Ohio. September 2004

Oct. 31, 2006

Revised Final Feasibility Study for Ramsdell Quarry Landfill (RVAAP-01), Ravenna Army Ammunition Plant, Ravenna, Ohio, October 2006

Sept. 29, 2006

Final Addendum to the Phase II Remedial Investigation Report for Erie Burning Grounds (RVAAP-02) Ravenna Army Ammunition Plant Ravenna, Ohio. September 2006

Sept. 15, 2006 Revised Final Report On The Biological Field-Truthing Effort At Winklepeck Burning Grounds At Ravenna Army Ammunition Plant, Ravenna, Ohio. August 2006
Sept. 13, 2006 Final Addendum to the Phase II Remedial Investigation Report for Open Demolition Area #2 (RVAAP-04) Ravenna Army Ammunition Plant Ravenna, Ohio. September 2006.
July 21, 2006

Final Feasibility Study for Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant Ravenna, Ohio July 2006

July 17, 2006

Final Feasibility Study for Ramsdell Quarry Landfill (RVAAP-01) Ravenna Army Ammunition Plant Ravenna, Ohio July 2006
(see revised document, Oct. 31, 2006)

Final Feasibility Study for Load Line 12 (RVAAP-12) Ravenna Army Ammunition Plant Ravenna, Ohio July 2006

April 7, 2006

Final Phase II Remedial Investigation Report for the Open Demolition Area #2 (RVAAP-04) at the Ravenna Army Ammunition Plant Ravenna, Ohio September 2005

April 4, 2006

Final Facility-Wide Biological and Water Quality Study 2003 Ravenna Army Ammunition Plant November 2005

Final Phase II Remedial Investigation Supplemental Report for Load Line 12 (Rvaap-12) at the Ravenna Army Ammunition Plant, Ravenna, Ohio November 2005

Final Phase I/Phase II Remedial Investigation of the Fuze and Booster Quarry Landfill/Ponds (RVAAP-16) Ravenna Army Ammunition Plant Ravenna, Ohio November 2005

Final Phase I Remedial Investigation Report for Ramsdell Quarry Landfill at the Ravenna Army Ammunition Plant, Ravenna, Ohio September 2005

Final Phase II Remedial Investigation Report for Erie Burning Grounds (Rvaap-02) at the Ravenna Army Ammunition Plant, Ravenna, Ohio September 2005

Final Remedial Investigation Report for the Central Burn Pits (Rvaap-49) at the Ravenna Army Ammunition Plant Ravenna, Ohio September 20, 2005