Title: Final Facility-Wide Groundwater Monitoring Program Report on the October 2008 Sampling Event at Ravenna Army Ammunition Plant, Volumes 1 - 6

 

Description and Link

File Name

Size (Mbyte)

F_FW_GWMP_1008_SE Main text

F_FW_GWMP_1008_SE.pdf

2.77

Appendices & Plates

 

 

Appendix A Correspondence Documenting The Change In Wells To Be Sampled In 2008

F_FW_GWMP_1008_SE_Appendix_A.pdf

.27

Appendix B List Of Wells Sampled During The October 2008 Event

F_FW_GWMP_1008_SE_Appendix_B.pdf

.26

Appendix C Water Level Measurements/Field Log Book And Purge Records/Daily Quality Control Reports

F_FW_GWMP_1008_SE_Appendix_C.pdf

7.97

Appendix D Data Certification Reports/Laboratory Data Sheets

F_FW_GWMP_1008_SE_Appendix_D.pdf

199.13

Appendix E Investigative Derived Waste Characterization And Disposal Plan

F_FW_GWMP_1008_SE_Appendix_E.pdf

1.59

Appendix F Reporting Limits That Currently Do Not Meet The RVAAP QAPP PQLS And/Or Region 9 PRGS

F_FW_GWMP_1008_SE_Appendix_F.pdf

.27

Appendix G Correspondence & Comment/Response Table

F_FW_GWMP_1008_SE_Appendix_G.pdf

.55

Plates 1, 2, & 3

F_FW_GWMP_1008_SE_Plates_1_2_3.pdf

6.80